In the middle of Yunnan Province in China, the habitat of the endangered green peafowl was going to submerged by the Jiasa hydropower station. To preserve the natural resources, the power station was stopped by the effort of NGO and court. A biological research center was constructed on these half-built structure of division tunnel, which is for the further study of the indigenous biodiversity and also a monument for the winning of this public interest litigation. The landscape recovery work was also planned to make up the destroy from the previous construction. And combined with the iconic research station, these interventions also serve as a special tourist route characterized with the large scale concrete work in post-dam.
Nel mezzo della provincia dello Yunnan in Cina, l'habitat del pavone verde in via di estinzione stava per essere sommerso dalla centrale idroelettrica di Jiasa. Per preservare le risorse naturali, la centrale è stata fermata grazie allo sforzo di ONG e tribunale. Su questa struttura semicostruita del tunnel di divisione è stato costruito un centro di ricerca biologica, che è per l'ulteriore studio della biodiversità indigena e anche un monumento per la vittoria di questo contenzioso di interesse pubblico. L'intervento di recupero paesaggistico è stato previsto anche per recuperare la distruzione della precedente costruzione. E in combinazione con l'iconica stazione di ricerca, questi interventi fungono anche da percorso turistico speciale caratterizzato dall'opera in cemento su larga scala nella post-diga.
Post-dam age
CHEN, CAIWEI
2021/2022
Abstract
In the middle of Yunnan Province in China, the habitat of the endangered green peafowl was going to submerged by the Jiasa hydropower station. To preserve the natural resources, the power station was stopped by the effort of NGO and court. A biological research center was constructed on these half-built structure of division tunnel, which is for the further study of the indigenous biodiversity and also a monument for the winning of this public interest litigation. The landscape recovery work was also planned to make up the destroy from the previous construction. And combined with the iconic research station, these interventions also serve as a special tourist route characterized with the large scale concrete work in post-dam.File | Dimensione | Formato | |
---|---|---|---|
Post-dam Age_ChenCaiwei.pdf
Open Access dal 24/11/2023
Descrizione: A1 Panel
Dimensione
33.16 MB
Formato
Adobe PDF
|
33.16 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/197336