Various critical issues characterize the world of construction, mainly due to the more recent effectiveness of the interactions between the actors of the building process. If at the theoretical level BIM methodologies aimed at full cooperation, in practice there is still a certain inhomogeneity of the approach. To have a clearer overview of the critical issues, a questionnaire focused on the exchange between subjects was carried out. It is the SLIM BIM project developed by the Politecnico di Milano. The process weaknesses, highlighted by the collected data, are signs of a broken collaboration between the parties, caused by the use of different systems, and by an exchange of information centered on files and documents intended as data carrier. This results in a waste of time and information during the data input in the various systems. Thus, the digital continuity theorized by BIM methodology is not ensured. It can be stated that, if on one side it is still possible to meet subjects that use a traditional methodology, on the other side there are subjects committed to re-establish collaboration using the BIM methodologies of Level 3, in order to solve criticalities that are found in the current building process. Therefore, to optimize the flow of information, in order to improve in the communication between the subjects, it is necessary to switch from an interrupted collaboration, to an integrated collaboration. In an integrated collaboration, all the information is contained in a single environment in which, all the subjects and system work, in order to be able to guarantee the desired digital continuity. The use of a collaboration platform would allow to progress from a linear and unidirectional process to a circular, contemporary and collaborating process, in which each actor is involved. The first step to achieve this target is to introduce an evolution in the flow of information, focusing it on the data, intended as pure information, instead of focusing it on files and documents. The aim of this research is to determine whether the 3DEXPERIENCE® platform of Dassault Systèmes, that is a real Common Data Environment, would solve the communication issues, by facilitating the dialogue among all the actors of the building process, even if they have a different digital maturity. Moreover, with an approach like that it is possible to trace all the information and its evolution, organize the work flow and store data and files, in one single environment, in order to obtain a reduction of human error, time and money, improving the quality of the final product. In conclusion, the aim of this thesis is to show how the use of a system based on database, ensures the optimization of the flow of information between clients, general contractors, architects, engineers, suppliers and facility managers, also in a contest marked by fragmentation and heterogeneity, like the AEC sector.

Il mondo delle costruzioni è caratterizzato da diverse criticità, dovute principalmente alla sempre più ridotta efficacia delle interazioni tra gli attori del processo edilizio. Questo perché, se a livello teorico si è riusciti a teorizzare una metodologia BIM volte alla piena collaborazione, nella pratica c’è ancora una certa disomogeneità di approccio. Per avere una rappresentazione più chiara di queste problematiche è stato realizzato un questionario incentrato sullo scambio informativo tra i soggetti, contestualmente al progetto SLIM BIM sviluppato dal Politecnico di Milano. Le debolezze di processo evidenziate dai dati raccolti sono sintomi di una collaborazione interrotta tra le parti, causata dall’utilizzo di sistemi differenti non integrati tra loro e di uno scambio informativo incentrato su file e documenti intesi come portatori di dati. Ciò comporta perdita di tempo e informazioni nel tradurre questi dati all’interno dei vari sistemi e non garantisce quella continuità teorizzata dal BIM. Quello che possiamo affermare però è che, se da un lato è possibile ancora incontrare soggetti fortemente legati a metodologie tradizionali, dall’altro vi sono soggetti impegnati a ristudiare la collaborazione sfruttando le metodologie del BIM di livello 3, in modo da risolvere quelle criticità che si riscontrano nel processo edilizio attuale. Per ottimizzare il flusso informativo, al fine di apportate un miglioramento nella comunicazione tra i soggetti, è quindi necessario passare da una collaborazione interrotta come quella appena descritta, ad una collaborazione integrata, nella quale tutte le informazioni sono contenute in un unico ambiente in cui lavorano i soggetti coinvolti e i sistemi utilizzati nel processo, in modo da poter garantire quella continuità desiderata. L’utilizzo di una piattaforma di collaborazione consentirebbe in questi termini di passare da un processo lineare e monodirezionale ad un processo circolare, contemporaneo e collaborante, nel quale coinvolgere ogni soggetto. Il primo passo per raggiungere un miglioramento in termini di comunicazione è portare un’evoluzione nello scambio informativo incentrandolo sul dato inteso come informazione pura e non più sul documento. L’obiettivo della tesi è verificare che uno strumento come la 3DEXPERIENCE® platform di Dassault Systèmes, che si pone come un vero e proprio Ambiente di Condivisione Dati, consentirebbe di risolvere i problemi di comunicazione tra le parti, permettendo quindi il dialogo tra tutti i soggetti coinvolti nel processo, anche se con maturità digitali differenti. Con un approccio di questo tipo è inoltre possibile tracciare tutte le informazioni e la loro evoluzione, organizzare il flusso di lavoro e archiviare dati e documenti, tutti presenti in un unico ambiente organizzato, in modo da ottenere la riduzione dell’errore umano, e risparmiare su tempi e costi, migliorando la qualità del prodotto finale. In conclusione quindi lo scopo del lavoro è dunque quello di dimostrare come l’utilizzo di un sistema basato su database permetta di ottenere un’ottimizzazione del flusso informativo tra committenza, imprese, progettisti, fornitori e installatori, anche in un contesto caratterizzato da una certa frammentazione, specie nell’adozione di nuove metodologie, come risulta essere quello edilizio.

