The BIM practice permits to represent constructions as if they were built, with the chance to integrate all its characterizing elements, from the first planning design of a project, to its construction, management and future disposal; in the same preliminary planning stage interchange different architectural, structural or MEP choices is possible, in order to obtain the optimal result. The research begins from the study of the “Cineteatro Gavazzeni” and tries to comprehend how the project could be improved from the structural point of view, according to new seismic Italian regulations. Reconstructed the model in the Revit interface, the research focuses on the existing information flow between different software used for building system modelling and management, in particular on the integration between the structural and architectural sector of the building; all for the study and the verification of the existing structure. The issue on the exchange of information between the two software is discussed, highlighting the problems, if present. The case study serves as an example to illustrate how with BIM is possible to obtain a correct structural analysis of an existing building, following the standards of the country in which it is built, and, if the standards are updated, upgrade the structure in the same time accordingly. The thesis will focus on how one or more software, if used properly, can give back information useful in the design and building management. The research in facts wants to be part of a larger study of the influences of BIM in the analysis and evaluation of the seismic vulnerability of structures of existing buildings or under construction ones.

Il metodo BIM permette di poter rappresentare così come se fosse costruito un sistema edilizio, potendo integrare tutti i suoi elementi caratterizzanti, dalle fasi di progettazione e di costruzione, alle fasi di gestione e dismissione futura dell'edificio. È possibile intercambiare nella stessa fase progettuale scelte (architettoniche, strutturali o impiantistiche) diverse al fine di ottenere il miglior risultato. La tesi parte dallo studio del Cineteatro Gavazzeni di Seriate, con l’obiettivo di integrare e migliorare, se necessario, il progetto dal punto di vista strutturale sulla base delle nuove normative antisismiche. Ricostruito in CAD BIM il teatro, la ricerca si focalizza sul flusso informativo esistente tra diversi software, usati per la modellazione e gestione del sistema edilizio, in particolar modo sull'integrazione tra l'ambito strutturale e l’ambito architettonico dell'edificio. È stato fatto ciò al fine di studiare e verificare la struttura esistente. Inoltre è approfondito il tema dello scambio di informazioni tra i due software, evidenziando eventuali problematiche. Il caso studio serve come esempio per mostrare come con il BIM sia possibile ottenere una corretta analisi strutturale di un edificio esistente, seguendo le normative del Paese in cui esso è costruito e, all’aggiornamento di queste, adeguarne di conseguenza la struttura. La tesi vuole porre l’attenzione su come l’utilizzo corretto di uno o più software, restituisca una informazione utile alla progettazione del nuovo e alla gestione dell’esistente. La ricerca infatti vuole inserirsi in uno studio più ampio delle influenze del metodo BIM nella valutazione delle vulnerabilità sismiche di strutture esistenti o in fase di realizzazione.

BIM-based structural analysis : the case of the cineteatro Gavazzeni

ROMEO, GIULIA ROSA
2015/2016

Abstract

The BIM practice permits to represent constructions as if they were built, with the chance to integrate all its characterizing elements, from the first planning design of a project, to its construction, management and future disposal; in the same preliminary planning stage interchange different architectural, structural or MEP choices is possible, in order to obtain the optimal result. The research begins from the study of the “Cineteatro Gavazzeni” and tries to comprehend how the project could be improved from the structural point of view, according to new seismic Italian regulations. Reconstructed the model in the Revit interface, the research focuses on the existing information flow between different software used for building system modelling and management, in particular on the integration between the structural and architectural sector of the building; all for the study and the verification of the existing structure. The issue on the exchange of information between the two software is discussed, highlighting the problems, if present. The case study serves as an example to illustrate how with BIM is possible to obtain a correct structural analysis of an existing building, following the standards of the country in which it is built, and, if the standards are updated, upgrade the structure in the same time accordingly. The thesis will focus on how one or more software, if used properly, can give back information useful in the design and building management. The research in facts wants to be part of a larger study of the influences of BIM in the analysis and evaluation of the seismic vulnerability of structures of existing buildings or under construction ones.
COLOMBO, GIOVANNI
PINTI, LIDIA
PONZONI, HEIDI
ROSATI, GIANPAOLO
ARC I - Scuola di Architettura Urbanistica Ingegneria delle Costruzioni
21-dic-2016
2015/2016
Il metodo BIM permette di poter rappresentare così come se fosse costruito un sistema edilizio, potendo integrare tutti i suoi elementi caratterizzanti, dalle fasi di progettazione e di costruzione, alle fasi di gestione e dismissione futura dell'edificio. È possibile intercambiare nella stessa fase progettuale scelte (architettoniche, strutturali o impiantistiche) diverse al fine di ottenere il miglior risultato. La tesi parte dallo studio del Cineteatro Gavazzeni di Seriate, con l’obiettivo di integrare e migliorare, se necessario, il progetto dal punto di vista strutturale sulla base delle nuove normative antisismiche. Ricostruito in CAD BIM il teatro, la ricerca si focalizza sul flusso informativo esistente tra diversi software, usati per la modellazione e gestione del sistema edilizio, in particolar modo sull'integrazione tra l'ambito strutturale e l’ambito architettonico dell'edificio. È stato fatto ciò al fine di studiare e verificare la struttura esistente. Inoltre è approfondito il tema dello scambio di informazioni tra i due software, evidenziando eventuali problematiche. Il caso studio serve come esempio per mostrare come con il BIM sia possibile ottenere una corretta analisi strutturale di un edificio esistente, seguendo le normative del Paese in cui esso è costruito e, all’aggiornamento di queste, adeguarne di conseguenza la struttura. La tesi vuole porre l’attenzione su come l’utilizzo corretto di uno o più software, restituisca una informazione utile alla progettazione del nuovo e alla gestione dell’esistente. La ricerca infatti vuole inserirsi in uno studio più ampio delle influenze del metodo BIM nella valutazione delle vulnerabilità sismiche di strutture esistenti o in fase di realizzazione.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
BIM-BASED STRUCTURAL ANALYSIS THE CASE OF CINETEATRO GAVAZZENI.pdf

non accessibile

Descrizione: Testo tesi
Dimensione 3.73 MB
Formato Adobe PDF
3.73 MB Adobe PDF   Visualizza/Apri
ALLEGATI COMPLETI.pdf

non accessibile

Descrizione: Allegati tesi
Dimensione 6.21 MB
Formato Adobe PDF
6.21 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/132384