The thesis work was carried out at the engineering company Esa Progetti S.r.l. where I performed, in addition to the specific thesis design, a training internship in order to learn the use of software, interact with the regulations and relate to the reality of the facts. During the internship I learned to interact, through the ENEA portal, with the regulations of Ecobonus, Bonuscasa and Superbonus, for the implementation of the discount on the invoice and the assignment of credit, in particular I learned how to fill in the regulatory forms present in the ENEA portal and the regulatory constraints necessary to obtain the discount on the invoice regulated by the aforementioned regulations. The purpose of the thesis work I carried out is the energy requalification of a semi-detached villa located in a climatic zone E in compliance with the constraints imposed by the Superbonus110% regulation, in terms of building envelope and heating system. In particular for the thesis work, with the help of the company tutors, we carried out inspections at the building in question to better understand the characteristics of the building-plant system in order to better implement the stratigraphies and plant present. Through the Edilclima software we have produced the energy performance certificate (APE) necessary for verifying the constraints imposed by the Superbonus legislation and necessary to understand what the performance of the building was. The thesis work progressed with the choice of components that allow the building to improve its energy quality and therefore reduce its consumption, in particular we have chosen to apply a thermal coat to the building to improve thermal transmittance and thermal transmittance. periodic of the external walls in compliance with the constraints imposed by current legislation, we have chosen to drastically modify the heat generation system by passing from two autonomous systems to a centralized system no longer governed by condensing boilers but governed by a high-speed heat pump efficiency. Furthermore, given that the legislation allows it, we have chosen to replace the windows with the worst thermal characteristics, replace the summer air conditioning system, install a new domestic hot water production system and modify the self-production system of electricity. expanding the photovoltaic system and installing storage batteries complete with a column for charging electric vehicles. The design work ended with the verification of the technical limits that allow the following energy requalification work to access the Superbonus regulations, the production of the energy performance certificate of the project status which certifies the improvement of the energy class, the reduction of consumption and the increase in energy production from renewable sources.

Il lavoro di tesi è stato svolto presso la società di ingegneria Esa Progetti S.r.l. dove ho eseguito, oltre alla specifica progettazione di tesi, uno stage formativo al fine di apprendere l’utilizzo dei software, interagire con le normative e rapportarsi con la realtà dei fatti. Durante l'attività di stage ho imparato ad interagire, tramite il portale ENEA, con le normative di Ecobonus, Bonuscasa e Superbonus, per l’implementazione dello sconto in fattura e la cessione del credito, in particolare ho appreso la compilazione delle schede normative presenti nel portale ENEA e i vincoli normativi necessari all'ottenimento dello sconto in fattura regolamentato dalle suddette normative. Lo scopo del lavoro di tesi da me svolto è la riqualifica energetica di una villa bifamiliare situata in zona climatica E nel rispetto dei vincoli imposti dalla normativa di Superbonus110%, nei termini di involucro edilizio e di impianto termico. In particolare per il lavoro di tesi, tramite l’aiuto dei tutor aziendali, abbiamo svolto dei sopralluoghi presso l’edificio in oggetto per meglio comprendere le caratteristiche del sistema edificio-impianto al fine di poter implementare al meglio nel software Edilclima le stratigrafie e l’impianto presente. Tramite il software Edilclima abbiamo prodotto l’attestato di prestazione energetica (APE) necessario alla verifica dei vincoli imposti dalla normativa di Superbonus e necessario a comprendere quali fossero le prestazioni dell’edificio. Il lavoro di tesi è progredito con la scelta di componenti che permettano all’edificio di migliorare la sua qualità energetica e ridurre quindi i suoi consumi, in particolare abbiamo scelto di applicare un cappotto termico all’edificio per migliorare la trasmittanza termica e la trasmittanza termica periodica delle pareti esterne nel rispetto dei vincoli imposti dalla normativa vigente, abbiamo scelto di modificare drasticamente l’impianto di generazione del calore passando da due sistemi autonomi ad un sistema centralizzato non più governato dalle caldaie a condensazione ma governato da una pompa di calore ad alta efficienza. Inoltre visto che la normativa lo permette, abbiamo scelto di sostituire i serramenti con le caratteristiche termiche peggiori, sostituire il sistema di climatizzazione estiva, installare un nuovo sistema di produzione dell’acqua calda sanitaria e di modificare il sistema di auto produzione dell’energia elettrica ampliando il sistema fotovoltaico ed installando delle batterie di accumulo con tanto di colonnina per la ricarica di veicoli elettrici. L’opera di progettazione è conclusa con la verifica dei limiti tecnici che permettano alla seguente opera di riqualifica energetica di accedere alla normativa di Superbonus, la produzione dell’attestato di prestazione energetica dello stato progettuale che certifica il miglioramento della classe energetica, la riduzione dei consumi e l’aumento della produzione energetica mediante fonte rinnovabile.

