This thesis work will explore various metrics for the assessment of operators (OP) trained in Operator Training Simulators (OTS), starting from the one reported in literature and, eventually, developing new specific assessment metrics for lignite power plants operators. Three months were spent at the training center of Rheinisch Westfälisches Elektrizitätswerk (RWE) observing their training programs for lignite power plant operators. There, it was possible to sort out, with the help of trainers and trainees, what assessment metrics could be exported into their simulator training programs. It has been possible to develop an objective evaluation metrics for the startup procedure of lignite power plants. Applying an Analytic Hierarchy Process (AHP) it has been possible to weight the various contributions to the objective evaluation. Moreover, it has been possible to integrate an existing list of behavioral markers reported in the literature with the consideration made by expert trainers and trainees, making such tool more suitable for lignite power plant trainings. The following thesis work will be part of WORK PACKAGE 2 of the European project ENHANCE, which aims to integrate the best practices and improve the state of the art of OTS in maritime and process industries. The final goal of the project is to reduce the safety, environmental and financial risks related to human errors, which represent the major cause of industrial and maritime accidents. The WORK PACKAGE 2 will try to find suitable evaluation metrics to be used in the OTS. Both technical aspects and human factors will be examined (ENHANCE Annex 1, Part B. and H2020-MSCA-RISE-2018.).

Il seguente lavoro di tesi esplorerà i vari metodi di valutazione utilizzati per l’addestramento di operatori nei simulatori di processo, partendo da quelli riportati nella letteratura, ed infine, sviluppandone di specifici per la valutazione degli operatori di centrali elettriche a lignite. Tre mesi sono stati spesi presso il centro di formazione di Rheinisch Westfälisches Elektrizitätswerk (RWE) osservando i loro programmi di addestramento per operatori di centrali elettriche a lignite. Qui, con l’aiuto di istruttori ed operatori esperti, è stato possibile valutare quali metodi di valutazione presenti nella letteratura fossero esportabili nei loro programmi di addestramento. È stato possibile sviluppare una valutazione oggettiva per la procedura di accensione di centrali elettriche a lignite. Applicando un’AHP è stato possibile pesare il contributo di ogni componente della valutazione oggettiva. Inoltre, è stato possibile integrare una lista di “behavioral markers” riportata nella letteratura con le considerazioni fatte da istruttori ed operatori esperti, rendendo tale strumento più adatto all’addestramento di operatori di impianti a lignite. Il presente lavoro di tesi sarà parte del WORK PACKAGE 2 all’interno del progetto Europeo ENHANCE. ENHANCE mira a integrare le migliori tecniche e perfezionare lo stato dell’arte dei simulatori di processo utilizzati nei due settori. Lo scopo finale è ridurre i rischi legati alla sicurezza, ambientali e finanziari causati dagli errori umani. Gli errori umani infatti rappresentano la causa preponderante degli incidenti verificatisi nell’industria di processo e nell’industria marittima. Il WORK PACKAGE 2 si occuperà di trovare i metodi di valutazione da applicare all’interno dei simulatori di processo, tenendo conto sia degli aspetti tecnici che dei fattori umani (H2020-MSCA-RISE-2018).

Identification of performance indicators for the assessment of trainees in operator training simulators

DONELLI, MARTINO
2019/2020

Abstract

This thesis work will explore various metrics for the assessment of operators (OP) trained in Operator Training Simulators (OTS), starting from the one reported in literature and, eventually, developing new specific assessment metrics for lignite power plants operators. Three months were spent at the training center of Rheinisch Westfälisches Elektrizitätswerk (RWE) observing their training programs for lignite power plant operators. There, it was possible to sort out, with the help of trainers and trainees, what assessment metrics could be exported into their simulator training programs. It has been possible to develop an objective evaluation metrics for the startup procedure of lignite power plants. Applying an Analytic Hierarchy Process (AHP) it has been possible to weight the various contributions to the objective evaluation. Moreover, it has been possible to integrate an existing list of behavioral markers reported in the literature with the consideration made by expert trainers and trainees, making such tool more suitable for lignite power plant trainings. The following thesis work will be part of WORK PACKAGE 2 of the European project ENHANCE, which aims to integrate the best practices and improve the state of the art of OTS in maritime and process industries. The final goal of the project is to reduce the safety, environmental and financial risks related to human errors, which represent the major cause of industrial and maritime accidents. The WORK PACKAGE 2 will try to find suitable evaluation metrics to be used in the OTS. Both technical aspects and human factors will be examined (ENHANCE Annex 1, Part B. and H2020-MSCA-RISE-2018.).
ING - Scuola di Ingegneria Industriale e dell'Informazione
29-apr-2020
2019/2020
Il seguente lavoro di tesi esplorerà i vari metodi di valutazione utilizzati per l’addestramento di operatori nei simulatori di processo, partendo da quelli riportati nella letteratura, ed infine, sviluppandone di specifici per la valutazione degli operatori di centrali elettriche a lignite. Tre mesi sono stati spesi presso il centro di formazione di Rheinisch Westfälisches Elektrizitätswerk (RWE) osservando i loro programmi di addestramento per operatori di centrali elettriche a lignite. Qui, con l’aiuto di istruttori ed operatori esperti, è stato possibile valutare quali metodi di valutazione presenti nella letteratura fossero esportabili nei loro programmi di addestramento. È stato possibile sviluppare una valutazione oggettiva per la procedura di accensione di centrali elettriche a lignite. Applicando un’AHP è stato possibile pesare il contributo di ogni componente della valutazione oggettiva. Inoltre, è stato possibile integrare una lista di “behavioral markers” riportata nella letteratura con le considerazioni fatte da istruttori ed operatori esperti, rendendo tale strumento più adatto all’addestramento di operatori di impianti a lignite. Il presente lavoro di tesi sarà parte del WORK PACKAGE 2 all’interno del progetto Europeo ENHANCE. ENHANCE mira a integrare le migliori tecniche e perfezionare lo stato dell’arte dei simulatori di processo utilizzati nei due settori. Lo scopo finale è ridurre i rischi legati alla sicurezza, ambientali e finanziari causati dagli errori umani. Gli errori umani infatti rappresentano la causa preponderante degli incidenti verificatisi nell’industria di processo e nell’industria marittima. Il WORK PACKAGE 2 si occuperà di trovare i metodi di valutazione da applicare all’interno dei simulatori di processo, tenendo conto sia degli aspetti tecnici che dei fattori umani (H2020-MSCA-RISE-2018).
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
20200405 Martino Donelli.pdf

non accessibile

Descrizione: Testo della tesi
Dimensione 6.03 MB
Formato Adobe PDF
6.03 MB Adobe PDF   Visualizza/Apri
20200405 Martino Donelli biblio off.docx

non accessibile

Descrizione: Testo della tesi word
Dimensione 25.2 MB
Formato Microsoft Word XML
25.2 MB Microsoft Word XML   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/153270