Assuming that the design with BIM platform will support up to replace the canonical means used for the development of the building process in all its stages (from preliminary to final until the executive and the site itself) this advanced method was used to address the construction phase of the works of a structural intervention already made. Analyzing the structural works of the construction site is initially addressed an examination concerning the degree of information necessary to precisely of each technical element according to the LOD taken into account. Then developing the graphic art characterized by a greater level of detail you have set the whole process of the construction site of the execution of the structural works, adding three-dimensional model to the time schedule of the construction phase. In parallel, analyzing the project enterprise side, for optimization of resources, was carried out a detailed analysis on how the implementation of certain technical elements of the project, comparing the use of the means of construction, the associated costs, labor used and the degree of pollution consequently generated, so that it can be more immediate, in the complexity of the variables involved in this dynamic environment and unpredictable what is a construction site, make a choice the most economically rational and efficient, especially taking into account also the restrictive European regulations and protocols that require low emissions of pollutants.

Partendo dal presupposto che la progettazione con piattaforma BIM affiancherà fino a sostituirsi ai mezzi canonici utilizzati per lo sviluppo del processo edilizio in tutte le sue fasi (a partire dalla preliminare, alla definitiva fino all’esecutivo e al cantiere stesso) si è utilizzato appunto questo avanzato modello di progettazione informatica per affrontare la fase di cantiere delle opere strutturali di un intervento già realizzato. Analizzando le opere strutturali del cantiere si è affrontato inizialmente un esame riguardante il grado di informazione necessario proprio di ogni elemento tecnico a seconda del LOD preso in considerazione. Sviluppando poi l’elaborato grafico caratterizzato da un maggiore livello di dettaglio si è impostato l’intero processo di cantiere dell’esecuzione delle opere strutturali, affiancando al modello tridimensionale il cronoprogramma delle fasi di cantiere. Parallelamente, analizzando il progetto lato impresa, per un’ottimizzazione delle risorse, è stata svolta un’analisi dettagliata sulle modalità di messa in opera di alcuni elementi tecnici del progetto, comparandone l’utilizzo dei mezzi di cantiere, i costi associati, la manodopera utilizzata e il grado di inquinamento conseguentemente generato, affinché possa essere più immediato, nella complessità delle variabili in gioco di un ambiente così dinamico e poco prevedibile qual è un cantiere edile, compiere una scelta economicamente più ragionata ed efficiente, tenendo conto soprattutto anche delle restrittive normative e protocolli europei che richiedono il contenimento delle emissioni di inquinanti.

Analisi dinamica delle scelte costruttive con il supporto della piattaforma parametrica BIM

RIGNANESE, MARCO
2013/2014

Abstract

Assuming that the design with BIM platform will support up to replace the canonical means used for the development of the building process in all its stages (from preliminary to final until the executive and the site itself) this advanced method was used to address the construction phase of the works of a structural intervention already made. Analyzing the structural works of the construction site is initially addressed an examination concerning the degree of information necessary to precisely of each technical element according to the LOD taken into account. Then developing the graphic art characterized by a greater level of detail you have set the whole process of the construction site of the execution of the structural works, adding three-dimensional model to the time schedule of the construction phase. In parallel, analyzing the project enterprise side, for optimization of resources, was carried out a detailed analysis on how the implementation of certain technical elements of the project, comparing the use of the means of construction, the associated costs, labor used and the degree of pollution consequently generated, so that it can be more immediate, in the complexity of the variables involved in this dynamic environment and unpredictable what is a construction site, make a choice the most economically rational and efficient, especially taking into account also the restrictive European regulations and protocols that require low emissions of pollutants.
VILLA, VALENTINA
ING VI - Scuola di Ingegneria Edile-Architettura
29-apr-2015
2013/2014
Partendo dal presupposto che la progettazione con piattaforma BIM affiancherà fino a sostituirsi ai mezzi canonici utilizzati per lo sviluppo del processo edilizio in tutte le sue fasi (a partire dalla preliminare, alla definitiva fino all’esecutivo e al cantiere stesso) si è utilizzato appunto questo avanzato modello di progettazione informatica per affrontare la fase di cantiere delle opere strutturali di un intervento già realizzato. Analizzando le opere strutturali del cantiere si è affrontato inizialmente un esame riguardante il grado di informazione necessario proprio di ogni elemento tecnico a seconda del LOD preso in considerazione. Sviluppando poi l’elaborato grafico caratterizzato da un maggiore livello di dettaglio si è impostato l’intero processo di cantiere dell’esecuzione delle opere strutturali, affiancando al modello tridimensionale il cronoprogramma delle fasi di cantiere. Parallelamente, analizzando il progetto lato impresa, per un’ottimizzazione delle risorse, è stata svolta un’analisi dettagliata sulle modalità di messa in opera di alcuni elementi tecnici del progetto, comparandone l’utilizzo dei mezzi di cantiere, i costi associati, la manodopera utilizzata e il grado di inquinamento conseguentemente generato, affinché possa essere più immediato, nella complessità delle variabili in gioco di un ambiente così dinamico e poco prevedibile qual è un cantiere edile, compiere una scelta economicamente più ragionata ed efficiente, tenendo conto soprattutto anche delle restrittive normative e protocolli europei che richiedono il contenimento delle emissioni di inquinanti.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2015_04_Rignanese.pdf

non accessibile

Descrizione: Testo della tesi
Dimensione 7.99 MB
Formato Adobe PDF
7.99 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/107570