The Venice lagoon is one of the most complex and vulnerable transitional ecosystems in the world, and it is increasingly exposed to the phenomenon of high water ("acqua alta") as a result of the rising mean level of the Adriatic Sea. To address this threat, the Mo.S.E. System was built, a hydraulic infrastructure that allows the lagoon to be temporarily separated from the sea through mobile barriers at the port inlets of Lido, Malamocco, and Chioggia. It became operational in October 2020, twenty-two years after the 1998 Environmental Impact Assessment procedure, whose negative outcome fueled a long technical-scientific and political debate that continues to this day. This thesis aims to fill a knowledge gap that remains open: to date, no systematic study exists comparing the predictions of the 1998 Environmental Impact Assessment Study (EIA) with the impacts actually observed in the lagoon's main environmental compartments during the construction phase and the first years of operation. Drawing on monitoring data collected by ISPRA, CORILA, Consorzio Venezia Nuova, and ARPAV, the research analyzes the following components: lagoon hydrodynamics, water quality, vegetation and aquatic flora, aquatic flora and terrestrial fauna. The results show that, for the construction phase, nearly all of the components analyzed exhibited impacts of a magnitude consistent with the EIA's predictions. On the hydrodynamic front, the closing of the barriers produced an effective reduction in events exceeding the +100 cm ZMPS threshold within the lagoon as early as the first operating season, with negligible changes in tidal propagation times. For water quality, the impacts observed for turbidity and dissolved oxygen were in line with the estimates, while for zinc and dissolved organic carbon, gaps in the data did not allow for a robust statistical analysis. Exceptions are seagrasses (marine phanerogams), whose coverage increased significantly more than expected, attributable to the mitigation measures under the so-called "Piano Europa," and the avifauna component, whose impact during the construction phase proved more pronounced than predicted. For the operational phase, analysis of the first four years presents an overall positive picture, with impacts remaining limited under current barrier-use conditions. However, the brevity of the observation period relative to the structure's design lifespan, set at 2100, calls for caution in interpreting the results, particularly in the context of climate change. The study also highlights the persistent inadequacy of the available environmental monitoring systems: the temporal and spatial discontinuity of the data undermines the statistical robustness of some analyses and introduces potential biases into the estimates. Looking ahead, the intensification of extreme events expected as a result of climate change could require more frequent and prolonged use of the barriers, with potentially significant consequences, not yet fully assessable, for the lagoon's hydrodynamic and ecological processes, as well as for port activities.

La laguna di Venezia è uno degli ecosistemi di transizione più complessi e vulnerabili al mondo, è esposta in modo crescente al fenomeno dell'acqua alta per effetto dell'innalzamento del livello medio del mare Adriatico. Per far fronte a questa minaccia è stato realizzato il Sistema Mo.S.E., un'infrastruttura idraulica che consente la separazione temporanea della laguna dal mare attraverso barriere mobili alle bocche di porto di Lido, Malamocco e Chioggia, entrata in esercizio nell'ottobre 2020 a ventidue anni dalla procedura di Valutazione di Impatto Ambientale del 1998, il cui esito negativo ha alimentato un lungo dibattito tecnico-scientifico e politico che si protrae ancora oggi. La presente tesi si propone di colmare un divario conoscitivo ancora aperto: a tutt'oggi non esiste uno studio sistematico che confronti le previsioni dello Studio di Impatto Ambientale del 1998 con gli impatti effettivamente rilevati nelle principali matrici ambientali della laguna durante la fase di costruzione e i primi anni di esercizio. A partire da dati di monitoraggio raccolti da ISPRA, CORILA, Consorzio Venezia Nuova e ARPAV, la ricerca analizza le seguenti componenti: idrodinamica della laguna, qualità delle acque, vegetazione e flora acquatica, flora acquatica e fauna terrestre. I risultati mostrano che, per la fase di costruzione, la quasi totalità delle componenti analizzate ha evidenziato impatti di magnitudo coerente con le previsioni del SIA. Sul fronte idrodinamico, le chiusure delle barriere hanno prodotto una riduzione efficace degli eventi di superamento della soglia dei +100 cm ZMPS all'interno della laguna già dalla prima stagione di esercizio, con variazioni dei tempi di propagazione della marea di entità trascurabile. Per la qualità delle acque, gli impatti rilevati per torbidità e ossigeno disciolto risultano allineati alle stime, mentre per zinco e carbonio organico disciolto la lacunosità dei dati non ha consentito un'analisi statistica robusta. Fanno eccezione le fanerogame marine, la cui copertura ha registrato un incremento significativamente superiore alle attese, attribuibile alle azioni di mitigazioni appartenenti al cosiddetto Piano Europa, e la matrice dell’avifauna, il cui impatto in fase di cantiere si è rivelato più marcato rispetto a quanto previsto. Per la fase di esercizio, l'analisi dei primi quattro anni restituisce un quadro complessivamente positivo, con impatti contenuti nelle condizioni attuali di utilizzo delle barriere. Tuttavia, la brevità del periodo osservato rispetto all'orizzonte di vita dell'opera fissato al 2100 impone cautela nell'interpretazione dei risultati, in particolare in un contesto di cambiamento climatico. Lo studio evidenzia inoltre la persistente insufficienza dei sistemi di monitoraggio ambientale disponibili: la discontinuità temporale e spaziale dei dati compromette la robustezza statistica di alcune analisi e introduce potenziali bias nelle stime. In prospettiva, l'intensificarsi degli eventi estremi atteso per effetto dei cambiamenti climatici potrebbe richiedere un utilizzo delle barriere più frequente e prolungato, con ricadute potenzialmente significative sui processi idrodinamici ed ecologici lagunari ancora non pienamente valutabili e sulle attività portuali.

