The aim of this thesis is to verify and evaluate the effectiveness of a first acoustic study in the preliminary phase, where there are two main goals: I. Improve the performance benefits that will bring to an automatic increase in comfort; II. Cost management. Thanks to the use of parametric programs it is possible to have a range of free variables, that permits to conduct deep analyses to find the optimal solution at the lowest cost. These useful variables are about the acoustic characteristics of the internal surfaces and the geometry of the room. It will be useful to use iterative analysis to highlight the differences between the evaluation of the acoustic problems at the end of the executive process and the treatment of these problems during the preliminary phase of the project. Thanks to this we can have an increasing percentage in comfort that could be easily achieved by considering the acoustic problems from the beginning. The result of this study will be applied to a multipurpose room of the Verderio oratory that will be built during next spring by the Galimberti S.p.A.company that gave me a huge contribution to this thesis. The final solution, that will be exhaustively explained during the reading of this work, reaches the settled goals (increase in comfort and cost management), has been developed considering the architectural restrictions of the case study.
Il seguente lavoro di tesi si pone l’obiettivo di verificare e valutare l’efficacia di uno studio preventivo in fase di progettazione preliminare degli aspetti acustici, traendone così vantaggio sia dal punto di vista economico, con un contenimento dei costi, che dal punto di vista prestazionale con un aumento del comfort. Questa valutazione viene eseguita mediante programmi parametrici che consentono di avere differenti variabili libere, permettendo così lo svolgimento di analisi per la ricerca della soluzione ottimale. Tali variabili che verranno analizzate riguardano le proprietà acustiche delle superfici di rivestimento interno e la geometria della sala. Grazie ad analisi iterative verranno messe in evidenza le differenze tra una valutazione delle problematiche acustiche in fase di progetto esecutivo ed una trattazione di tali problematiche sin dal progetto preliminare, determinando così l’aumento percentuale del comfort che si potrebbe ottenere dando maggiore priorità alle problematiche acustiche sin dalle prime fasi progettuali. Lo studio verrà applicato ad una sala polifunzionale dell’oratorio di Verderio che verrà costruita in primavera 2018 dalla ditta costruttrice Galimberti S.p.A. con la quale si ha collaborato per lo svolgimento di tali valutazioni. Tenendo in considerazione i vincoli architettonici imposti nel caso studio, viene ricercata la soluzione che consente di rispettare i parametri acustici ottimali interni alla sala al minor costo sostenibile dall’azienda.
Algoritmi di ottimizzazione acustica per la progettazione edilizia integrata
RIZZA, DANIELE
2016/2017
Abstract
The aim of this thesis is to verify and evaluate the effectiveness of a first acoustic study in the preliminary phase, where there are two main goals: I. Improve the performance benefits that will bring to an automatic increase in comfort; II. Cost management. Thanks to the use of parametric programs it is possible to have a range of free variables, that permits to conduct deep analyses to find the optimal solution at the lowest cost. These useful variables are about the acoustic characteristics of the internal surfaces and the geometry of the room. It will be useful to use iterative analysis to highlight the differences between the evaluation of the acoustic problems at the end of the executive process and the treatment of these problems during the preliminary phase of the project. Thanks to this we can have an increasing percentage in comfort that could be easily achieved by considering the acoustic problems from the beginning. The result of this study will be applied to a multipurpose room of the Verderio oratory that will be built during next spring by the Galimberti S.p.A.company that gave me a huge contribution to this thesis. The final solution, that will be exhaustively explained during the reading of this work, reaches the settled goals (increase in comfort and cost management), has been developed considering the architectural restrictions of the case study.File | Dimensione | Formato | |
---|---|---|---|
2017_10_Rizza.pdf
non accessibile
Descrizione: Testo della tesi
Dimensione
7.51 MB
Formato
Adobe PDF
|
7.51 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/136682