The hydroelectric plant project of Entrèves started in 2010 thanks to SEVA srl. The plant uses the melting waters of the glacier Brenva in summer, while in winter, when the ice flows become scarce, the plant uses the flow from the Mont Blanc tunnel drainage system. I propose two alternative designs of the plant pumping of drainage flow, in the first place to overcome the critical problems in the original project. The two alternatives concern on the adoption of variable-speed pump, to increase the hydroelectric plant producibility without any changes to the other civil and electromechanical works initially planned. Pump selection was made through a self-written software to verify its efficiency in the two plant configuration. For each alternative were sized constituent parts of the pumping station, they are assessed the costs and benefits, proceeds from the sale of energy under the law in force. The Alternative 2, proved to be the most advantageous in the economic evaluation conducted, it requires a regulation system that is illustrated in Chapter 4, where some simulations to verify operation are also reported.

Il progetto dell’impianto idroelettrico ad acqua fluente di Entrèves nasce nel 2010 grazie a SEVA srl. L’impianto utilizza le acque di fusione del ghiacciaio della Brenva nella stagione estiva, mentre nella stagione invernale, quando le portate glaciali diventano esigue, quelle provenienti dal sistema di drenaggio del Traforo del Monte Bianco. Si propongono due alternative progettuali dell’impianto di pompaggio della portata di drenaggio, volte in primo luogo al superamento delle criticità presenti nel progetto originario. Le due alternative vertono sull’adozione di un gruppo di pompaggio a velocità variabile, grazie al quale è possibile aumentare la producibilità idroelettrica dell’impianto senza apportare modifiche alle altre opere civili ed elettromeccaniche previste inizialmente. La scelta della pompa è stata effettuata tramite un programma scritto per valutarne l’efficienza nelle due configurazione impiantistiche. Per ogni alternativa sono state dimensionate le parti costituenti la stazione di sollevamento, si sono valutati i costi e i benefici, proventi dalla vendita di energia secondo la legge in vigore. L’Alternativa 2, risultata la più vantaggiosa nella valutazione economica condotta, necessita di un sistema di regolazione che viene illustrato nel Capitolo 4, dove vengono inoltre riportate alcune simulazioni per verificarne il funzionamento.

Analisi tecnico economica di alternative progettuali per l'aumento di producibilità dell'impianto idroelettrico di Entreves

GHIARONI, GABRIELE
2015/2016

Abstract

The hydroelectric plant project of Entrèves started in 2010 thanks to SEVA srl. The plant uses the melting waters of the glacier Brenva in summer, while in winter, when the ice flows become scarce, the plant uses the flow from the Mont Blanc tunnel drainage system. I propose two alternative designs of the plant pumping of drainage flow, in the first place to overcome the critical problems in the original project. The two alternatives concern on the adoption of variable-speed pump, to increase the hydroelectric plant producibility without any changes to the other civil and electromechanical works initially planned. Pump selection was made through a self-written software to verify its efficiency in the two plant configuration. For each alternative were sized constituent parts of the pumping station, they are assessed the costs and benefits, proceeds from the sale of energy under the law in force. The Alternative 2, proved to be the most advantageous in the economic evaluation conducted, it requires a regulation system that is illustrated in Chapter 4, where some simulations to verify operation are also reported.
ING I - Scuola di Ingegneria Civile, Ambientale e Territoriale
21-dic-2016
2015/2016
Il progetto dell’impianto idroelettrico ad acqua fluente di Entrèves nasce nel 2010 grazie a SEVA srl. L’impianto utilizza le acque di fusione del ghiacciaio della Brenva nella stagione estiva, mentre nella stagione invernale, quando le portate glaciali diventano esigue, quelle provenienti dal sistema di drenaggio del Traforo del Monte Bianco. Si propongono due alternative progettuali dell’impianto di pompaggio della portata di drenaggio, volte in primo luogo al superamento delle criticità presenti nel progetto originario. Le due alternative vertono sull’adozione di un gruppo di pompaggio a velocità variabile, grazie al quale è possibile aumentare la producibilità idroelettrica dell’impianto senza apportare modifiche alle altre opere civili ed elettromeccaniche previste inizialmente. La scelta della pompa è stata effettuata tramite un programma scritto per valutarne l’efficienza nelle due configurazione impiantistiche. Per ogni alternativa sono state dimensionate le parti costituenti la stazione di sollevamento, si sono valutati i costi e i benefici, proventi dalla vendita di energia secondo la legge in vigore. L’Alternativa 2, risultata la più vantaggiosa nella valutazione economica condotta, necessita di un sistema di regolazione che viene illustrato nel Capitolo 4, dove vengono inoltre riportate alcune simulazioni per verificarne il funzionamento.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2016_12_Ghiaroni.pdf

non accessibile

Descrizione: Testo della tesi
Dimensione 9.3 MB
Formato Adobe PDF
9.3 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/131467