Constructing a large-scale hospital involves significant coordination between stakeholders, disciplines, and documentation frameworks. Effective management of documents is crucial to ensure that design intentions, technical specifications, and construction instructions can be communicated clearly and on time. Document breakdowns in the construction process often result in uncoordinated work, rework, delays, and budget overruns. This thesis examines request for information (RFI), and document control issues founded by two general contractors and the trade partners across three healthcare projects in the United States each over $300 million, to assess documentation bottlenecks and breakdowns. For this study, the RFI and documents that had been classified were coded and analyzed using a structed RFI classification and issue classification cross frameworks to assess the scope and magnitude of patterns, project phases, and gap variables for relative comparison. Annually, nearly 31 billion USD is spent in rework due to inaccurate or inaccessible information in construction (Trimble Inc., 2025). Addressing this issue begins with identifying the major causes of workflow information breakdowns during phases transition, or in critical coordination points such as mechanical-electrical-plumbing. Key categories of issues were identified, including missing information, version, and revision control, naming and index inconsistencies, among others. Subsequently, quantitative, and qualitative analysis were conducted, and temporal and cross-project comparisons showed consistent bottlenecks around milestones/revisions and model handover, highlighting the information management challenges despite the different general contractors and trades involve in each project. This study contributes empirical evidence on when and where documentation breakdowns are most frequent and give insights on how effective document control practices and knowledge management may mitigate these disruptions. Recommendations include standardization, implementing clear workflows of information es and early coordination protocols including metadata practices from the earliest stages of projects and real time validation in later phases.

Costruire un ospedale su larga scala comporta una significativa coordinazione tra le parti interessate, le discipline e i quadri documentali. Una gestione efficace dei documenti è cruciale per garantire che le intenzioni di design, le specifiche tecniche e le istruzioni di costruzione possano essere comunicate in modo chiaro e tempestivo. Le interruzioni documentali nel processo di costruzione spesso risultano in lavori non coordinati, rifacimenti, ritardi e sforamenti di budget. Questa tesi esamina le richieste di informazioni (RFI) e i problemi di controllo dei documenti riscontrati da due appaltatori generali e dai partner commerciali in tre progetti sanitari negli Stati Uniti, ciascuno superiore ai 300 milioni di dollari, per valutare i colli di bottiglia e i guasti nella documentazione. Per questo studio, le RFI e i documenti che erano stati classificati sono stati codificati e analizzati utilizzando un quadro strutturato di classificazione delle RFI e di classificazione delle problematiche per valutare l'ambito e l'entità dei modelli, delle fasi del progetto e delle variabili di gap per un confronto relativo. Annualmente, quasi 31 miliardi di dollari vengono spesi in rifacimenti a causa di informazioni inaccurate o inaccessibili nel settore delle costruzioni (Trimble Inc., 2025). Affrontare questo problema inizia con l'identificazione delle principali cause delle interruzioni delle informazioni di flusso di lavoro durante le transizioni delle fasi, o nei punti di coordinamento critici come meccanico-elettrico-idraulico. Sono state identificate categorie chiave di problemi, tra cui informazioni mancanti, controllo delle versioni e delle revisioni, incoerenze nei nomi e negli indici, tra gli altri. Successivamente, sono state condotte analisi quantitative e qualitative, e i confronti temporali e tra progetti hanno mostrato colli di bottiglia costanti intorno ai traguardi/revisioni e al passaggio dei modelli, evidenziando le sfide nella gestione delle informazioni nonostante i diversi appaltatori generali e mestieri coinvolti in ciascun progetto. Questo studio contribuisce con prove empiriche su quando e dove i guasti nella documentazione sono più frequenti e fornisce indicazioni su come pratiche efficaci di controllo dei documenti e gestione della conoscenza possano mitigare queste interruzioni. Le raccomandazioni includono la standardizzazione, l'implementazione di flussi di lavoro chiari delle informazioni e protocolli di coordinamento precoce che includano pratiche di metadati fin dalle prime fasi dei progetti e la validazione in tempo reale nelle fasi successive.

Information breakdowns and coordination challenges in hospital construction: a data-driven analysis of RFIs and document management