Il Sistema Mo.S.E. e la Laguna di Venezia: confronto tra le stime di impatto ante-operam e gli impatti verificati attraverso il monitoraggio post-operam

Zanetti, Mario
2025/2026

Abstract

The Venice lagoon is one of the most complex and vulnerable transitional ecosystems in the world, and it is increasingly exposed to the phenomenon of high water ("acqua alta") as a result of the rising mean level of the Adriatic Sea. To address this threat, the Mo.S.E. System was built, a hydraulic infrastructure that allows the lagoon to be temporarily separated from the sea through mobile barriers at the port inlets of Lido, Malamocco, and Chioggia. It became operational in October 2020, twenty-two years after the 1998 Environmental Impact Assessment procedure, whose negative outcome fueled a long technical-scientific and political debate that continues to this day. This thesis aims to fill a knowledge gap that remains open: to date, no systematic study exists comparing the predictions of the 1998 Environmental Impact Assessment Study (EIA) with the impacts actually observed in the lagoon's main environmental compartments during the construction phase and the first years of operation. Drawing on monitoring data collected by ISPRA, CORILA, Consorzio Venezia Nuova, and ARPAV, the research analyzes the following components: lagoon hydrodynamics, water quality, vegetation and aquatic flora, aquatic flora and terrestrial fauna. The results show that, for the construction phase, nearly all of the components analyzed exhibited impacts of a magnitude consistent with the EIA's predictions. On the hydrodynamic front, the closing of the barriers produced an effective reduction in events exceeding the +100 cm ZMPS threshold within the lagoon as early as the first operating season, with negligible changes in tidal propagation times. For water quality, the impacts observed for turbidity and dissolved oxygen were in line with the estimates, while for zinc and dissolved organic carbon, gaps in the data did not allow for a robust statistical analysis. Exceptions are seagrasses (marine phanerogams), whose coverage increased significantly more than expected, attributable to the mitigation measures under the so-called "Piano Europa," and the avifauna component, whose impact during the construction phase proved more pronounced than predicted. For the operational phase, analysis of the first four years presents an overall positive picture, with impacts remaining limited under current barrier-use conditions. However, the brevity of the observation period relative to the structure's design lifespan, set at 2100, calls for caution in interpreting the results, particularly in the context of climate change. The study also highlights the persistent inadequacy of the available environmental monitoring systems: the temporal and spatial discontinuity of the data undermines the statistical robustness of some analyses and introduces potential biases into the estimates. Looking ahead, the intensification of extreme events expected as a result of climate change could require more frequent and prolonged use of the barriers, with potentially significant consequences, not yet fully assessable, for the lagoon's hydrodynamic and ecological processes, as well as for port activities.
ING I - Scuola di Ingegneria Civile, Ambientale e Territoriale
22-lug-2026
2025/2026
