INSPORT” is an urban recovery project involving the former ABB-Sace industrial area, that used to be in the outskirts but now it has been fully integrated into the residential area of Bergamo city. The site rests in strategic location, as it develops along Baioni Street – an arterial road connecting the city with the Brembana valley – and it is very close to Bergamo's ring road.The project aims at breathing new life into the existing derelict building – the factory was abandoned in 2014 – through the construction of a multidisciplinary sports center consisting of a sports hall, a swimming pool and services designed to foster the neighborhood’s social life that is currently quite poor.The “INSPORT” project brings together the restored and the new buildings through integrated facilities where all functions connect in space or communicate visually with one another and the neighborhood. The main driver in the design was to open the former factory site towards the neighborhood, as presently it is enclosed by an impenetrable opaque fence, and to build a permeable construction with easily accessible indoor and outdoor facilities characterized by extensive green areas and dedicated to community gathering and sports. Permeability is emphasized by an internal pathway, which both separates and unites the two sports areas, and extends outward with the same paving.My dissertation starts by analyzing the relevant urban aspects required to identify the construction’s main function. In addition, I carried out a survey of the building’s current state of preservation paying particular attention to elements with historical value, to define the main recovery interventions.Data collected on the site’s status were added to data from meta-design, which required the analysis of key stakeholders’ objectives and alternatives, and participatory design, to enable an information-based approach to the project.The analysis of user flows led me to create two different main drawings for the opposite sides of the facility. In fact the south-facing area entailed the recovery of the previous building, whereas the north-facing facilities were to be newly built. The north-facing site design echoes the restored construction’s modularity and the intervals between openings, and it is characterized by an extensive use of glass allowing to look inside.To minimize the building's energy consumption, the project includes several passive energy saving strategies, such as high-performance insulating envelopes for both the recovered and new buildings, draining pavements to mitigate the heat island effect, and vegetation playing a crucial role.A key aspect of the “INSPORT” project is related to inclusivity. The structure will host a wide range of sports for different age groups and competitive levels. It will be accessible also for children, athletes with disabilities, and residents will finally be able to enjoy a modern community center in their neighborhood.

“INSPORT” propone una soluzione per il recupero dell’area industriale ex ABB-Sace, un tempo periferica ed oggi integrata nel centro residenziale di Bergamo. L’area si trova in un punto strategico, affacciata su via Baioni, arteria che collega la città con la Valle Brembana, ed è in prossimità della circonvallazione esterna. Il progetto ridà vita al vuoto urbano creato dall’abbandono della fabbrica nel 2014 tramite la costruzione di un centro sportivo multidisciplinare con palazzetto, piscina e servizi per realizzare un luogo di socializzazione del quartiere colmandone l’attuale mancanza. “INSPORT” mette in relazione spaziale e visiva gli edifici recuperati con quelli di nuova costruzione realizzando un complesso integrato nel contesto. L’idea guida del progetto è l’apertura della ex-fabbrica, oggi chiusa da un impenetrabile recinto opaco, verso il contesto per costituire un edificio fruibile negli spazi coperti e nelle nuove aree esterne, caratterizzate dal verde, dedicate a sport e socialità. La permeabilità è sottolineata dal percorso interno, che separa ed al contempo unisce le funzioni sportive, prolungato verso l’esterno da una pavimentazione che ne evidenzia lo scopo. Il processo di tesi parte dall’analisi degli aspetti urbanistici per definire la funzione principale e dal rilievo dello stato di conservazione del manufatto, con particolare attenzione a dove risiede la memoria storica, per definire gli interventi di recupero principali. I dati dello stato di fatto, integrati dalla metaprogettazione, comprendente l’analisi degli obiettivi degli stakeholders e la progettazione partecipata, hanno consentito di approcciare il progetto in modo consapevole. Gli edifici destinati alle funzioni sportive sono stati oggetto di analisi strutturale ponendo attenzione al predimensionamento delle travi reticolari in acciaio che coprono la grande luce di 38 m richiesta. L’analisi dei flussi di utenza porta a realizzare due prospetti principali opposti: a sud, caratterizzato dal recupero ed a nord, il nuovo, che riprende la modularità di quello recuperato ed è caratterizzato dall’uso di vetro per permettere la visibilità verso l’interno. Per ridurre al minimo il fabbisogno energetico il progetto integra strategie passive: involucro edilizio performante per tutti gli edifici, pavimentazioni drenanti e importante presenza di vegetazione per mitigare le isole di calore. “INSPORT” sarà un complesso accessibile ed inclusivo che ospiterà attività sportive adatte a differenti fasce di età e di livelli competitivi, e risulterà il centro di aggregazione sociale moderno finora mancante nel quartiere.

INSPORT: centro sportivo multidisciplinare realizzato recuperando l'ex area industriale ABB-Sace (BG)

