In the world of traditional design it configures a temporary organization fragmented into several independent professional profiles, who make interdependent decisions. From these features derive uncertainties and conflicts that characterize the building process. Integrated design, that stands apart from traditional building process, partially reduces this fragmentation. To help this interoperability between the different building process actors, it was introduced a method that aims not only to facilitate the design in all its stages but also give a different approach from the traditional one. This method, known as Building Information Modeling, deals with the creation of a virtual model in which are collected all the information of all the project elements, stored in a powerful database. The choice to apply the BIM approach to the construction site design was born from the desire to propose a new design methodology and graphical representation, which allows to achieve better results in terms of efficiency and safety in the production process. The aim is, therefore, to synthesize a construction site design method in the three levels of detail design (preliminary, definitive and executive), researching and explaining the tools of BIM technology useful to make concrete and efficient this method. It has investigated about the three design levels and their minimum contents. Then it has processed on the three flow diagrams focused on construction site design and later the tools of the exploited in this type of design. It was, therefore, focused the attention on the minimum requirements and the information contained in the model, in order to facilitate and speed up the design process. To demonstrate the above, it was decided to use a simulator project created specifically for the objective pursued. Through this simulator, it was possible to retrace the highlights for the construction site design, emphasizing not only the positive aspects, but also the limitations of the method. Finally, it has proved the method feasibility and the tools usefulness, applying them to the real case of construction site design of a building deconstruction and reconstruction, which is part of the experience gained in the last year of internship

Nel mondo della progettazione tradizionale si configura un’organizzazione temporanea frammentata in più figure professionali indipendenti tra loro, ma che prendono decisioni interdipendenti. Da tali caratteristiche scaturiscono le incertezze e i conflitti che contraddistinguono il processo edilizio. Una forma di progettazione che riduce parzialmente questa frammentazione è quella integrata, la quale si discosta dal processo edilizio tradizionale. Per agevolare questa interoperabilità, tra i vari protagonisti del processo edilizio, è stato introdotto un metodo che ha lo scopo non solo di facilitare la progettazione in tutte le sue fasi ma anche dare un approccio diverso da quello tradizionale. Questo metodo, denominato Building Information Modeling verte sulla realizzazione di un modello virtuale nel quale sono raccolte tutte quelle informazioni utili di tutti gli elementi presenti nel progetto, memorizzate all’interno di un potente database. La scelta di voler applicare al progetto di cantiere le dinamiche del BIM nasce dalla volontà di proporre una nuova metodologia di progettazione e rappresentazione grafica, che consente di ottenere risultati migliori in termini di efficienza e sicurezza nel processo produttivo. Si mira, quindi, a sintetizzare un Metodo di progettazione cantieristica nei tre livelli di dettaglio della progettazione (preliminare, definitivo ed esecutivo), ricercando ed esplicitando gli Strumenti della tecnica BIM utili a rendere concreto ed efficiente tale Metodo. Si sono indagati i tre livelli di progettazione e i contenuti minimi che hanno portato all’elaborazione in primis di tre relativi diagrammi di flusso focalizzati sulla progettazione ergotecnica e in seguito degli Strumenti dell’approccio BIM sfruttabili in questo tipo di progettazione. È stata, quindi, focalizzata l’attenzione sui requisiti minimi e le informazioni contenute nel modello necessarie a velocizzare e facilitare il processo di progettazione. Per dimostrare quanto detto, si è scelto di utilizzare un Progetto Simulatore creato appositamente per lo scopo prefissato, attraverso il quale si sono potuti ripercorrere i punti salienti per la progettazione ergotecnica mettendo in risalto non solo gli aspetti positivi, ma anche i limiti del metodo stesso. Infine è stata dimostrata la reale fattibilità del Metodo e l’utilità degli Strumenti trasponendoli alla progettazione cantieristica di un caso reale di decostruzione e ricostruzione di un edificio, facente parte dell’esperienza di tirocinio maturata nell’ultimo anno.

