The ESA’s aim is to reduce the cost of a launch and to increase its performances by building Ariane 6 and Vega C. The P120 is their common solid propulsion motor developed and integrated by Europropulsion on the Guyanese Space Center site. The optimization of the production is the key to cost reducing. The Value Stream Mapping is an image of the production process. It helps to optimize the chain of operations, the stocks and the waiting times. The clients and the suppliers are studied too. The main problem identified is the waiting time. The tool will be completed when the production of the motors starts, identifying the actions to be taken. The spaghetti diagram is an image of the displacements of the goods. It is used to optimize the displacements of the integration tools inside and between the buildings. It led to that most of the displacements can’t be changed and to ideas to be implemented to optimize the remaining ones. The Overall Equipment Effectiveness is an indicator of the efficiency of an integration tool, it describes its quality, its performance and its availability. It allows to detect the defaults to be treated to gain efficiency. It has been seen that the quality is not a problem but the availability and the performance will be challenging when the production starts.

L'obiettivo dell’ESA è di ridurre i costi di un lancio e di aumentare le sue performance costruendo Ariane 6 e Vega C. Il P120 è il loro motore comune a propulsione solida sviluppato e integrato da Europropulsion nel centro spaziale guianese. L’ottimizzazione della produzione è la chiave per diminuire i costi. La Value Stream Mapping è un’immagine del processo di produzione. Aiuta per ottimizzare la catena di operazioni, gli stock ed i tempi di attesa. Inoltre anche i clienti ed i fornitori sono studiati. Il principale problema identificato sono i tempi di attesa. L'analisi sarà completata quando la produzione dei motori di serie inizierà, identificando le azioni da prendere. Il diagramma spaghetti è un’immagine degli spostamenti dei beni. È utilizzato per ottimizzare gli spostamenti delle attrezzature di integrazione dentro e tra edifici. Questo conduce al fatto che quasi tutti gli spostamenti non possono essere cambiati ed a idee da implementare per ottimizzare il resto. L'Overall Equipment Effectiveness è un indicatore dell’efficacia di un attrezzatura d'integrazione, descrive i suoi tassi di qualità, efficienza e disponibilità. Permette il rilevamento dei diffeti che devono essere trattati per guadagnare efficacia. Il tasso di qualità non è un problema ma la disponibilità e la performance saranno un challenge quando la produzione seriale comincerà.

Optimization study for the production of the P120

TAUPIN, HORTENSE ANDREA MADELEINE
2021/2022

Abstract

The ESA’s aim is to reduce the cost of a launch and to increase its performances by building Ariane 6 and Vega C. The P120 is their common solid propulsion motor developed and integrated by Europropulsion on the Guyanese Space Center site. The optimization of the production is the key to cost reducing. The Value Stream Mapping is an image of the production process. It helps to optimize the chain of operations, the stocks and the waiting times. The clients and the suppliers are studied too. The main problem identified is the waiting time. The tool will be completed when the production of the motors starts, identifying the actions to be taken. The spaghetti diagram is an image of the displacements of the goods. It is used to optimize the displacements of the integration tools inside and between the buildings. It led to that most of the displacements can’t be changed and to ideas to be implemented to optimize the remaining ones. The Overall Equipment Effectiveness is an indicator of the efficiency of an integration tool, it describes its quality, its performance and its availability. It allows to detect the defaults to be treated to gain efficiency. It has been seen that the quality is not a problem but the availability and the performance will be challenging when the production starts.
FIORI, LORENZO
ING - Scuola di Ingegneria Industriale e dell'Informazione
21-dic-2021
2021/2022
L'obiettivo dell’ESA è di ridurre i costi di un lancio e di aumentare le sue performance costruendo Ariane 6 e Vega C. Il P120 è il loro motore comune a propulsione solida sviluppato e integrato da Europropulsion nel centro spaziale guianese. L’ottimizzazione della produzione è la chiave per diminuire i costi. La Value Stream Mapping è un’immagine del processo di produzione. Aiuta per ottimizzare la catena di operazioni, gli stock ed i tempi di attesa. Inoltre anche i clienti ed i fornitori sono studiati. Il principale problema identificato sono i tempi di attesa. L'analisi sarà completata quando la produzione dei motori di serie inizierà, identificando le azioni da prendere. Il diagramma spaghetti è un’immagine degli spostamenti dei beni. È utilizzato per ottimizzare gli spostamenti delle attrezzature di integrazione dentro e tra edifici. Questo conduce al fatto che quasi tutti gli spostamenti non possono essere cambiati ed a idee da implementare per ottimizzare il resto. L'Overall Equipment Effectiveness è un indicatore dell’efficacia di un attrezzatura d'integrazione, descrive i suoi tassi di qualità, efficienza e disponibilità. Permette il rilevamento dei diffeti che devono essere trattati per guadagnare efficacia. Il tasso di qualità non è un problema ma la disponibilità e la performance saranno un challenge quando la produzione seriale comincerà.
File allegati
File Dimensione Formato  
2021_12_TAUPIN.pdf

accessibile in internet solo dagli utenti autorizzati

Descrizione: text of the thesis
Dimensione 3.86 MB
Formato Adobe PDF
3.86 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/182025