The construction sector is, in recent years, the main receptor of the results of a change process that will lead to the almost complete digitalization of interventions throughout their entire life cycle. The use of Building Information Modeling and the interoperability between the various software bring with them a new concept of design and execution: both allow the complete involvement of all the figures and, consequently, of all the disciplines of a construction process. The possibility to let communicate the three-dimensional model BIM with the normative texts, the design work and the construction site itself leads to a reduction of errors that would occur if the process remained cumbersome and based on incomplete validation activities, understood as a procedure of control and verification of a project. Time, costs and quality of a project are the key points for the complete success of the project and the increase in productivity and efficiency, accompanied by a growing automation of the process brings with it numerous advantages that will progressively involve all building processes.

Il settore delle costruzioni è, negli ultimi anni, il principale recettore dei risultati di un processo di cambiamento che porterà alla quasi completa digitalizzazione degli interventi lungo il loro intero ciclo di vita. L’utilizzo del Building Information Modeling e l’interoperabilità tra i vari software portano con loro un nuovo concetto di progettazione ed esecuzione: entrambi permettono il completo coinvolgimento di tutte le figure e, di conseguenza, di tutte le discipline all’interno del processo edilizio. La possibilità di far comunicare il modello tridimensionale BIM con i testi normativi, gli elaborati progettuali e lo stesso cantiere porta a una riduzione degli errori che si verificherebbero se il processo rimanesse macchinoso e basato su attività di validazione, intesa come procedura di controllo e verifica di un progetto, incomplete. Tempi, costi e qualità di un progetto costituiscono i punti cardine per la completa riuscita dello stesso e l’aumento di produttività ed efficienza, accompagnato da una crescente automatizzazione del processo porta con sé numerosi vantaggi che coinvolgeranno progressivamente tutti i processi edilizi.

La validazione dei progetti di edilizia sanitaria sviluppati mediante BIM. Applicazione alla rete ambulatoriale del centro medico Santagostino

Pizzino, Fabio;Conte, Monica
2020/2021

Abstract

The construction sector is, in recent years, the main receptor of the results of a change process that will lead to the almost complete digitalization of interventions throughout their entire life cycle. The use of Building Information Modeling and the interoperability between the various software bring with them a new concept of design and execution: both allow the complete involvement of all the figures and, consequently, of all the disciplines of a construction process. The possibility to let communicate the three-dimensional model BIM with the normative texts, the design work and the construction site itself leads to a reduction of errors that would occur if the process remained cumbersome and based on incomplete validation activities, understood as a procedure of control and verification of a project. Time, costs and quality of a project are the key points for the complete success of the project and the increase in productivity and efficiency, accompanied by a growing automation of the process brings with it numerous advantages that will progressively involve all building processes.
MANNINO, ANTONINO
ARC I - Scuola di Architettura Urbanistica Ingegneria delle Costruzioni
7-ott-2021
2020/2021
Il settore delle costruzioni è, negli ultimi anni, il principale recettore dei risultati di un processo di cambiamento che porterà alla quasi completa digitalizzazione degli interventi lungo il loro intero ciclo di vita. L’utilizzo del Building Information Modeling e l’interoperabilità tra i vari software portano con loro un nuovo concetto di progettazione ed esecuzione: entrambi permettono il completo coinvolgimento di tutte le figure e, di conseguenza, di tutte le discipline all’interno del processo edilizio. La possibilità di far comunicare il modello tridimensionale BIM con i testi normativi, gli elaborati progettuali e lo stesso cantiere porta a una riduzione degli errori che si verificherebbero se il processo rimanesse macchinoso e basato su attività di validazione, intesa come procedura di controllo e verifica di un progetto, incomplete. Tempi, costi e qualità di un progetto costituiscono i punti cardine per la completa riuscita dello stesso e l’aumento di produttività ed efficienza, accompagnato da una crescente automatizzazione del processo porta con sé numerosi vantaggi che coinvolgeranno progressivamente tutti i processi edilizi.
File allegati
File Dimensione Formato  
2021_10_Conte_Pizzino.pdf

accessibile in internet solo dagli utenti autorizzati

Dimensione 5.03 MB
Formato Adobe PDF
5.03 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/179957