This paper is developed in 4 chapters. The First Chapter is dedicated to a general introduction on the topics. In the second chapter we talk about the birth of Risk Management, the Standards, and we identify the one to which we refer. A paragraph is dedicated to how Risk Management is applied to the world of construction, the area of ​​interest of the thesis. The ISO 31000 Standard and the fundamentals of Risk Management are then analyzed, indicating the guidelines for Risk Management and assessment techniques to identify and manage contingencies. Cataloging and hierarchization of risk is introduced in order to define actions to make risk tolerable. The main techniques of EN ISO 31010 relating to the identification of risk are illustrated. We deal in depth with the check list as a tool used in Project Management, for its versatility, speed and ease of use. Then we analyze this technique as a risk identification tool. The Third Chapter focuses on the concept of the project linked to the world of construction, on the specific characteristics of the projects and the articulation in temporal phases. Returning to the risk cataloging, analyzed in the second chapter, the risks that are present in the construction sector are further investigated. A new cataloging is therefore produced, according to the newly identified agents. Finally, first level risks are identified for the entire construction process. Specific check lists are produced which are consistent with the new cataloging of agents and risks. This new scheme applies to one of the phases of the construction process, the Executive one. The chapter ends with a survey which aims to receive feedback from field’s professionals. The Fourth chapter contains the final considerations relating to the application of Risk Management in the construction sector, relating to the identification and cataloging of risks in the process and finally with regard to the applicability of the check list technique in the construction process phases. The aim of the thesis is to identify the first level risks / unforeseen events that may adversely affect the building process through a check list model that allows it to be cataloged for the next steps.

L'elaborato si sviluppa in 4 Capitoli. Il Primo Capitolo è dedicato ad un'introduzione generale sugli argomenti. Nel Secondo Capitolo, teorico, si parla della nascita del Risk Management, degli Standard, e si individua quello al quale si fa riferimento. Si dedica un paragrafo al Risk Management applicato al mondo delle Costruzioni, ambito di interesse della tesi. Si tratta poi dello Standard ISO 31000, vengono quindi analizzati i fondamenti del Risk Management, indicando le linee guida per la gestione del rischio e le tecniche di valutazione per l'individuazione e la gestione degli imprevisti. Viene introdotta la catalogazione e gerarchizzazione del rischio per poter definire le azioni di risposta al fine di rendere tollerabile il rischio. Sono illustrate le principali tecniche della EN ISO 31010 relative all’individuazione del rischio. Si tratta in modo approfondito le Check List come strumento usato nel Project Management per la sua versatilità, rapidità e semplicità di utilizzo. Quindi si analizza questa tecnica come strumento di individuazione del rischio. Il Terzo Capitolo si focalizza sul concetto di progetto legato al mondo dell’edilizia, si tratta quindi delle caratteristiche specifiche dei progetti e dell'articolazione in fasi temporali. Riprendendo la catalogazione del rischio analizzata nel capitolo Secondo si approfondiscono maggiormente i rischi presenti nel settore delle costruzioni. Si produce quindi una nuova catalogazione a seconda degli agenti individuati. Infine, per l'intero processo edilizio vengono individuati i rischi di primo livello. Sono quindi prodotte delle Check List specifiche coerenti con la nuova catalogazione di agenti e rischi. Questo nuovo schema si applica ad una delle fasi del processo edilizio, quella Esecutiva. Il capitolo si conclude con un questionario che ha come fine quello di ricevere un feedback da parte di professionisti di settore. Il Quarto capitolo contiene le considerazioni finali relative all'applicazione del Risk Management nel settore delle costruzioni, relativamente all’individuazione e catalogazione dei rischi nel processo ed infine rispetto all'applicabilità della tecnica delle Check List nelle fasi del processo edilizio. Lo scopo di tesi è quello di individuare i rischi/imprevisti di primo livello che possano incidere negativamente sul processo edilizio tramite un modello di check list che ne permetta la catalogazione per gli step successivi.

