Laveria Lamarmora is a structure considered as the most modern separation plant of pure mineral in all of Sardinia, located in the southwestern area of the island, in the Iglesiente area, between the Arburese Guspinese and the Sulcis area. The most important mines are located in the so-called "Iglesiente metalliferous ring", where the mineralizations of lead, silver and zinc are located in the carbonate geological formations. The project site is well connected with the city of Cagliari and with the neighboring cities, Iglesias and Carbonia. The style of construction of the Laveria is Neo-medieval. It is a building set on a steep ridge facing the sea, developed on different levels and built with stones. The site, in addition to the main structure, had other structures useful for the mineral processing process, including the calcination ovens and a small naval landing with an adjoining deposit (the end of the production process). The project interventions on the structure of the Laveria were limited to a minimum. It was decided to design them as if they were a modification of the soil and not of the structure. This has made it possible to create different "scenarios" that guarantee disparate experiences within the structure. The new construction works concern the project of a new building on the top of the hill and a new project on the existing structure of the warehouse building. Nebida therefore becomes the opportunity to create an intervention that is a critical and cultural act capable of outlining new development prospects.
La Laveria Lamarmora, è una struttura considerata come il più moderno impianto di separazione del minerale puro di tutta la Sardegna, situata nella zona sudoccidentale dell’isola, nell’area dell’Iglesiente, tra l’Arburese Guspinese e quella del Sulcis. Le miniere più importanti si trovano nel cosiddetto “anello metallifero dell’Iglesiente”, dove le mineralizzazioni di piombo, argento e zinco sono insediate nelle formazioni geologiche carbonatiche. Il sito di progetto è ben collegata con la città di Cagliari e con le città limitrofe, Iglesias e Carbonia. Lo stile di costruzione della Laveria è Neo-medioevale. Si tratta di un edificio adagiato su un costone scosceso davanti al mare, sviluppato su diversi livelli e realizzato con pietra a vista. Il sito, oltre alla struttura principale, presentava altre strutture utili per il processo della lavorazione dei minerali, tra cui i forni di calcinazione e un piccolo approdo navale con annesso il deposito, termine del processo produttivo. Gli interventi sulla struttura della Laveria sono stati limitati al minimo. Si è deciso di progettarli come se fossero di modificazione del suolo e non della struttura. Questo ha permesso di realizzare diversi “scenari” che garantiscano di vivere differenti esperienze all’interno della struttura. Gli interventi di nuova costruzione riguardano il progetto di un edificio ex novo sulla cima della collina e ad un progetto in parte ex novo e in parte no per l’edificio del deposito. Nebida quindi diventa l’opportunità di realizzare un intervento che sia atto critico e culturale in grado di delineare nuove prospettive di sviluppo.
Laveria Lamarmora, Nebida. Nuovi scenari tra arte, cultura e natura
DANDER, LAURA;Dessalvi, Camilla Isotta
2019/2020
Abstract
Laveria Lamarmora is a structure considered as the most modern separation plant of pure mineral in all of Sardinia, located in the southwestern area of the island, in the Iglesiente area, between the Arburese Guspinese and the Sulcis area. The most important mines are located in the so-called "Iglesiente metalliferous ring", where the mineralizations of lead, silver and zinc are located in the carbonate geological formations. The project site is well connected with the city of Cagliari and with the neighboring cities, Iglesias and Carbonia. The style of construction of the Laveria is Neo-medieval. It is a building set on a steep ridge facing the sea, developed on different levels and built with stones. The site, in addition to the main structure, had other structures useful for the mineral processing process, including the calcination ovens and a small naval landing with an adjoining deposit (the end of the production process). The project interventions on the structure of the Laveria were limited to a minimum. It was decided to design them as if they were a modification of the soil and not of the structure. This has made it possible to create different "scenarios" that guarantee disparate experiences within the structure. The new construction works concern the project of a new building on the top of the hill and a new project on the existing structure of the warehouse building. Nebida therefore becomes the opportunity to create an intervention that is a critical and cultural act capable of outlining new development prospects.File | Dimensione | Formato | |
---|---|---|---|
2020_12_Dander_Dessalvi_01.pdf
Open Access dal 02/12/2023
Descrizione: Testo della Tesi
Dimensione
27.58 MB
Formato
Adobe PDF
|
27.58 MB | Adobe PDF | Visualizza/Apri |
2020_12_Dander_Dessalvi_02.pdf
solo utenti autorizzati dal 02/12/2023
Descrizione: Tavole di progetto
Dimensione
87.68 MB
Formato
Adobe PDF
|
87.68 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/175337