The purpose of this paper is to illustrate the path through which the project was born and evolved, analyzing all the useful and necessary components that have contributed to its development. Starting from the architectural one, which first provided for the study of the theme of the sports facility as a place for the community, from which were later defined spaces and methods of use. This also required knowledge of the characteristics of the context in which the project area - Milan and Sesto San Giovanni - is located, its history and the standards in force that define the minimum requirements to be met. Subsequently, the structural component was developed, for which attention was focused on the predimensioning of the main structures, accompanied by checks on the operating limit states and last limit states as required by law. In addition, a three-dimensional model was created in Midas, which was useful in verifying movements. As far as the technological component is concerned, in addition to identifying all the stratigraphies related to walls and floors and solving the most interesting knots of the structures, particular attention was paid to the subject of BIM - Building Information Modeling. Through the project it was possible to demonstrate how this process and the working methodology on which it is based, are useful to systematically model reality, thus facilitating the designer in the mediation between knowledge and needs, in direct relations with the company and in direct dialogue with producers. It also implies collaboration, interoperability and coordination between the different actors involved in the work and the various stages of the construction process. At the same time, the theme of materials, the use of which has an inexorable impact on the environment, has been explored in depth. For this reason, a conscious choice has been made between the various options of use. The CES Edu-Pack software was useful for this purpose, as it made it easier to compare several buffer packages in order to quantify the CO2 emitted and, in general, the environmental impact. These choices are aimed at designing buildings that, during their life cycle, compensate for the CO2 emitted during their construction, with almost zero emissions. The last component analysed is that of the plant system. The plant equipment used in the project was identified, accompanied by the main dimensioning calculations that provide for the definition of indications relating to the energy efficiency of buildings (transmittances of opaque walls and transparent components), in order to meet the minimum requirements necessary to ensure the control of environmental comfort and energy savings.
Scopo del presente elaborato è quello di illustrare il percorso attraverso il quale il progetto è nato e si è evoluto, analizzando tutte le componenti utili e necessarie che hanno concorso al suo sviluppo. A partire da quella architettonica, che ha previsto innanzi tutto lo studio del tema dell’impianto sportivo come luogo della collettività, da cui sono stati successivamente definiti spazi e modalità di utilizzo. Questo ha presupposto anche la conoscenza delle caratteristiche del contesto in cui si inserisce l’area di progetto - Milano e Sesto San Giovanni - la sua storia e le norme in vigore che ne definiscono i requisiti minimi da rispettare. Successivamente è stata sviluppata la componente strutturale, per la quale è stata concentrata l’attenzione al predimensionamento delle strutture principali, corredato delle verifiche agli stati limite di esercizio e stati limite ultimi come richiesto da normativa. Inoltre è stato creato un modello tridimensionale in Midas, che è stato utile nella verifica degli spostamenti. Per quanto riguarda la componente tecnologica, oltre ad aver individuato tutte le stratigrafie relative a muri e solai e ad aver risolto i nodi di maggior interesse delle strutture, è stato affrontato con particolare attenzione il tema del BIM - Building Information Modeling. Attraverso il progetto è stato possibile dimostrare come questo processo e la metodologia di lavoro su cui si basa, siano utili a modellare sistematicamente la realtà, facilitando così il progettista nella mediazione tra saperi e bisogni, nelle relazioni dirette con l’impresa e nel dialogo diretto con i produttori. Inoltre implica la collaborazione, l’interoperabilità ed il coordinamento tra i diversi attori coinvolti nell’opera e le varie fasi del processo di costruzione. Parallelamente è stato approfondito il tema dei materiali, il cui uso impatta inesorabilmente sull’ambiente. Per questo è stata operata una scelta consapevole tra le varie opzioni di utilizzo. In questo è stato utile il software CES Edu-Pack che ha facilitato il confronto fra più pacchetti di tamponature per quantificare la CO2 emessa e in generale l’impatto ambientale. Queste scelte sono volte a progettare edifici che durante il loro ciclo di vita vadano a compensare la CO2 emessa per la loro costruzione, con emissioni quasi pari a zero. Ultima componente analizzata è quella del sistema impiantistico. Sono state individuate le dotazioni impiantistiche utilizzate nel progetto, corredate dai principali calcoli di dimensionamento che prevedono la definizione di indicazioni relative all’efficienza energetica degli edifici (trasmittanze delle pareti opache e dei componenti trasparenti), al fine di soddisfare i requisiti minimi necessari a garantire il controllo del comfort ambientale e il risparmio energetico.