Metodi e strumenti di progettazione cantieristica con tecnica BIM

LONGOBARDI, GIULIA;ALTAMURA, SERENA
2014/2015

Abstract

In the world of traditional design it configures a temporary organization fragmented into several independent professional profiles, who make interdependent decisions. From these features derive uncertainties and conflicts that characterize the building process. Integrated design, that stands apart from traditional building process, partially reduces this fragmentation. To help this interoperability between the different building process actors, it was introduced a method that aims not only to facilitate the design in all its stages but also give a different approach from the traditional one. This method, known as Building Information Modeling, deals with the creation of a virtual model in which are collected all the information of all the project elements, stored in a powerful database. The choice to apply the BIM approach to the construction site design was born from the desire to propose a new design methodology and graphical representation, which allows to achieve better results in terms of efficiency and safety in the production process. The aim is, therefore, to synthesize a construction site design method in the three levels of detail design (preliminary, definitive and executive), researching and explaining the tools of BIM technology useful to make concrete and efficient this method. It has investigated about the three design levels and their minimum contents. Then it has processed on the three flow diagrams focused on construction site design and later the tools of the exploited in this type of design. It was, therefore, focused the attention on the minimum requirements and the information contained in the model, in order to facilitate and speed up the design process. To demonstrate the above, it was decided to use a simulator project created specifically for the objective pursued. Through this simulator, it was possible to retrace the highlights for the construction site design, emphasizing not only the positive aspects, but also the limitations of the method. Finally, it has proved the method feasibility and the tools usefulness, applying them to the real case of construction site design of a building deconstruction and reconstruction, which is part of the experience gained in the last year of internship
CASSANO, MANUELE
TODARO, DAVIDE
ING VI - Scuola di Ingegneria Edile-Architettura
28-lug-2015
2014/2015
Nel mondo della progettazione tradizionale si configura un’organizzazione temporanea frammentata in più figure professionali indipendenti tra loro, ma che prendono decisioni interdipendenti. Da tali caratteristiche scaturiscono le incertezze e i conflitti che contraddistinguono il processo edilizio. Una forma di progettazione che riduce parzialmente questa frammentazione è quella integrata, la quale si discosta dal processo edilizio tradizionale. Per agevolare questa interoperabilità, tra i vari protagonisti del processo edilizio, è stato introdotto un metodo che ha lo scopo non solo di facilitare la progettazione in tutte le sue fasi ma anche dare un approccio diverso da quello tradizionale. Questo metodo, denominato Building Information Modeling verte sulla realizzazione di un modello virtuale nel quale sono raccolte tutte quelle informazioni utili di tutti gli elementi presenti nel progetto, memorizzate all’interno di un potente database. La scelta di voler applicare al progetto di cantiere le dinamiche del BIM nasce dalla volontà di proporre una nuova metodologia di progettazione e rappresentazione grafica, che consente di ottenere risultati migliori in termini di efficienza e sicurezza nel processo produttivo. Si mira, quindi, a sintetizzare un Metodo di progettazione cantieristica nei tre livelli di dettaglio della progettazione (preliminare, definitivo ed esecutivo), ricercando ed esplicitando gli Strumenti della tecnica BIM utili a rendere concreto ed efficiente tale Metodo. Si sono indagati i tre livelli di progettazione e i contenuti minimi che hanno portato all’elaborazione in primis di tre relativi diagrammi di flusso focalizzati sulla progettazione ergotecnica e in seguito degli Strumenti dell’approccio BIM sfruttabili in questo tipo di progettazione. È stata, quindi, focalizzata l’attenzione sui requisiti minimi e le informazioni contenute nel modello necessarie a velocizzare e facilitare il processo di progettazione. Per dimostrare quanto detto, si è scelto di utilizzare un Progetto Simulatore creato appositamente per lo scopo prefissato, attraverso il quale si sono potuti ripercorrere i punti salienti per la progettazione ergotecnica mettendo in risalto non solo gli aspetti positivi, ma anche i limiti del metodo stesso. Infine è stata dimostrata la reale fattibilità del Metodo e l’utilità degli Strumenti trasponendoli alla progettazione cantieristica di un caso reale di decostruzione e ricostruzione di un edificio, facente parte dell’esperienza di tirocinio maturata nell’ultimo anno.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2015_07_Longobardi_Altamura_01.pdf

non accessibile

Descrizione: Testo della tesi
Dimensione 38.94 MB
Formato Adobe PDF
38.94 MB Adobe PDF   Visualizza/Apri
2015_07_Longobardi_Altamura_02.pdf

non accessibile

Descrizione: Tavole di progetto
Dimensione 24.81 MB
Formato Adobe PDF
24.81 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/109420