The decarbonization of urban heating infrastructures represents a critical challenge for modern utilities, particularly concerning the over-reliance on fossil fuels to cover peak demands or base loads during primary generation downtimes. This thesis investigates the techno-economic feasibility of integrating a large-scale solar thermal field into the existing multi-energy district heating plant of Desio, currently powered by a Waste to Energy (WtE) facility and auxiliary gas-fired boilers. The primary scientific objective is to resolve a profound operational vulnerability: the exclusive reliance on carbon-intensive natural gas during the three-week WtE maintenance shutdown in August. The methodological approach relies on a discrete-time hourly simulation using Typical Meteorological Year (TMY) data to model the thermodynamic performance of a 2346 m² flat plate collector array (Savosolar SAVO 16S B). The system's integration is optimized through a seasonal switching hydraulic logic, operating as a pre-heating stage in winter and a primary generator in summer. The findings demonstrate that the solar array can inject approximately 756,78 MWh of renewable thermal energy annually. Crucially, the solar peak hourly thermal generation (2,90 MWh) effectively covers up to 90% of the network's summer baseload, displacing 88.512,75 Sm³ of natural gas per year and avoiding 152,87 tons of equivalent CO2 emissions. The techno-economic assessment confirms a highly structured financial viability: requiring a CAPEX of 1.400.000,00 € and supported by the national Conto Termico 2.0 incentive, the project achieves a Simple Payback Period (SPP) of 15,4 years. Furthermore, the solar Levelized Cost of Heat (LCOH) of 55,70 €/MWh is strictly lower than the equivalent gas-fired generation. Ultimately, the integration acts as the catalyst for the network to secure and confirm the regulatory title of "Efficient District Heating and Cooling" (EDHC), turning a seasonal operational weakness into a strategic, bankable asset for deep decarbonization.

La decarbonizzazione delle infrastrutture di riscaldamento urbano rappresenta una sfida cruciale per le moderne utility, in particolare per quanto riguarda l'eccessiva dipendenza dai combustibili fossili per coprire i picchi di domanda o sopperire ai carichi di base durante i fermi dei sistemi di generazione primaria. Questa tesi indaga la fattibilità tecnico economica dell'integrazione di un campo solare termico su larga scala nell'attuale impianto multi-energia di teleriscaldamento di Desio, attualmente alimentato da un termovalorizzatore (WtE) e da caldaie a gas ausiliarie. L'obiettivo scientifico primario è risolvere una profonda vulnerabilità operativa: la dipendenza esclusiva dal gas naturale durante le tre settimane di fermo manutentivo del termovalorizzatore nel mese di agosto. L'approccio metodologico si basa su una simulazione oraria a tempo discreto che utilizza i dati dell'Anno Meteorologico Tipico (TMY) per modellare le prestazioni termodinamiche di un campo di collettori piani da 2346 m² (Savosolar SAVO 16S B). L'integrazione del sistema è ottimizzata attraverso una logica idraulica di commutazione stagionale, operando come stadio di preriscaldamento in inverno e come generatore primario in estate. I risultati dimostrano che il campo solare può immettere in rete circa 756,78 MWh di energia termica rinnovabile all'anno. Fondamentalmente, la generazione termica oraria di picco (2,90 MWh) copre efficacemente fino al 90% del carico di base estivo della rete, sostituendo 88.512,75 Sm³ di gas naturale all'anno ed evitando 152,87 tonnellate di emissioni di CO2 equivalente. La valutazione tecnico-economica conferma una solidità finanziaria strutturata: a fronte di un CAPEX di 1.400.000,00 € e con il supporto dell'incentivo nazionale Conto Termico 2.0, il progetto raggiunge un Simple Payback Period (SPP) di 15,4 anni. Inoltre, il Levelized Cost of Heat (LCOH) del solare, pari a 55,70 €/MWh, risulta strettamente inferiore alla generazione equivalente a gas. In definitiva, l'integrazione funge da catalizzatore affinché la rete ottenga e mantenga il titolo normativo di "Teleriscaldamento Efficiente" (EDHC), trasformando una debolezza operativa stagionale in un asset strategico e bancabile per una profonda decarbonizzazione.

