The study has the aim to plan a retraining of the workshop area of the Terminal Boschetto of Interport CIM in Novara, developing a multi-criteria analysis for the determination of the best investment. I chose this topic both for personal interest and because, in this moment of economic and financial crisis, it is essential to know how to combine maximum efficiency at reasonable costs. Support analysis like this are interesting both from the methodological point of view and because they highlight particular aspects that otherwise would not have been seen. It is composed of preliminary chapters, in which the context and the current operating situation are explained, then three retraining interventions of particular interest will be presented. The main chapter is about the multi-criteria analysis and the achievement of the final choice. In conclusion I develop the winning project. The thesis was realized thanks to the support of Eurogateway S.r.l., railway carrings and handling manager, where I did an extra-curricular internship.
L’elaborato ha l’intento di pianificare la riqualificazione dell’area officine del Terminal Boschetto dell’Interporto CIM di Novara, sfruttando un’analisi multi criterio per la determinazione del miglior investimento. Ho scelto questo argomento sia per interesse personale sia perché, in un momento di crisi economica e finanziaria come quello che stiamo vivendo, è fondamentale saper coniugare la massima efficienza ad un costo ragionevole. Le analisi di supporto alla scelta, come quella che sarà esposta, sono interessanti sia dal punto di vista metodologico, sia perché sono in grado di evidenziare aspetti particolari che altrimenti non sarebbero stati colti. Lo studio è così organizzato: a seguito dei capitoli introduttivi, nella quale si inquadra il contesto e la situazione di esercizio attuale, verranno presentati tre interventi di riqualificazione ritenuti di particolare interesse. Successivamente viene esposta l’analisi multi criterio e il raggiungimento della scelta finale, con le relative osservazioni. In conclusione è stata elaborata la planimetria del progetto vincente. La tesi è stata realizzata grazie al supporto di Eurogateway S.r.l., azienda responsabile delle manovre ferroviarie e di handling, presso la quale ho svolto un tirocinio extracurricolare.
Analisi multi-criterio per la riqualificazione dell'area officine nel Terminal Boschetto di Novara
BORRONI, VALENTINA
2017/2018
Abstract
The study has the aim to plan a retraining of the workshop area of the Terminal Boschetto of Interport CIM in Novara, developing a multi-criteria analysis for the determination of the best investment. I chose this topic both for personal interest and because, in this moment of economic and financial crisis, it is essential to know how to combine maximum efficiency at reasonable costs. Support analysis like this are interesting both from the methodological point of view and because they highlight particular aspects that otherwise would not have been seen. It is composed of preliminary chapters, in which the context and the current operating situation are explained, then three retraining interventions of particular interest will be presented. The main chapter is about the multi-criteria analysis and the achievement of the final choice. In conclusion I develop the winning project. The thesis was realized thanks to the support of Eurogateway S.r.l., railway carrings and handling manager, where I did an extra-curricular internship.File | Dimensione | Formato | |
---|---|---|---|
2018_12_Borroni.pdf
accessibile in internet per tutti
Descrizione: Testo della tesi
Dimensione
11.72 MB
Formato
Adobe PDF
|
11.72 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/144362