The following project aims to improve the configuration of the AVL system at Malpensa Airport. The analysis begins with a review of the state of art of AVL systems, followed by an examination of the reference legislation for the approval of a project to be carried out in the airport context. The current structure of the AVL system is then described, characterized by a series power supply system, which is intended to be modified to a parallel power supply system. Then, technical improvements, efficiency, and energy consumption of the new configuration are analyzed. The description of the planned intervention follows, focusing on the timetable of the initiative and the economic framework of the investment. Additionally, a study on the reliability of the new system is presented. The aim of the analysis is to highlight the improvements and advantages that the implementation of the project will bring through the modification of Malpensa Airport's power supply system, which concern in particular: increase in system efficiency; reduced energy consumption leading to cost savings, and simplified maintenance procedures with improvements on both a technical and economic level.

Il seguente elaborato tratta del progetto in via di realizzazione finalizzato al miglioramento della configurazione del sistema AVL dell’Aeroporto di Malpensa. L’analisi parte dalla ricostruzione dello stato dell’arte degli impianti AVL; segue la normativa di riferimento per l’approvazione di un progetto che deve essere realizzato in ambito aeroportuale. Viene quindi descritta l’attuale struttura dell’impianto AVL, caratterizzata da un sistema di alimentazione in serie, che si intende modificare passando a un sistema di alimentazione in parallelo, di cui vengono analizzate le migliorie tecniche, il rendimento e i consumi energetici. Segue la descrizione dell’intervento previsto, con attenzione sull’intero cronoprogramma dell’iniziativa e sul quadro economico dell’investimento. Viene inoltre riportato uno studio riguardo l’affidabilità del nuovo impianto. L’obiettivo dell’analisi è evidenziare le migliorie e i vantaggi che la realizzazione del progetto apporterà grazie alla modifica del sistema di alimentazione dell’Aeroporto di Malpensa, che riguardano in particolare: maggiore efficienza dell’impianto; riduzione dei consumi energetici, con la conseguente diminuzione dei costi; semplificazione delle procedure manutentive con miglioramenti sia sul piano tecnico che economico.

Nuovo sistema di alimentazione per il segnalamento aeroportuale AVL a LED

PELLIZZARO, SIMONE
2023/2024

Abstract

The following project aims to improve the configuration of the AVL system at Malpensa Airport. The analysis begins with a review of the state of art of AVL systems, followed by an examination of the reference legislation for the approval of a project to be carried out in the airport context. The current structure of the AVL system is then described, characterized by a series power supply system, which is intended to be modified to a parallel power supply system. Then, technical improvements, efficiency, and energy consumption of the new configuration are analyzed. The description of the planned intervention follows, focusing on the timetable of the initiative and the economic framework of the investment. Additionally, a study on the reliability of the new system is presented. The aim of the analysis is to highlight the improvements and advantages that the implementation of the project will bring through the modification of Malpensa Airport's power supply system, which concern in particular: increase in system efficiency; reduced energy consumption leading to cost savings, and simplified maintenance procedures with improvements on both a technical and economic level.
PACILLI, GIUSEPPE
ING - Scuola di Ingegneria Industriale e dell'Informazione
9-apr-2024
2023/2024
Il seguente elaborato tratta del progetto in via di realizzazione finalizzato al miglioramento della configurazione del sistema AVL dell’Aeroporto di Malpensa. L’analisi parte dalla ricostruzione dello stato dell’arte degli impianti AVL; segue la normativa di riferimento per l’approvazione di un progetto che deve essere realizzato in ambito aeroportuale. Viene quindi descritta l’attuale struttura dell’impianto AVL, caratterizzata da un sistema di alimentazione in serie, che si intende modificare passando a un sistema di alimentazione in parallelo, di cui vengono analizzate le migliorie tecniche, il rendimento e i consumi energetici. Segue la descrizione dell’intervento previsto, con attenzione sull’intero cronoprogramma dell’iniziativa e sul quadro economico dell’investimento. Viene inoltre riportato uno studio riguardo l’affidabilità del nuovo impianto. L’obiettivo dell’analisi è evidenziare le migliorie e i vantaggi che la realizzazione del progetto apporterà grazie alla modifica del sistema di alimentazione dell’Aeroporto di Malpensa, che riguardano in particolare: maggiore efficienza dell’impianto; riduzione dei consumi energetici, con la conseguente diminuzione dei costi; semplificazione delle procedure manutentive con miglioramenti sia sul piano tecnico che economico.
File allegati
File Dimensione Formato  
2024_04_Pellizzaro_Tesi_01.pdf

non accessibile

Descrizione: Testo della Tesi
Dimensione 9.83 MB
Formato Adobe PDF
9.83 MB Adobe PDF   Visualizza/Apri
2024_04_Pellizzaro_Executive Summary_02.pdf

non accessibile

Descrizione: Executive Summary
Dimensione 762.17 kB
Formato Adobe PDF
762.17 kB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/218607