Solar thermal integration in a waste-to-energy plant: techno-economic decarbonization strategy

Cappannoli, Edoardo
2025/2026

Abstract

The decarbonization of urban heating infrastructures represents a critical challenge for modern utilities, particularly concerning the over-reliance on fossil fuels to cover peak demands or base loads during primary generation downtimes. This thesis investigates the techno-economic feasibility of integrating a large-scale solar thermal field into the existing multi-energy district heating plant of Desio, currently powered by a Waste to Energy (WtE) facility and auxiliary gas-fired boilers. The primary scientific objective is to resolve a profound operational vulnerability: the exclusive reliance on carbon-intensive natural gas during the three-week WtE maintenance shutdown in August. The methodological approach relies on a discrete-time hourly simulation using Typical Meteorological Year (TMY) data to model the thermodynamic performance of a 2346 m² flat plate collector array (Savosolar SAVO 16S B). The system's integration is optimized through a seasonal switching hydraulic logic, operating as a pre-heating stage in winter and a primary generator in summer. The findings demonstrate that the solar array can inject approximately 756,78 MWh of renewable thermal energy annually. Crucially, the solar peak hourly thermal generation (2,90 MWh) effectively covers up to 90% of the network's summer baseload, displacing 88.512,75 Sm³ of natural gas per year and avoiding 152,87 tons of equivalent CO2 emissions. The techno-economic assessment confirms a highly structured financial viability: requiring a CAPEX of 1.400.000,00 € and supported by the national Conto Termico 2.0 incentive, the project achieves a Simple Payback Period (SPP) of 15,4 years. Furthermore, the solar Levelized Cost of Heat (LCOH) of 55,70 €/MWh is strictly lower than the equivalent gas-fired generation. Ultimately, the integration acts as the catalyst for the network to secure and confirm the regulatory title of "Efficient District Heating and Cooling" (EDHC), turning a seasonal operational weakness into a strategic, bankable asset for deep decarbonization.
ING - Scuola di Ingegneria Industriale e dell'Informazione
22-lug-2026
2025/2026
La decarbonizzazione delle infrastrutture di riscaldamento urbano rappresenta una sfida cruciale per le moderne utility, in particolare per quanto riguarda l'eccessiva dipendenza dai combustibili fossili per coprire i picchi di domanda o sopperire ai carichi di base durante i fermi dei sistemi di generazione primaria. Questa tesi indaga la fattibilità tecnico economica dell'integrazione di un campo solare termico su larga scala nell'attuale impianto multi-energia di teleriscaldamento di Desio, attualmente alimentato da un termovalorizzatore (WtE) e da caldaie a gas ausiliarie. L'obiettivo scientifico primario è risolvere una profonda vulnerabilità operativa: la dipendenza esclusiva dal gas naturale durante le tre settimane di fermo manutentivo del termovalorizzatore nel mese di agosto. L'approccio metodologico si basa su una simulazione oraria a tempo discreto che utilizza i dati dell'Anno Meteorologico Tipico (TMY) per modellare le prestazioni termodinamiche di un campo di collettori piani da 2346 m² (Savosolar SAVO 16S B). L'integrazione del sistema è ottimizzata attraverso una logica idraulica di commutazione stagionale, operando come stadio di preriscaldamento in inverno e come generatore primario in estate. I risultati dimostrano che il campo solare può immettere in rete circa 756,78 MWh di energia termica rinnovabile all'anno. Fondamentalmente, la generazione termica oraria di picco (2,90 MWh) copre efficacemente fino al 90% del carico di base estivo della rete, sostituendo 88.512,75 Sm³ di gas naturale all'anno ed evitando 152,87 tonnellate di emissioni di CO2 equivalente. La valutazione tecnico-economica conferma una solidità finanziaria strutturata: a fronte di un CAPEX di 1.400.000,00 € e con il supporto dell'incentivo nazionale Conto Termico 2.0, il progetto raggiunge un Simple Payback Period (SPP) di 15,4 anni. Inoltre, il Levelized Cost of Heat (LCOH) del solare, pari a 55,70 €/MWh, risulta strettamente inferiore alla generazione equivalente a gas. In definitiva, l'integrazione funge da catalizzatore affinché la rete ottenga e mantenga il titolo normativo di "Teleriscaldamento Efficiente" (EDHC), trasformando una debolezza operativa stagionale in un asset strategico e bancabile per una profonda decarbonizzazione.
File allegati
File Dimensione Formato  
2026_07_Cappannoli.pdf

accessibile in internet per tutti

Descrizione: testo tesi
Dimensione 2.55 MB
Formato Adobe PDF
2.55 MB Adobe PDF Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/260462