Breno, Laura
2023/2024

Abstract

INSPORT” is an urban recovery project involving the former ABB-Sace industrial area, that used to be in the outskirts but now it has been fully integrated into the residential area of Bergamo city. The site rests in strategic location, as it develops along Baioni Street – an arterial road connecting the city with the Brembana valley – and it is very close to Bergamo's ring road.The project aims at breathing new life into the existing derelict building – the factory was abandoned in 2014 – through the construction of a multidisciplinary sports center consisting of a sports hall, a swimming pool and services designed to foster the neighborhood’s social life that is currently quite poor.The “INSPORT” project brings together the restored and the new buildings through integrated facilities where all functions connect in space or communicate visually with one another and the neighborhood. The main driver in the design was to open the former factory site towards the neighborhood, as presently it is enclosed by an impenetrable opaque fence, and to build a permeable construction with easily accessible indoor and outdoor facilities characterized by extensive green areas and dedicated to community gathering and sports. Permeability is emphasized by an internal pathway, which both separates and unites the two sports areas, and extends outward with the same paving.My dissertation starts by analyzing the relevant urban aspects required to identify the construction’s main function. In addition, I carried out a survey of the building’s current state of preservation paying particular attention to elements with historical value, to define the main recovery interventions.Data collected on the site’s status were added to data from meta-design, which required the analysis of key stakeholders’ objectives and alternatives, and participatory design, to enable an information-based approach to the project.The analysis of user flows led me to create two different main drawings for the opposite sides of the facility. In fact the south-facing area entailed the recovery of the previous building, whereas the north-facing facilities were to be newly built. The north-facing site design echoes the restored construction’s modularity and the intervals between openings, and it is characterized by an extensive use of glass allowing to look inside.To minimize the building's energy consumption, the project includes several passive energy saving strategies, such as high-performance insulating envelopes for both the recovered and new buildings, draining pavements to mitigate the heat island effect, and vegetation playing a crucial role.A key aspect of the “INSPORT” project is related to inclusivity. The structure will host a wide range of sports for different age groups and competitive levels. It will be accessible also for children, athletes with disabilities, and residents will finally be able to enjoy a modern community center in their neighborhood.
SPECIALE , FERNANDA
ARC I - Scuola di Architettura Urbanistica Ingegneria delle Costruzioni
9-ott-2024
2023/2024
“INSPORT” propone una soluzione per il recupero dell’area industriale ex ABB-Sace, un tempo periferica ed oggi integrata nel centro residenziale di Bergamo. L’area si trova in un punto strategico, affacciata su via Baioni, arteria che collega la città con la Valle Brembana, ed è in prossimità della circonvallazione esterna. Il progetto ridà vita al vuoto urbano creato dall’abbandono della fabbrica nel 2014 tramite la costruzione di un centro sportivo multidisciplinare con palazzetto, piscina e servizi per realizzare un luogo di socializzazione del quartiere colmandone l’attuale mancanza. “INSPORT” mette in relazione spaziale e visiva gli edifici recuperati con quelli di nuova costruzione realizzando un complesso integrato nel contesto. L’idea guida del progetto è l’apertura della ex-fabbrica, oggi chiusa da un impenetrabile recinto opaco, verso il contesto per costituire un edificio fruibile negli spazi coperti e nelle nuove aree esterne, caratterizzate dal verde, dedicate a sport e socialità. La permeabilità è sottolineata dal percorso interno, che separa ed al contempo unisce le funzioni sportive, prolungato verso l’esterno da una pavimentazione che ne evidenzia lo scopo. Il processo di tesi parte dall’analisi degli aspetti urbanistici per definire la funzione principale e dal rilievo dello stato di conservazione del manufatto, con particolare attenzione a dove risiede la memoria storica, per definire gli interventi di recupero principali. I dati dello stato di fatto, integrati dalla metaprogettazione, comprendente l’analisi degli obiettivi degli stakeholders e la progettazione partecipata, hanno consentito di approcciare il progetto in modo consapevole. Gli edifici destinati alle funzioni sportive sono stati oggetto di analisi strutturale ponendo attenzione al predimensionamento delle travi reticolari in acciaio che coprono la grande luce di 38 m richiesta. L’analisi dei flussi di utenza porta a realizzare due prospetti principali opposti: a sud, caratterizzato dal recupero ed a nord, il nuovo, che riprende la modularità di quello recuperato ed è caratterizzato dall’uso di vetro per permettere la visibilità verso l’interno. Per ridurre al minimo il fabbisogno energetico il progetto integra strategie passive: involucro edilizio performante per tutti gli edifici, pavimentazioni drenanti e importante presenza di vegetazione per mitigare le isole di calore. “INSPORT” sarà un complesso accessibile ed inclusivo che ospiterà attività sportive adatte a differenti fasce di età e di livelli competitivi, e risulterà il centro di aggregazione sociale moderno finora mancante nel quartiere.
File allegati
File Dimensione Formato  
2024_09_Breno_01_relazione INSPORT.pdf

accessibile in internet per tutti

Descrizione: Realazione di tesi
Dimensione 17.88 MB
Formato Adobe PDF
17.88 MB Adobe PDF Visualizza/Apri
2024_09_Breno_02_analisi urbanistiche e stato di fatto.pdf

accessibile in internet per tutti

Descrizione: Elaborati grafici relativi alle analisi urbanistiche e al rilievo dello stato di fatto
Dimensione 375.96 MB
Formato Adobe PDF
375.96 MB Adobe PDF Visualizza/Apri
2024_09_Breno_03_progetto architettonico.pdf

accessibile in internet per tutti

Descrizione: Elaborati grafici relativi al progetto architettonico
Dimensione 241.45 MB
Formato Adobe PDF
241.45 MB Adobe PDF Visualizza/Apri
2024_09_Breno_04_progetto tecnico.pdf

accessibile in internet per tutti

Descrizione: Elaborati grafici relativi al progetto tecnico
Dimensione 84.37 MB
Formato Adobe PDF
84.37 MB Adobe PDF Visualizza/Apri
2024_09_Breno_05_allegati.pdf

accessibile in internet per tutti

Descrizione: Allegati
Dimensione 7.22 MB
Formato Adobe PDF
7.22 MB Adobe PDF Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/227114