Smart BIM. Piattaforme di dati per un'efficiente gestione informativa del processo edilizio

DEGIOVANNI, EUGENIA
2018/2019

Abstract

Various critical issues characterize the world of construction, mainly due to the more recent effectiveness of the interactions between the actors of the building process. If at the theoretical level BIM methodologies aimed at full cooperation, in practice there is still a certain inhomogeneity of the approach. To have a clearer overview of the critical issues, a questionnaire focused on the exchange between subjects was carried out. It is the SLIM BIM project developed by the Politecnico di Milano. The process weaknesses, highlighted by the collected data, are signs of a broken collaboration between the parties, caused by the use of different systems, and by an exchange of information centered on files and documents intended as data carrier. This results in a waste of time and information during the data input in the various systems. Thus, the digital continuity theorized by BIM methodology is not ensured. It can be stated that, if on one side it is still possible to meet subjects that use a traditional methodology, on the other side there are subjects committed to re-establish collaboration using the BIM methodologies of Level 3, in order to solve criticalities that are found in the current building process. Therefore, to optimize the flow of information, in order to improve in the communication between the subjects, it is necessary to switch from an interrupted collaboration, to an integrated collaboration. In an integrated collaboration, all the information is contained in a single environment in which, all the subjects and system work, in order to be able to guarantee the desired digital continuity. The use of a collaboration platform would allow to progress from a linear and unidirectional process to a circular, contemporary and collaborating process, in which each actor is involved. The first step to achieve this target is to introduce an evolution in the flow of information, focusing it on the data, intended as pure information, instead of focusing it on files and documents. The aim of this research is to determine whether the 3DEXPERIENCE® platform of Dassault Systèmes, that is a real Common Data Environment, would solve the communication issues, by facilitating the dialogue among all the actors of the building process, even if they have a different digital maturity. Moreover, with an approach like that it is possible to trace all the information and its evolution, organize the work flow and store data and files, in one single environment, in order to obtain a reduction of human error, time and money, improving the quality of the final product. In conclusion, the aim of this thesis is to show how the use of a system based on database, ensures the optimization of the flow of information between clients, general contractors, architects, engineers, suppliers and facility managers, also in a contest marked by fragmentation and heterogeneity, like the AEC sector.
LETO, ALESSIO DOMENICO
ARC I - Scuola di Architettura Urbanistica Ingegneria delle Costruzioni
25-lug-2019
2018/2019
Il mondo delle costruzioni è caratterizzato da diverse criticità, dovute principalmente alla sempre più ridotta efficacia delle interazioni tra gli attori del processo edilizio. Questo perché, se a livello teorico si è riusciti a teorizzare una metodologia BIM volte alla piena collaborazione, nella pratica c’è ancora una certa disomogeneità di approccio. Per avere una rappresentazione più chiara di queste problematiche è stato realizzato un questionario incentrato sullo scambio informativo tra i soggetti, contestualmente al progetto SLIM BIM sviluppato dal Politecnico di Milano. Le debolezze di processo evidenziate dai dati raccolti sono sintomi di una collaborazione interrotta tra le parti, causata dall’utilizzo di sistemi differenti non integrati tra loro e di uno scambio informativo incentrato su file e documenti intesi come portatori di dati. Ciò comporta perdita di tempo e informazioni nel tradurre questi dati all’interno dei vari sistemi e non garantisce quella continuità teorizzata dal BIM. Quello che possiamo affermare però è che, se da un lato è possibile ancora incontrare soggetti fortemente legati a metodologie tradizionali, dall’altro vi sono soggetti impegnati a ristudiare la collaborazione sfruttando le metodologie del BIM di livello 3, in modo da risolvere quelle criticità che si riscontrano nel processo edilizio attuale. Per ottimizzare il flusso informativo, al fine di apportate un miglioramento nella comunicazione tra i soggetti, è quindi necessario passare da una collaborazione interrotta come quella appena descritta, ad una collaborazione integrata, nella quale tutte le informazioni sono contenute in un unico ambiente in cui lavorano i soggetti coinvolti e i sistemi utilizzati nel processo, in modo da poter garantire quella continuità desiderata. L’utilizzo di una piattaforma di collaborazione consentirebbe in questi termini di passare da un processo lineare e monodirezionale ad un processo circolare, contemporaneo e collaborante, nel quale coinvolgere ogni soggetto. Il primo passo per raggiungere un miglioramento in termini di comunicazione è portare un’evoluzione nello scambio informativo incentrandolo sul dato inteso come informazione pura e non più sul documento. L’obiettivo della tesi è verificare che uno strumento come la 3DEXPERIENCE® platform di Dassault Systèmes, che si pone come un vero e proprio Ambiente di Condivisione Dati, consentirebbe di risolvere i problemi di comunicazione tra le parti, permettendo quindi il dialogo tra tutti i soggetti coinvolti nel processo, anche se con maturità digitali differenti. Con un approccio di questo tipo è inoltre possibile tracciare tutte le informazioni e la loro evoluzione, organizzare il flusso di lavoro e archiviare dati e documenti, tutti presenti in un unico ambiente organizzato, in modo da ottenere la riduzione dell’errore umano, e risparmiare su tempi e costi, migliorando la qualità del prodotto finale. In conclusione quindi lo scopo del lavoro è dunque quello di dimostrare come l’utilizzo di un sistema basato su database permetta di ottenere un’ottimizzazione del flusso informativo tra committenza, imprese, progettisti, fornitori e installatori, anche in un contesto caratterizzato da una certa frammentazione, specie nell’adozione di nuove metodologie, come risulta essere quello edilizio.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
050719_Tesi_Sperimentale_Degiovanni.pdf

non accessibile

Descrizione: Testo della tesi
Dimensione 10.24 MB
Formato Adobe PDF
10.24 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/149017