The thesis in question was written during an internship at a multinational company that works in the building and plant engineering sector, Bouygues Energies & Services, which deals with the design and installation of mechanical, electrical and fire-fighting systems, as well as their maintenance and construction of infrastructures public and telecommunications. In particular, my task was to evaluate any changes to be made to the executive project created by an engineering society for Covivio of Building F which is part of the new Symbiosis community district, evaluating the cost-effectiveness, feasibility, advantages and energy impact of such changes. The first object of the study was the heating and cooling power plant and the air treatment units, to evaluate whether the adoption of new machines would prove to be technically adequate, as well as being economically and energetically advantageous using a calculation method said of the bins, illustrated in more detail in the chapter dedicated to it, taking advantage of the skills I have acquired with studies in the thermodynamic field and the most recent standards for estimating the energy demands of AHUs, pumps and multipurpose units. Subsequently I dealt with the feasibility assessment of the modification of the aeraulic network of the forced smoke and heat extraction system of the fire prevention system. I studied and developed a new configuration of paths and accessories that would guarantee the new fans to have a balanced network, with flow rates and pressure drops capable of guaranteeing compliance with the standards. The aim is to reduce the overall dimensions in the false ceilings, in which it would not have been possible to carry out the installation, and also guaranteeing the redundancy of these elements, thus increasing the reliability of the system, as well as a small but not negligible economic saving in the phase of purchase.

La tesi in oggetto è stata scritta durante il tirocinio presso una multinazionale che lavora nel settore edilizio ed impiantistico, Bouygues Energies & Services, che si occupa della progettazione e installazione di impianti meccanici, elettrici e antincendio, oltre alla loro manutenzione e alla realizzazione di infrastrutture pubbliche e di telecomunicazione. In particolare, il mio compito è stato quello di valutare alcune eventuali modifiche e ottimizzazioni da apportare al progetto esecutivo già realizzato da una società di ingegneria, incaricata dal committente Covivio, dell’Edificio F facente parte del nuovo community district Symbiosis, valutando l’economicità, la fattibilità, i vantaggi e l’impatto energetico di tali modifiche. Il primo oggetto di studio è stata la centrale di produzione di potenza termica, frigorifera e le unità di trattamento aria, per valutare se l’adozione di nuove macchine si sarebbe rivelata tecnicamente adeguata, oltre ad essere economicamente ed energeticamente vantaggiosa utilizzando un metodo di calcolo detto dei bin, illustrato più approfonditamente nel capitolo ad esso dedicato, sfruttando le competenze che ho acquisito con gli studi nell’ambito termodinamico e le norme più recenti per la stima delle richieste energetiche di UTA (Unità di Trattamento Aria), pompe e unità polivalenti. In questo modo sono stato in grado di stimare i consumi energetici delle diverse soluzioni e valutarne di conseguenza la differenza di costi. Successivamente mi sono occupato della valutazione di fattibilità della modifica della rete aeraulica dell’impianto di estrazione forzata di fumo e calore del sistema antincendio. Ho studiato ed elaborato una nuova configurazione di percorsi e accessori che garantisse ai nuovi ventilatori di avere una rete bilanciata, con portate e perdite di carico in grado da garantire il rispetto delle norme. L’obbiettivo è quello di ridurre gli ingombri nei controsoffitti, nei quali non sarebbe stato possibile effettuare l’installazione, e garantendo inoltre la ridondanza di tali elementi incrementando così l’affidabilità del sistema, oltre a un piccolo ma non trascurabile risparmio economico in fase di acquisto.

progetto symbiosis district: analisi e ottimizzazione impiantistica del nuovo headquarter snam

Molteni, Andrea
2021/2022

Abstract

The thesis in question was written during an internship at a multinational company that works in the building and plant engineering sector, Bouygues Energies & Services, which deals with the design and installation of mechanical, electrical and fire-fighting systems, as well as their maintenance and construction of infrastructures public and telecommunications. In particular, my task was to evaluate any changes to be made to the executive project created by an engineering society for Covivio of Building F which is part of the new Symbiosis community district, evaluating the cost-effectiveness, feasibility, advantages and energy impact of such changes. The first object of the study was the heating and cooling power plant and the air treatment units, to evaluate whether the adoption of new machines would prove to be technically adequate, as well as being economically and energetically advantageous using a calculation method said of the bins, illustrated in more detail in the chapter dedicated to it, taking advantage of the skills I have acquired with studies in the thermodynamic field and the most recent standards for estimating the energy demands of AHUs, pumps and multipurpose units. Subsequently I dealt with the feasibility assessment of the modification of the aeraulic network of the forced smoke and heat extraction system of the fire prevention system. I studied and developed a new configuration of paths and accessories that would guarantee the new fans to have a balanced network, with flow rates and pressure drops capable of guaranteeing compliance with the standards. The aim is to reduce the overall dimensions in the false ceilings, in which it would not have been possible to carry out the installation, and also guaranteeing the redundancy of these elements, thus increasing the reliability of the system, as well as a small but not negligible economic saving in the phase of purchase.
ING - Scuola di Ingegneria Industriale e dell'Informazione
4-mag-2023
2021/2022
La tesi in oggetto è stata scritta durante il tirocinio presso una multinazionale che lavora nel settore edilizio ed impiantistico, Bouygues Energies & Services, che si occupa della progettazione e installazione di impianti meccanici, elettrici e antincendio, oltre alla loro manutenzione e alla realizzazione di infrastrutture pubbliche e di telecomunicazione. In particolare, il mio compito è stato quello di valutare alcune eventuali modifiche e ottimizzazioni da apportare al progetto esecutivo già realizzato da una società di ingegneria, incaricata dal committente Covivio, dell’Edificio F facente parte del nuovo community district Symbiosis, valutando l’economicità, la fattibilità, i vantaggi e l’impatto energetico di tali modifiche. Il primo oggetto di studio è stata la centrale di produzione di potenza termica, frigorifera e le unità di trattamento aria, per valutare se l’adozione di nuove macchine si sarebbe rivelata tecnicamente adeguata, oltre ad essere economicamente ed energeticamente vantaggiosa utilizzando un metodo di calcolo detto dei bin, illustrato più approfonditamente nel capitolo ad esso dedicato, sfruttando le competenze che ho acquisito con gli studi nell’ambito termodinamico e le norme più recenti per la stima delle richieste energetiche di UTA (Unità di Trattamento Aria), pompe e unità polivalenti. In questo modo sono stato in grado di stimare i consumi energetici delle diverse soluzioni e valutarne di conseguenza la differenza di costi. Successivamente mi sono occupato della valutazione di fattibilità della modifica della rete aeraulica dell’impianto di estrazione forzata di fumo e calore del sistema antincendio. Ho studiato ed elaborato una nuova configurazione di percorsi e accessori che garantisse ai nuovi ventilatori di avere una rete bilanciata, con portate e perdite di carico in grado da garantire il rispetto delle norme. L’obbiettivo è quello di ridurre gli ingombri nei controsoffitti, nei quali non sarebbe stato possibile effettuare l’installazione, e garantendo inoltre la ridondanza di tali elementi incrementando così l’affidabilità del sistema, oltre a un piccolo ma non trascurabile risparmio economico in fase di acquisto.
File allegati
File Dimensione Formato  
2023_05_Molteni.pdf

accessibile in internet per tutti

Descrizione: testo della tesi
Dimensione 4.55 MB
Formato Adobe PDF
4.55 MB Adobe PDF Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/206974