Un nuovo centro sportivo a Sesto San Giovanni
MARKOVIC, VANJA;MARINI, NICHOLAS;BONANNI, GIOIA
2018/2019
Abstract
The purpose of this paper is to illustrate the path through which the project was born and evolved, analyzing all the useful and necessary components that have contributed to its development. Starting from the architectural one, which first provided for the study of the theme of the sports facility as a place for the community, from which were later defined spaces and methods of use. This also required knowledge of the characteristics of the context in which the project area - Milan and Sesto San Giovanni - is located, its history and the standards in force that define the minimum requirements to be met. Subsequently, the structural component was developed, for which attention was focused on the predimensioning of the main structures, accompanied by checks on the operating limit states and last limit states as required by law. In addition, a three-dimensional model was created in Midas, which was useful in verifying movements. As far as the technological component is concerned, in addition to identifying all the stratigraphies related to walls and floors and solving the most interesting knots of the structures, particular attention was paid to the subject of BIM - Building Information Modeling. Through the project it was possible to demonstrate how this process and the working methodology on which it is based, are useful to systematically model reality, thus facilitating the designer in the mediation between knowledge and needs, in direct relations with the company and in direct dialogue with producers. It also implies collaboration, interoperability and coordination between the different actors involved in the work and the various stages of the construction process. At the same time, the theme of materials, the use of which has an inexorable impact on the environment, has been explored in depth. For this reason, a conscious choice has been made between the various options of use. The CES Edu-Pack software was useful for this purpose, as it made it easier to compare several buffer packages in order to quantify the CO2 emitted and, in general, the environmental impact. These choices are aimed at designing buildings that, during their life cycle, compensate for the CO2 emitted during their construction, with almost zero emissions. The last component analysed is that of the plant system. The plant equipment used in the project was identified, accompanied by the main dimensioning calculations that provide for the definition of indications relating to the energy efficiency of buildings (transmittances of opaque walls and transparent components), in order to meet the minimum requirements necessary to ensure the control of environmental comfort and energy savings.File | Dimensione | Formato | |
---|---|---|---|
2019_12_Bonanni_Marini_Markovic_01.pdf
accessibile in internet per tutti
Descrizione: Planivolumetrico 1:1000
Dimensione
138.44 MB
Formato
Adobe PDF
|
138.44 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_02.pdf
accessibile in internet per tutti
Descrizione: Ingressi principali
Dimensione
230.47 MB
Formato
Adobe PDF
|
230.47 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_03.pdf
accessibile in internet per tutti
Descrizione: Pianta e sezione dello stadio
Dimensione
365.03 MB
Formato
Adobe PDF
|
365.03 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_04.pdf
accessibile in internet per tutti
Descrizione: Piante Stadio
Dimensione
178.61 MB
Formato
Adobe PDF
|
178.61 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_05.pdf
accessibile in internet per tutti
Descrizione: Prospetti Stadio
Dimensione
39.09 MB
Formato
Adobe PDF
|
39.09 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_06.pdf
accessibile in internet per tutti
Descrizione: Painta e sezione piscina
Dimensione
266.14 MB
Formato
Adobe PDF
|
266.14 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_07.pdf
accessibile in internet per tutti
Descrizione: Piante
Dimensione
370.1 MB
Formato
Adobe PDF
|
370.1 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_08.pdf
accessibile in internet per tutti
Descrizione: Prospetti
Dimensione
36.5 MB
Formato
Adobe PDF
|
36.5 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_10.pdf
accessibile in internet per tutti
Descrizione: Esploso
Dimensione
43.48 MB
Formato
Adobe PDF
|
43.48 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_11.pdf
accessibile in internet per tutti
Descrizione: Sezione 1:50
Dimensione
99.32 MB
Formato
Adobe PDF
|
99.32 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_12.pdf
accessibile in internet per tutti
Descrizione: Sezione 1:50
Dimensione
57.72 MB
Formato
Adobe PDF
|
57.72 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_13.pdf
accessibile in internet per tutti
Descrizione: Dettagli
Dimensione
23.07 MB
Formato
Adobe PDF
|
23.07 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_14.pdf
accessibile in internet per tutti
Descrizione: Sezione 1:20
Dimensione
91.41 MB
Formato
Adobe PDF
|
91.41 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_17.pdf
accessibile in internet per tutti
Descrizione: impianti 1
Dimensione
37.84 MB
Formato
Adobe PDF
|
37.84 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_18.pdf
accessibile in internet per tutti
Descrizione: impianti 2
Dimensione
35.68 MB
Formato
Adobe PDF
|
35.68 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_19.pdf
accessibile in internet per tutti
Descrizione: impianti 3
Dimensione
41.88 MB
Formato
Adobe PDF
|
41.88 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_20.pdf
non accessibile
Descrizione: Strutture 1
Dimensione
3.97 MB
Formato
Adobe PDF
|
3.97 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_21.pdf
non accessibile
Descrizione: Strutture 2
Dimensione
5.02 MB
Formato
Adobe PDF
|
5.02 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_Re04.pdf
non accessibile
Descrizione: Relazione Progettazione Impiantistica
Dimensione
5.91 MB
Formato
Adobe PDF
|
5.91 MB | Adobe PDF | Visualizza/Apri |
2019_12_Bonanni_Marini_Markovic_Re02.pdf
non accessibile
Descrizione: Relazione Strutturale
Dimensione
3.62 MB
Formato
Adobe PDF
|
3.62 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/151617