The purpose of this study is to provide the BIM environment with an automation system and focusing on three main points. First, how the automation system can increase the integration between the project schedule and visualization model through a dynamic link between them. Besides, Assembling the data in the desired form to grant 4d (time) and 5d (cost) of the BIM dimensions with more flexibility to add a new custom tool or function. Second, the automation system facilitates the application of earned value method, thanks to its ability to manipulate project data to provide earned value method with its inputs. It also adds a wonderful data visualization to the earned value analysis for more results interpretation. Last, The system opens the door to adopt the earned schedule method to improve the reliability of the schedule performance indices and project duration forecasting.
Lo scopo di questo studio è fornire all'ambiente BIM un sistema di automazione e concentrarsi su tre punti principali. In primo luogo, come il sistema di automazione può aumentare l'integrazione tra la pianificazione del progetto e il modello di visualizzazione attraverso un collegamento dinamico tra di loro. Inoltre, assemblare i dati nella forma desiderata per garantire 4d (tempo) e 5d (costo) delle dimensioni BIM con maggiore flessibilità per aggiungere un nuovo strumento o funzione personalizzata. In secondo luogo, il sistema di automazione facilita l'applicazione del metodo del valore realizzato, grazie alla sua capacità di manipolare i dati del progetto per fornire il metodo del valore realizzato con i suoi input. Aggiunge anche una meravigliosa visualizzazione dei dati all'analisi del valore realizzato per una maggiore interpretazione dei risultati. Infine, il sistema apre le porte all'adozione del metodo della schedulazione guadagnata per migliorare l'affidabilità degli indici di prestazione della schedulazione e della previsione della durata del progetto.
Providing the BIM environment with an automation system that increases integration and facilitates the application of earned value management
Abdelrahman, Mohammed Youssef Mohammed
2020/2021
Abstract
The purpose of this study is to provide the BIM environment with an automation system and focusing on three main points. First, how the automation system can increase the integration between the project schedule and visualization model through a dynamic link between them. Besides, Assembling the data in the desired form to grant 4d (time) and 5d (cost) of the BIM dimensions with more flexibility to add a new custom tool or function. Second, the automation system facilitates the application of earned value method, thanks to its ability to manipulate project data to provide earned value method with its inputs. It also adds a wonderful data visualization to the earned value analysis for more results interpretation. Last, The system opens the door to adopt the earned schedule method to improve the reliability of the schedule performance indices and project duration forecasting.File | Dimensione | Formato | |
---|---|---|---|
2021_7_Abdelrahman_Mohammed.pdf
non accessibile
Descrizione: Thesis text
Dimensione
2.64 MB
Formato
Adobe PDF
|
2.64 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/177426