The BIM (Building Information Modeling) modeling has the task of ensuring the management of information through the organization of the data produced during the entire life cycle of the work. The building process involves numerous professional figures who relate to each other and, in order to reduce the possibility of errors, it is necessary that the model is able to exchange information correctly, without wasting time and reinserting data. The objective of the following thesis work is to deepen the issues related to the correct storage of data and information associated with the elements of the model, showing in particular, the advantages that the IFC offers in this field. The analysis of the IFC finds its application in two case studies showing how a correct setting of the information flow from the preliminary phase to the design can be useful for what is considered the longest phase of the whole process: the management phase. The definition of the flow starts therefore from the identification of the informative specifications to insert inside the informative specifications until the final phase of integration of the model in the IWMS platform.

La modellazione BIM (Building Information Modeling) ha il compito di garantire la gestione delle informazioni attraverso l’organizzazione dei dati prodotti durante l’intero ciclo di vita dell’opera. Il processo costruttivo vede coinvolte numerose figure professionali che si relazionano tra di loro e, al fine di diminuire la possibilità di errori, è necessario che il modello sia in grado di scambiare informazioni correttamente, senza perdite di tempo e reinserimento di dati. L’obiettivo del seguente lavoro di tesi è quello di approfondire le tematiche legate alla corretta conservazione dei dati e delle informazioni associate agli elementi del modello mostrando in particolare, i vantaggi che l’IFC offre in questo campo. L’analisi dell’IFC trova la sua applicazione in due casi studio dimostrando così come una corretta impostazione del flusso informativo sin dalla fase preliminare alla progettazione possa essere utile per quella che viene considerata la fase più lunga dell’intero processo: la fase di gestione. La definizione del flusso parte dunque dall’individuazione delle specifiche informative da inserire all’interno del Capitolato Informativo sino alla fase finale di integrazione del modello nella piattaforma IWMS.

L'adozione dell'IFC per il ciclo di vita dell'opera : analisi del flusso informativo e casi studio per la sua applicazione nella fase di gestione immobiliare

Crafa, Emanuela
2019/2020

Abstract

The BIM (Building Information Modeling) modeling has the task of ensuring the management of information through the organization of the data produced during the entire life cycle of the work. The building process involves numerous professional figures who relate to each other and, in order to reduce the possibility of errors, it is necessary that the model is able to exchange information correctly, without wasting time and reinserting data. The objective of the following thesis work is to deepen the issues related to the correct storage of data and information associated with the elements of the model, showing in particular, the advantages that the IFC offers in this field. The analysis of the IFC finds its application in two case studies showing how a correct setting of the information flow from the preliminary phase to the design can be useful for what is considered the longest phase of the whole process: the management phase. The definition of the flow starts therefore from the identification of the informative specifications to insert inside the informative specifications until the final phase of integration of the model in the IWMS platform.
BISIN, MARCO
ARC I - Scuola di Architettura Urbanistica Ingegneria delle Costruzioni
2-ott-2020
2019/2020
La modellazione BIM (Building Information Modeling) ha il compito di garantire la gestione delle informazioni attraverso l’organizzazione dei dati prodotti durante l’intero ciclo di vita dell’opera. Il processo costruttivo vede coinvolte numerose figure professionali che si relazionano tra di loro e, al fine di diminuire la possibilità di errori, è necessario che il modello sia in grado di scambiare informazioni correttamente, senza perdite di tempo e reinserimento di dati. L’obiettivo del seguente lavoro di tesi è quello di approfondire le tematiche legate alla corretta conservazione dei dati e delle informazioni associate agli elementi del modello mostrando in particolare, i vantaggi che l’IFC offre in questo campo. L’analisi dell’IFC trova la sua applicazione in due casi studio dimostrando così come una corretta impostazione del flusso informativo sin dalla fase preliminare alla progettazione possa essere utile per quella che viene considerata la fase più lunga dell’intero processo: la fase di gestione. La definizione del flusso parte dunque dall’individuazione delle specifiche informative da inserire all’interno del Capitolato Informativo sino alla fase finale di integrazione del modello nella piattaforma IWMS.
File allegati
File Dimensione Formato  
Tesi - Emanuela Crafa.pdf

solo utenti autorizzati dal 09/09/2021

Dimensione 2.94 MB
Formato Adobe PDF
2.94 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/166610