Il risk management in edilizia. L'uso delle check list, proposta di un modello standard

Viani, Chiara
2019/2020

Abstract

This paper is developed in 4 chapters. The First Chapter is dedicated to a general introduction on the topics. In the second chapter we talk about the birth of Risk Management, the Standards, and we identify the one to which we refer. A paragraph is dedicated to how Risk Management is applied to the world of construction, the area of ​​interest of the thesis. The ISO 31000 Standard and the fundamentals of Risk Management are then analyzed, indicating the guidelines for Risk Management and assessment techniques to identify and manage contingencies. Cataloging and hierarchization of risk is introduced in order to define actions to make risk tolerable. The main techniques of EN ISO 31010 relating to the identification of risk are illustrated. We deal in depth with the check list as a tool used in Project Management, for its versatility, speed and ease of use. Then we analyze this technique as a risk identification tool. The Third Chapter focuses on the concept of the project linked to the world of construction, on the specific characteristics of the projects and the articulation in temporal phases. Returning to the risk cataloging, analyzed in the second chapter, the risks that are present in the construction sector are further investigated. A new cataloging is therefore produced, according to the newly identified agents. Finally, first level risks are identified for the entire construction process. Specific check lists are produced which are consistent with the new cataloging of agents and risks. This new scheme applies to one of the phases of the construction process, the Executive one. The chapter ends with a survey which aims to receive feedback from field’s professionals. The Fourth chapter contains the final considerations relating to the application of Risk Management in the construction sector, relating to the identification and cataloging of risks in the process and finally with regard to the applicability of the check list technique in the construction process phases. The aim of the thesis is to identify the first level risks / unforeseen events that may adversely affect the building process through a check list model that allows it to be cataloged for the next steps.
ARC I - Scuola di Architettura Urbanistica Ingegneria delle Costruzioni
24-lug-2020
2019/2020
L'elaborato si sviluppa in 4 Capitoli. Il Primo Capitolo è dedicato ad un'introduzione generale sugli argomenti. Nel Secondo Capitolo, teorico, si parla della nascita del Risk Management, degli Standard, e si individua quello al quale si fa riferimento. Si dedica un paragrafo al Risk Management applicato al mondo delle Costruzioni, ambito di interesse della tesi. Si tratta poi dello Standard ISO 31000, vengono quindi analizzati i fondamenti del Risk Management, indicando le linee guida per la gestione del rischio e le tecniche di valutazione per l'individuazione e la gestione degli imprevisti. Viene introdotta la catalogazione e gerarchizzazione del rischio per poter definire le azioni di risposta al fine di rendere tollerabile il rischio. Sono illustrate le principali tecniche della EN ISO 31010 relative all’individuazione del rischio. Si tratta in modo approfondito le Check List come strumento usato nel Project Management per la sua versatilità, rapidità e semplicità di utilizzo. Quindi si analizza questa tecnica come strumento di individuazione del rischio. Il Terzo Capitolo si focalizza sul concetto di progetto legato al mondo dell’edilizia, si tratta quindi delle caratteristiche specifiche dei progetti e dell'articolazione in fasi temporali. Riprendendo la catalogazione del rischio analizzata nel capitolo Secondo si approfondiscono maggiormente i rischi presenti nel settore delle costruzioni. Si produce quindi una nuova catalogazione a seconda degli agenti individuati. Infine, per l'intero processo edilizio vengono individuati i rischi di primo livello. Sono quindi prodotte delle Check List specifiche coerenti con la nuova catalogazione di agenti e rischi. Questo nuovo schema si applica ad una delle fasi del processo edilizio, quella Esecutiva. Il capitolo si conclude con un questionario che ha come fine quello di ricevere un feedback da parte di professionisti di settore. Il Quarto capitolo contiene le considerazioni finali relative all'applicazione del Risk Management nel settore delle costruzioni, relativamente all’individuazione e catalogazione dei rischi nel processo ed infine rispetto all'applicabilità della tecnica delle Check List nelle fasi del processo edilizio. Lo scopo di tesi è quello di individuare i rischi/imprevisti di primo livello che possano incidere negativamente sul processo edilizio tramite un modello di check list che ne permetta la catalogazione per gli step successivi.
File allegati
File Dimensione Formato  
Tesi_Chiara Viani.pdf

solo utenti autorizzati dal 06/07/2023

Descrizione: Elaborato di tesi
Dimensione 5.24 MB
Formato Adobe PDF
5.24 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/164827