The work thereafter presented is a summary of the work that I conducted at Safran repair shop to validate and to ameliorate the new pre-groove measurement procedure during my internship in the Engineering Support Service of Safran Repair Shop. The development and the validation of this procedure was a success, and it is was implemented in the plant in the beginning of January. This procedure permitted to save 5 days of turn-around-time for the treatment of the GE90-115 High Pressure compressor.

The work thereafter presented is a summary of the work that I conducted at Safran repair shop to validate and to ameliorate the new pre-groove measurement procedure during my internship in the Engineering Support Service of Safran Repair Shop. The development and the validation of this procedure was a success, and it is was implemented in the plant in the beginning of January. This procedure permitted to save 5 days of turn-around-time for the treatment of the GE90-115 High Pressure compressor.

Validation of a new measurement procedure for the pre-groove process. Internship at Safran Aircraft Engines

REMY, PAUL ETIENNE JOSEPH MARIE
2016/2017

Abstract

The work thereafter presented is a summary of the work that I conducted at Safran repair shop to validate and to ameliorate the new pre-groove measurement procedure during my internship in the Engineering Support Service of Safran Repair Shop. The development and the validation of this procedure was a success, and it is was implemented in the plant in the beginning of January. This procedure permitted to save 5 days of turn-around-time for the treatment of the GE90-115 High Pressure compressor.
ING - Scuola di Ingegneria Industriale e dell'Informazione
19-apr-2018
2016/2017
The work thereafter presented is a summary of the work that I conducted at Safran repair shop to validate and to ameliorate the new pre-groove measurement procedure during my internship in the Engineering Support Service of Safran Repair Shop. The development and the validation of this procedure was a success, and it is was implemented in the plant in the beginning of January. This procedure permitted to save 5 days of turn-around-time for the treatment of the GE90-115 High Pressure compressor.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
VALIDATION OF A NEW MEASUREMENT PROCEDURE FOR THE PRE-GROOVE PROCESS.pdf

non accessibile

Descrizione: Thesis text
Dimensione 2.96 MB
Formato Adobe PDF
2.96 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/139534