This thesis work aims to evaluate and show the use of Building Information Modeling (BIM) for the design of electrical and special systems. In particular, the motivations that drive the adoption, recognition of the main achievable benefits and those currently achievable and the limits that this new process currently presents will be discussed. In order to show a real example of the application of BIM to the design, the executive project of the electrical and special systems of a civil building with BIM model, realized at an engineering company, is summarized. Finally, the actual BIM integration achieved, and possible future scenarios will be analyzed.
Questo lavoro di tesi mira a valutare e mostrare l’utilizzo del Building Information Modeling (BIM) ai fini della progettazione di impianti elettrici e speciali. In particolare, si andranno a trattare le motivazioni che ne spingono l’adozione, il riconoscimento dei principali benefici conseguibili e quelli al momento realizzabili ed i limiti che presenta attualmente questo nuovo processo. Al proposito di mostrare un esempio reale dell’applicazione del BIM alla progettazione viene esposto in maniera sintetica il progetto esecutivo degli impianti elettrici ed affini di un edificio civile con modello BIM, realizzato presso una società di ingegneria. Infine, sarà considerata la reale integrazione BIM conseguita e possibili scenari futuri.
Progettazione di impianti elettrici ed affini integrata nel building information modeling
REA, FERDINANDO
2018/2019
Abstract
This thesis work aims to evaluate and show the use of Building Information Modeling (BIM) for the design of electrical and special systems. In particular, the motivations that drive the adoption, recognition of the main achievable benefits and those currently achievable and the limits that this new process currently presents will be discussed. In order to show a real example of the application of BIM to the design, the executive project of the electrical and special systems of a civil building with BIM model, realized at an engineering company, is summarized. Finally, the actual BIM integration achieved, and possible future scenarios will be analyzed.File | Dimensione | Formato | |
---|---|---|---|
tesi Ferdinando Rea.pdf
non accessibile
Descrizione: Testo della tesi
Dimensione
14.73 MB
Formato
Adobe PDF
|
14.73 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/149518