Born from the desire to know and go deep into an argument in today's world so unfamiliar, this thesis aims to be a thorough research on the themes of integrated BIM design and on the analysis of a method in order to apply its advantages from the early design stages. The world of Building Information Modeling is expanding more and more thanks to research and technological development, but it is equally evident how this methodology is mainly applied to the definitive stage and therefore used only for the final phases of the design. The aim of this project is to analyze and apply a method that allows the use and exploitation of the BIM methodology also in the preliminary design and feasibility study phase, thus allowing the designer and the stakeholders to study and deepen, at a conceptual level. , different alternatives to then choose the most advantageous in architectural and economic terms and to have a passage between the different phases of the design that takes place without interruption. The adoption of the BIM work process by all the actors, involved in the process, is certainly a complex and complex step that involves both a change in technical and technological skills and a change in the way of managing design from concept to maintenance, arriving at the disposal. What changes is the way to design that must be adapted to the new needs required when the working method is BIM-oriented. It is important to remember that when we talk about BIM we are not just talking about buildings but about all parts of the building organism and all the documents that are developed parallel to the project, it means talking about costs, estimates and calculations, energy analysis and of the possible interferences that run between the different disciplines, means to talk about everything that follows the project from concept to maintenance. The first part, presented as a theoretical study, aims to show the current state of the art of BIM, with the aim of clarifying its 19 meaning and highlighting its aspects. The second part deals with the analysis of the methodology with which the BIM should address the preliminary phases of the design, starting from conceptual modeling by masses, through the writing of the wbs to end with the detailed modeling and the realization of a BIM model that does not only is a three-dimensional representation of the building but it’s a real project database, a container of data. Since this thesis is not just a theoretical discussion of the Building Information Modeling, in the third and last part a concrete application of this new design methodology is presented through the case study of the much criticized new Campus of the Politecnico di Milano. IF THE PROJECT BY RENZO PIANO HAD USED THE BIM FROM THE CONCEPT PHASE, WOULD IT BE THE OBJECT OF SO MUCH CRITICISM TODAY?

Nata dal desiderio di conoscere e approfondire un argomento al giorno d’oggi cosi critico, questa tesi vuole essere una ricerca approfondita sulle tematiche della progettazione integrata BIM e sull’analisi di un metodo per poter applicarne i vantaggi fin dalle prime fasi della progettazione. Il mondo del Building Information Modeling si sta espandendo sempre di più grazie alla ricerca e allo sviluppo tecnologico ma è altrettanto evidente come questa metodologia sia applicata principalmente a partire dalla fase definitiva e quindi solamente per le fasi finali della progettazione. Obiettivo di questo elaborato vuole essere quello di analizzare e applicare un metodo che permetta di utilizzare e sfruttare la metodologia BIM a partire dalla fase di ideazione e di studio di fattibilità tecnica ed economica, consentendo al progettista ed agli stakeholder di studiare e approfondire già a livello concettuale diverse alternative, per poi scegliere la più vantaggiosa in termini architettonici ed economici allo scopo di avere un flusso senza soluzione di continuità tra tutte le diverse fasi del progetto. L’adozione del processo di lavoro BIM da parte di tutti gli attori partecipanti al progetto è sicuramente un passo complesso e articolato che riguarda sia un cambiamento di competenze tecniche e tecnologiche che una modifica nel modo di gestire la progettazione dalla fase di ideazione alla fase di manutenzione per finire con la fase di dismissione e smaltimento. Ciò che cambia è il modo di progettare, che si deve adattare alle nuove esigenze richieste quando la modalità di lavoro è BIM-oriented. La prima parte di questa tesi, presentata come approfondimento teorico, mira ad esibire l’attuale stato dell’arte della progetta- zione BIM nel mondo, con particolare attenzione alla situazione italiana, con l’obiettivo di porre chiarezza sul suo significato ed a evidenziarne tutti gli aspetti. 17 La seconda parte, presentata come un’analisi della metodologia con cui il BIM dovrebbe affrontare le fasi preliminari della progettazione, mostra come da una modellazione concettuale per masse, attraverso la redazione di una WBS si arriva alla realizzazione di un modello BIM che non è solo una rappresentazione tridimensionale dell’edificio ma un vero e proprio data- base di progetto, un contenitore di dati. Nella terza ed ultima parte viene presentata un’applicazione concreta di questa nuova metodologia di progettazione attraver- so il caso studio del discusso nuovo Campus Bonardi del Politecnico di Milano. SE IL PROGETTO DI RENZO PIANO AVESSE UTILIZZATO IL BIM FIN DALLA FASE DI IDEAZIONE, SAREBBE OGGI OGGETTO DI TANTE CRITICHE?

