The main EPC Contractors’ background is going through a period of deep transformations; the growing plant complexity, new Players from Far East and the reduction in the realization period intensify the international competition, encouraging the companies to re-adapt their own strategy. This work, developed in Tecnimont S.p.a., finds its application in the competitive bidding phase of a project. During this stage EPC companies compete through an international tender, with the aim to award an EPC contract for a turnkey plant. The first part shows a method that allows piping material quantities estimate, and fabrication and erection works. This method has been tested on a sample of plants that belong to different technologies and demonstrates the existence of a direct relationship between plant capacity and piping components size. The peculiarity of this methodology is the use of a minimum number of input data. The second part of the work defines a standard set of parameters, suitable to quantify the amount of mechanical works required for the erection of equipment and complex packages. It has been also developed a method to exchange information among Vendor, Main Contractor and mechanical subcontractor, both in the offer and in the executive phase of a project, in order to build a database that makes the information about old projects available. Furthermore, this methodology guarantees to make an internal man-hours estimation for equipment and package erection during offers and, moreover, it clearly defines the Scope of Work and the delivery status of materials on site.

Il contesto in cui operano i maggiori EPC Contractor attraversa un periodo di trasformazione; la crescente complessità degli impianti, nuovi Player localizzati in particolare nel Far East e la riduzione dei tempi di realizzazione, intensificano la competizione internazionale stimolando le aziende a riadattare la propria strategia. Il presente lavoro, sviluppato in Tecnimont S.p.a., si inserisce nell’ambito del Competitive Bidding, in cui le diverse società di impiantistica si trovano a concorrere in una gara internazionale d’appalto, al fine di conseguire l’aggiudicazione di un contratto per la realizzazione di un impianto complesso. Rimanendo nell’ottica della preparazione di un’offerta, il lavoro è stato diviso in due parti principali. Nella prima parte è stato elaborato un metodo che, testato su un campione di impianti appartenenti a diverse tecnologie, permette di determinare le relazioni tra la capacità d’impianto e le dimensioni della componentistica di piping, al fine di stimarne le quantità in termini di peso e lavori di fabbricazione e montaggio. Sfruttando alcune varianti di una metodologia base, è stato possibile stimare le quantità relative ai sistemi di tubazioni di un impianto, utilizzando un numero minimo di dati di input. Nella seconda parte del lavoro è stato invece definito un set standard di parametri caratteristici atti a quantificare l’ammontare dei lavori meccanici per il montaggio di differenti tipologie di apparecchiature e package. È stata inoltre proposta una metodologia di scambio informazioni tra fornitore, contrattore principale e sub-contrattore meccanico, sia nella fase di offerta che nella fase di progetto esecutivo, al fine di consentire un’archiviazione dei dati che renda disponibili e fruibili le informazioni di progetti passati. Questa metodologia consentirà la stima interna delle ore-uomo relative al montaggio delle apparecchiature in fase di offerta, ma garantirà anche l’ulteriore vantaggio di definire e monitorare in maniera chiara lo scopo del lavoro e lo stato di arrivo dei materiali in cantiere.

Competitive bidding nei progetti EPC in ambito impiantistico. Metodologie di stima delle quantità piping e definizione di parametri standard per la quantificazione dei lavori di montaggio di apparecchiature complesse

GERVASONI, MATTEO;MANTOVANI, NICOLÒ
2015/2016

Abstract

The main EPC Contractors’ background is going through a period of deep transformations; the growing plant complexity, new Players from Far East and the reduction in the realization period intensify the international competition, encouraging the companies to re-adapt their own strategy. This work, developed in Tecnimont S.p.a., finds its application in the competitive bidding phase of a project. During this stage EPC companies compete through an international tender, with the aim to award an EPC contract for a turnkey plant. The first part shows a method that allows piping material quantities estimate, and fabrication and erection works. This method has been tested on a sample of plants that belong to different technologies and demonstrates the existence of a direct relationship between plant capacity and piping components size. The peculiarity of this methodology is the use of a minimum number of input data. The second part of the work defines a standard set of parameters, suitable to quantify the amount of mechanical works required for the erection of equipment and complex packages. It has been also developed a method to exchange information among Vendor, Main Contractor and mechanical subcontractor, both in the offer and in the executive phase of a project, in order to build a database that makes the information about old projects available. Furthermore, this methodology guarantees to make an internal man-hours estimation for equipment and package erection during offers and, moreover, it clearly defines the Scope of Work and the delivery status of materials on site.
ANZOINO, ENRICO
ROSI, MASSIMO
ING - Scuola di Ingegneria Industriale e dell'Informazione
27-apr-2016
2015/2016
Il contesto in cui operano i maggiori EPC Contractor attraversa un periodo di trasformazione; la crescente complessità degli impianti, nuovi Player localizzati in particolare nel Far East e la riduzione dei tempi di realizzazione, intensificano la competizione internazionale stimolando le aziende a riadattare la propria strategia. Il presente lavoro, sviluppato in Tecnimont S.p.a., si inserisce nell’ambito del Competitive Bidding, in cui le diverse società di impiantistica si trovano a concorrere in una gara internazionale d’appalto, al fine di conseguire l’aggiudicazione di un contratto per la realizzazione di un impianto complesso. Rimanendo nell’ottica della preparazione di un’offerta, il lavoro è stato diviso in due parti principali. Nella prima parte è stato elaborato un metodo che, testato su un campione di impianti appartenenti a diverse tecnologie, permette di determinare le relazioni tra la capacità d’impianto e le dimensioni della componentistica di piping, al fine di stimarne le quantità in termini di peso e lavori di fabbricazione e montaggio. Sfruttando alcune varianti di una metodologia base, è stato possibile stimare le quantità relative ai sistemi di tubazioni di un impianto, utilizzando un numero minimo di dati di input. Nella seconda parte del lavoro è stato invece definito un set standard di parametri caratteristici atti a quantificare l’ammontare dei lavori meccanici per il montaggio di differenti tipologie di apparecchiature e package. È stata inoltre proposta una metodologia di scambio informazioni tra fornitore, contrattore principale e sub-contrattore meccanico, sia nella fase di offerta che nella fase di progetto esecutivo, al fine di consentire un’archiviazione dei dati che renda disponibili e fruibili le informazioni di progetti passati. Questa metodologia consentirà la stima interna delle ore-uomo relative al montaggio delle apparecchiature in fase di offerta, ma garantirà anche l’ulteriore vantaggio di definire e monitorare in maniera chiara lo scopo del lavoro e lo stato di arrivo dei materiali in cantiere.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2016_04_Gervasoni_Mantovani.pdf

non accessibile

Descrizione: Testo della tesi
Dimensione 6.23 MB
Formato Adobe PDF
6.23 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/121525