Studio ed analisi energetica di una villa bifamiliare in ottica di superbonus 110%

Bernazzani, Marcello
2021/2022

Abstract

The thesis work was carried out at the engineering company Esa Progetti S.r.l. where I performed, in addition to the specific thesis design, a training internship in order to learn the use of software, interact with the regulations and relate to the reality of the facts. During the internship I learned to interact, through the ENEA portal, with the regulations of Ecobonus, Bonuscasa and Superbonus, for the implementation of the discount on the invoice and the assignment of credit, in particular I learned how to fill in the regulatory forms present in the ENEA portal and the regulatory constraints necessary to obtain the discount on the invoice regulated by the aforementioned regulations. The purpose of the thesis work I carried out is the energy requalification of a semi-detached villa located in a climatic zone E in compliance with the constraints imposed by the Superbonus110% regulation, in terms of building envelope and heating system. In particular for the thesis work, with the help of the company tutors, we carried out inspections at the building in question to better understand the characteristics of the building-plant system in order to better implement the stratigraphies and plant present. Through the Edilclima software we have produced the energy performance certificate (APE) necessary for verifying the constraints imposed by the Superbonus legislation and necessary to understand what the performance of the building was. The thesis work progressed with the choice of components that allow the building to improve its energy quality and therefore reduce its consumption, in particular we have chosen to apply a thermal coat to the building to improve thermal transmittance and thermal transmittance. periodic of the external walls in compliance with the constraints imposed by current legislation, we have chosen to drastically modify the heat generation system by passing from two autonomous systems to a centralized system no longer governed by condensing boilers but governed by a high-speed heat pump efficiency. Furthermore, given that the legislation allows it, we have chosen to replace the windows with the worst thermal characteristics, replace the summer air conditioning system, install a new domestic hot water production system and modify the self-production system of electricity. expanding the photovoltaic system and installing storage batteries complete with a column for charging electric vehicles. The design work ended with the verification of the technical limits that allow the following energy requalification work to access the Superbonus regulations, the production of the energy performance certificate of the project status which certifies the improvement of the energy class, the reduction of consumption and the increase in energy production from renewable sources.
BONETTI, STEFANO
MONTERUMICI, MARCELLO
ING - Scuola di Ingegneria Industriale e dell'Informazione
28-apr-2022
2021/2022
Il lavoro di tesi è stato svolto presso la società di ingegneria Esa Progetti S.r.l. dove ho eseguito, oltre alla specifica progettazione di tesi, uno stage formativo al fine di apprendere l’utilizzo dei software, interagire con le normative e rapportarsi con la realtà dei fatti. Durante l'attività di stage ho imparato ad interagire, tramite il portale ENEA, con le normative di Ecobonus, Bonuscasa e Superbonus, per l’implementazione dello sconto in fattura e la cessione del credito, in particolare ho appreso la compilazione delle schede normative presenti nel portale ENEA e i vincoli normativi necessari all'ottenimento dello sconto in fattura regolamentato dalle suddette normative. Lo scopo del lavoro di tesi da me svolto è la riqualifica energetica di una villa bifamiliare situata in zona climatica E nel rispetto dei vincoli imposti dalla normativa di Superbonus110%, nei termini di involucro edilizio e di impianto termico. In particolare per il lavoro di tesi, tramite l’aiuto dei tutor aziendali, abbiamo svolto dei sopralluoghi presso l’edificio in oggetto per meglio comprendere le caratteristiche del sistema edificio-impianto al fine di poter implementare al meglio nel software Edilclima le stratigrafie e l’impianto presente. Tramite il software Edilclima abbiamo prodotto l’attestato di prestazione energetica (APE) necessario alla verifica dei vincoli imposti dalla normativa di Superbonus e necessario a comprendere quali fossero le prestazioni dell’edificio. Il lavoro di tesi è progredito con la scelta di componenti che permettano all’edificio di migliorare la sua qualità energetica e ridurre quindi i suoi consumi, in particolare abbiamo scelto di applicare un cappotto termico all’edificio per migliorare la trasmittanza termica e la trasmittanza termica periodica delle pareti esterne nel rispetto dei vincoli imposti dalla normativa vigente, abbiamo scelto di modificare drasticamente l’impianto di generazione del calore passando da due sistemi autonomi ad un sistema centralizzato non più governato dalle caldaie a condensazione ma governato da una pompa di calore ad alta efficienza. Inoltre visto che la normativa lo permette, abbiamo scelto di sostituire i serramenti con le caratteristiche termiche peggiori, sostituire il sistema di climatizzazione estiva, installare un nuovo sistema di produzione dell’acqua calda sanitaria e di modificare il sistema di auto produzione dell’energia elettrica ampliando il sistema fotovoltaico ed installando delle batterie di accumulo con tanto di colonnina per la ricarica di veicoli elettrici. L’opera di progettazione è conclusa con la verifica dei limiti tecnici che permettano alla seguente opera di riqualifica energetica di accedere alla normativa di Superbonus, la produzione dell’attestato di prestazione energetica dello stato progettuale che certifica il miglioramento della classe energetica, la riduzione dei consumi e l’aumento della produzione energetica mediante fonte rinnovabile.
File allegati
File Dimensione Formato  
TESI FINALE.pdf

accessibile in internet per tutti

Descrizione: Studio ed Analisi Energetica di una Villa Bifamiliare in ottica di Superbonus 110%
Dimensione 5.05 MB
Formato Adobe PDF
5.05 MB Adobe PDF Visualizza/Apri