Attività di ispezione del progetto BIM-based : strumenti di verifica critica del progetto di Renzo Piano per il nuovo campus Bonardi del Politecnico di Milano

VILLA, FEDERICA
2017/2018

Abstract

Born from the desire to know and go deep into an argument in today's world so unfamiliar, this thesis aims to be a thorough research on the themes of integrated BIM design and on the analysis of a method in order to apply its advantages from the early design stages. The world of Building Information Modeling is expanding more and more thanks to research and technological development, but it is equally evident how this methodology is mainly applied to the definitive stage and therefore used only for the final phases of the design. The aim of this project is to analyze and apply a method that allows the use and exploitation of the BIM methodology also in the preliminary design and feasibility study phase, thus allowing the designer and the stakeholders to study and deepen, at a conceptual level. , different alternatives to then choose the most advantageous in architectural and economic terms and to have a passage between the different phases of the design that takes place without interruption. The adoption of the BIM work process by all the actors, involved in the process, is certainly a complex and complex step that involves both a change in technical and technological skills and a change in the way of managing design from concept to maintenance, arriving at the disposal. What changes is the way to design that must be adapted to the new needs required when the working method is BIM-oriented. It is important to remember that when we talk about BIM we are not just talking about buildings but about all parts of the building organism and all the documents that are developed parallel to the project, it means talking about costs, estimates and calculations, energy analysis and of the possible interferences that run between the different disciplines, means to talk about everything that follows the project from concept to maintenance. The first part, presented as a theoretical study, aims to show the current state of the art of BIM, with the aim of clarifying its 19 meaning and highlighting its aspects. The second part deals with the analysis of the methodology with which the BIM should address the preliminary phases of the design, starting from conceptual modeling by masses, through the writing of the wbs to end with the detailed modeling and the realization of a BIM model that does not only is a three-dimensional representation of the building but it’s a real project database, a container of data. Since this thesis is not just a theoretical discussion of the Building Information Modeling, in the third and last part a concrete application of this new design methodology is presented through the case study of the much criticized new Campus of the Politecnico di Milano. IF THE PROJECT BY RENZO PIANO HAD USED THE BIM FROM THE CONCEPT PHASE, WOULD IT BE THE OBJECT OF SO MUCH CRITICISM TODAY?
UTICA, GIANNI
PINTI, LIDIA
GUZZONI, LUIGI
ARC I - Scuola di Architettura Urbanistica Ingegneria delle Costruzioni
27-lug-2018
2017/2018
Nata dal desiderio di conoscere e approfondire un argomento al giorno d’oggi cosi critico, questa tesi vuole essere una ricerca approfondita sulle tematiche della progettazione integrata BIM e sull’analisi di un metodo per poter applicarne i vantaggi fin dalle prime fasi della progettazione. Il mondo del Building Information Modeling si sta espandendo sempre di più grazie alla ricerca e allo sviluppo tecnologico ma è altrettanto evidente come questa metodologia sia applicata principalmente a partire dalla fase definitiva e quindi solamente per le fasi finali della progettazione. Obiettivo di questo elaborato vuole essere quello di analizzare e applicare un metodo che permetta di utilizzare e sfruttare la metodologia BIM a partire dalla fase di ideazione e di studio di fattibilità tecnica ed economica, consentendo al progettista ed agli stakeholder di studiare e approfondire già a livello concettuale diverse alternative, per poi scegliere la più vantaggiosa in termini architettonici ed economici allo scopo di avere un flusso senza soluzione di continuità tra tutte le diverse fasi del progetto. L’adozione del processo di lavoro BIM da parte di tutti gli attori partecipanti al progetto è sicuramente un passo complesso e articolato che riguarda sia un cambiamento di competenze tecniche e tecnologiche che una modifica nel modo di gestire la progettazione dalla fase di ideazione alla fase di manutenzione per finire con la fase di dismissione e smaltimento. Ciò che cambia è il modo di progettare, che si deve adattare alle nuove esigenze richieste quando la modalità di lavoro è BIM-oriented. La prima parte di questa tesi, presentata come approfondimento teorico, mira ad esibire l’attuale stato dell’arte della progetta- zione BIM nel mondo, con particolare attenzione alla situazione italiana, con l’obiettivo di porre chiarezza sul suo significato ed a evidenziarne tutti gli aspetti. 17 La seconda parte, presentata come un’analisi della metodologia con cui il BIM dovrebbe affrontare le fasi preliminari della progettazione, mostra come da una modellazione concettuale per masse, attraverso la redazione di una WBS si arriva alla realizzazione di un modello BIM che non è solo una rappresentazione tridimensionale dell’edificio ma un vero e proprio data- base di progetto, un contenitore di dati. Nella terza ed ultima parte viene presentata un’applicazione concreta di questa nuova metodologia di progettazione attraver- so il caso studio del discusso nuovo Campus Bonardi del Politecnico di Milano. SE IL PROGETTO DI RENZO PIANO AVESSE UTILIZZATO IL BIM FIN DALLA FASE DI IDEAZIONE, SAREBBE OGGI OGGETTO DI TANTE CRITICHE?
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2018_Luglio_Villa_01.pdf

non accessibile

Descrizione: Testo della tesi
Dimensione 26.79 MB
Formato Adobe PDF
26.79 MB Adobe PDF   Visualizza/Apri
2018_Luglio_Villa_02.pdf

non accessibile

Descrizione: Evoluzione del panorama BIM nel mondo
Dimensione 36.63 MB
Formato Adobe PDF
36.63 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/142370