LONDOÑO VERA, DANIEL ALFONSO
2024/2025

Abstract

Constructing a large-scale hospital involves significant coordination between stakeholders, disciplines, and documentation frameworks. Effective management of documents is crucial to ensure that design intentions, technical specifications, and construction instructions can be communicated clearly and on time. Document breakdowns in the construction process often result in uncoordinated work, rework, delays, and budget overruns. This thesis examines request for information (RFI), and document control issues founded by two general contractors and the trade partners across three healthcare projects in the United States each over $300 million, to assess documentation bottlenecks and breakdowns. For this study, the RFI and documents that had been classified were coded and analyzed using a structed RFI classification and issue classification cross frameworks to assess the scope and magnitude of patterns, project phases, and gap variables for relative comparison. Annually, nearly 31 billion USD is spent in rework due to inaccurate or inaccessible information in construction (Trimble Inc., 2025). Addressing this issue begins with identifying the major causes of workflow information breakdowns during phases transition, or in critical coordination points such as mechanical-electrical-plumbing. Key categories of issues were identified, including missing information, version, and revision control, naming and index inconsistencies, among others. Subsequently, quantitative, and qualitative analysis were conducted, and temporal and cross-project comparisons showed consistent bottlenecks around milestones/revisions and model handover, highlighting the information management challenges despite the different general contractors and trades involve in each project. This study contributes empirical evidence on when and where documentation breakdowns are most frequent and give insights on how effective document control practices and knowledge management may mitigate these disruptions. Recommendations include standardization, implementing clear workflows of information es and early coordination protocols including metadata practices from the earliest stages of projects and real time validation in later phases.
ING - Scuola di Ingegneria Industriale e dell'Informazione
26-mar-2026
2024/2025
Costruire un ospedale su larga scala comporta una significativa coordinazione tra le parti interessate, le discipline e i quadri documentali. Una gestione efficace dei documenti è cruciale per garantire che le intenzioni di design, le specifiche tecniche e le istruzioni di costruzione possano essere comunicate in modo chiaro e tempestivo. Le interruzioni documentali nel processo di costruzione spesso risultano in lavori non coordinati, rifacimenti, ritardi e sforamenti di budget. Questa tesi esamina le richieste di informazioni (RFI) e i problemi di controllo dei documenti riscontrati da due appaltatori generali e dai partner commerciali in tre progetti sanitari negli Stati Uniti, ciascuno superiore ai 300 milioni di dollari, per valutare i colli di bottiglia e i guasti nella documentazione. Per questo studio, le RFI e i documenti che erano stati classificati sono stati codificati e analizzati utilizzando un quadro strutturato di classificazione delle RFI e di classificazione delle problematiche per valutare l'ambito e l'entità dei modelli, delle fasi del progetto e delle variabili di gap per un confronto relativo. Annualmente, quasi 31 miliardi di dollari vengono spesi in rifacimenti a causa di informazioni inaccurate o inaccessibili nel settore delle costruzioni (Trimble Inc., 2025). Affrontare questo problema inizia con l'identificazione delle principali cause delle interruzioni delle informazioni di flusso di lavoro durante le transizioni delle fasi, o nei punti di coordinamento critici come meccanico-elettrico-idraulico. Sono state identificate categorie chiave di problemi, tra cui informazioni mancanti, controllo delle versioni e delle revisioni, incoerenze nei nomi e negli indici, tra gli altri. Successivamente, sono state condotte analisi quantitative e qualitative, e i confronti temporali e tra progetti hanno mostrato colli di bottiglia costanti intorno ai traguardi/revisioni e al passaggio dei modelli, evidenziando le sfide nella gestione delle informazioni nonostante i diversi appaltatori generali e mestieri coinvolti in ciascun progetto. Questo studio contribuisce con prove empiriche su quando e dove i guasti nella documentazione sono più frequenti e fornisce indicazioni su come pratiche efficaci di controllo dei documenti e gestione della conoscenza possano mitigare queste interruzioni. Le raccomandazioni includono la standardizzazione, l'implementazione di flussi di lavoro chiari delle informazioni e protocolli di coordinamento precoce che includano pratiche di metadati fin dalle prime fasi dei progetti e la validazione in tempo reale nelle fasi successive.
File allegati
File Dimensione Formato  
2026_03_Londono_Project A - Specification Log_04.pdf

non accessibile

Descrizione: Project A - Specifications Log
Dimensione 60.16 kB
Formato Adobe PDF
60.16 kB Adobe PDF   Visualizza/Apri
2026_03_Londono_Project A - RFI Log_03.pdf

non accessibile

Descrizione: Project A - RFI Log
Dimensione 259.96 kB
Formato Adobe PDF
259.96 kB Adobe PDF   Visualizza/Apri
2026_03_Londono_Project A - Drawings Log_02.pdf

non accessibile

Descrizione: Project A - Drawing Log
Dimensione 196.12 kB
Formato Adobe PDF
196.12 kB Adobe PDF   Visualizza/Apri
2026_03_Londono_Project B - RFI Log_06.pdf

non accessibile

Descrizione: Project B - RFI Log
Dimensione 107.52 kB
Formato Adobe PDF
107.52 kB Adobe PDF   Visualizza/Apri
2026_03_Londono_Project B - Specifications Log_07.pdf

non accessibile

Descrizione: Project B - Specifications Log
Dimensione 80.93 kB
Formato Adobe PDF
80.93 kB Adobe PDF   Visualizza/Apri
2026_03_Londono_Project B - Drawings Log_05.pdf

non accessibile

Descrizione: Project B - Drawings Log
Dimensione 164.31 kB
Formato Adobe PDF
164.31 kB Adobe PDF   Visualizza/Apri
2026_03_Londono_Project C - Specifications Log_10.pdf

non accessibile

Descrizione: Project C - Specifications Log
Dimensione 44.07 kB
Formato Adobe PDF
44.07 kB Adobe PDF   Visualizza/Apri
2026_03_Londono_Project C - RFI Log_09.pdf

non accessibile

Descrizione: Project C - RFI Log
Dimensione 207.02 kB
Formato Adobe PDF
207.02 kB Adobe PDF   Visualizza/Apri
2026_03_Londono_Project C - Drawings Log_08.pdf

non accessibile

Descrizione: Project C - Drawing Log
Dimensione 86.52 kB
Formato Adobe PDF
86.52 kB Adobe PDF   Visualizza/Apri
2026_03_Londono_Thesis_01.pdf

accessibile in internet per tutti

Descrizione: Thesis
Dimensione 778.77 kB
Formato Adobe PDF
778.77 kB Adobe PDF Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/253602