La laguna di Venezia è uno degli ecosistemi di transizione più complessi e vulnerabili al mondo, è esposta in modo crescente al fenomeno dell'acqua alta per effetto dell'innalzamento del livello medio del mare Adriatico. Per far fronte a questa minaccia è stato realizzato il Sistema Mo.S.E., un'infrastruttura idraulica che consente la separazione temporanea della laguna dal mare attraverso barriere mobili alle bocche di porto di Lido, Malamocco e Chioggia, entrata in esercizio nell'ottobre 2020 a ventidue anni dalla procedura di Valutazione di Impatto Ambientale del 1998, il cui esito negativo ha alimentato un lungo dibattito tecnico-scientifico e politico che si protrae ancora oggi. La presente tesi si propone di colmare un divario conoscitivo ancora aperto: a tutt'oggi non esiste uno studio sistematico che confronti le previsioni dello Studio di Impatto Ambientale del 1998 con gli impatti effettivamente rilevati nelle principali matrici ambientali della laguna durante la fase di costruzione e i primi anni di esercizio. A partire da dati di monitoraggio raccolti da ISPRA, CORILA, Consorzio Venezia Nuova e ARPAV, la ricerca analizza le seguenti componenti: idrodinamica della laguna, qualità delle acque, vegetazione e flora acquatica, flora acquatica e fauna terrestre. I risultati mostrano che, per la fase di costruzione, la quasi totalità delle componenti analizzate ha evidenziato impatti di magnitudo coerente con le previsioni del SIA. Sul fronte idrodinamico, le chiusure delle barriere hanno prodotto una riduzione efficace degli eventi di superamento della soglia dei +100 cm ZMPS all'interno della laguna già dalla prima stagione di esercizio, con variazioni dei tempi di propagazione della marea di entità trascurabile. Per la qualità delle acque, gli impatti rilevati per torbidità e ossigeno disciolto risultano allineati alle stime, mentre per zinco e carbonio organico disciolto la lacunosità dei dati non ha consentito un'analisi statistica robusta. Fanno eccezione le fanerogame marine, la cui copertura ha registrato un incremento significativamente superiore alle attese, attribuibile alle azioni di mitigazioni appartenenti al cosiddetto Piano Europa, e la matrice dell’avifauna, il cui impatto in fase di cantiere si è rivelato più marcato rispetto a quanto previsto. Per la fase di esercizio, l'analisi dei primi quattro anni restituisce un quadro complessivamente positivo, con impatti contenuti nelle condizioni attuali di utilizzo delle barriere. Tuttavia, la brevità del periodo osservato rispetto all'orizzonte di vita dell'opera fissato al 2100 impone cautela nell'interpretazione dei risultati, in particolare in un contesto di cambiamento climatico. Lo studio evidenzia inoltre la persistente insufficienza dei sistemi di monitoraggio ambientale disponibili: la discontinuità temporale e spaziale dei dati compromette la robustezza statistica di alcune analisi e introduce potenziali bias nelle stime. In prospettiva, l'intensificarsi degli eventi estremi atteso per effetto dei cambiamenti climatici potrebbe richiedere un utilizzo delle barriere più frequente e prolungato, con ricadute potenzialmente significative sui processi idrodinamici ed ecologici lagunari ancora non pienamente valutabili e sulle attività portuali.
File allegati
File Dimensione Formato  
tesi Mario Zanetti 279945 - SIA del Sistema Mo.S.E..pdf

accessibile in internet per tutti

Descrizione: Analisi comparativa tra gli impatti stimati nello Studio di Impatto Ambientale del 1998 e i dati ambientali ottenuti dal monitoraggio da diversi enti (ISPRA, CORILA, CVN, ARPAV), con descrizione della storia approvativa dell'opera e del funzionamento delle barriere mobili
Dimensione 49.05 MB
Formato Adobe PDF
49.05 MB Adobe PDF Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/260134