Advanced Technology Valve, a manufacturing company operating in the energy sector, is designing a new plant for the production of ball valves for the oil and gas market. The initially calculated number of workstations to be installed within the plant was verified through the use of discrete event simulation to find if the design methodology was sound and enabled the plant to reach its demand target. Additional considerations were made concerning the reliability of the system and the impact of capacity increases and reduction was evaluated in different scenarios. The system was found to be compliant with the demand target and the design method to be sound.
Avanced Technology Valve, una società manifatturiera operante nel settore dell'energia, ha progettato un nuovo impianto per la produzione di valvole a sfera destinate al mercato degli idrocarburi. Il numero di stazioni di lavoro da installare nell'impiant calcolato inizialmente è stato corroborato tramite l'uso di un modello di simulazione ad eventi discreti,al fine di verificare che il metodo di progettazione fosse buono e che potesse raggiungere gli obiettivi di domanda. Sono state fatte ulteriori considerazioni riguardo l'affidabilità del sistema e gli effetti di un aumento o riduzione della capacità produttiva sono stati valutati in scenari diversi. Il sistema è risultato essere conforme agli obbiettivi in termini di domanda e il metodo di progettazione corretto.
Evaluation of the performance of a new ball valve production plant by use of a DES model
GIRIBALDI, MARTINO
2016/2017
Abstract
Advanced Technology Valve, a manufacturing company operating in the energy sector, is designing a new plant for the production of ball valves for the oil and gas market. The initially calculated number of workstations to be installed within the plant was verified through the use of discrete event simulation to find if the design methodology was sound and enabled the plant to reach its demand target. Additional considerations were made concerning the reliability of the system and the impact of capacity increases and reduction was evaluated in different scenarios. The system was found to be compliant with the demand target and the design method to be sound.File | Dimensione | Formato | |
---|---|---|---|
Tesi.pdf
non accessibile
Descrizione: Thesis PDF
Dimensione
2.95 MB
Formato
Adobe PDF
|
2.95 MB | Adobe PDF | Visualizza/Apri |
Tesi.docx
non accessibile
Descrizione: Thesis text
Dimensione
3.62 MB
Formato
Microsoft Word XML
|
3.62 MB | Microsoft Word XML | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/135171