The European energy transition, accelerated by the Green Deal, the Fit for 55 package and the REPowerEU plan, is profoundly transforming the electricity system, driving an increasing integration of non-programmable renewable sources and an extensive digitalization of distribution networks. In this context, advanced metering and control devices play a central role in ensuring observability, flexibility and operational security. This thesis analyses the regulatory and technological evolution of monitoring systems in the Italian distribution grid, with particular focus on the Central Plant Controller – Controllore Centrale di Impianto, CCI – introduced by grid operators to support the Italian Reduction of Distributed Generation procedure – Riduzione della Generazione Distribuita, RiGeDi – and to enable new metering and control functionalities. The work examines the entire process of electrical data acquisition, from the physical phenomenon to digitalization, as well as the communication and synchronization technologies that ensure data reliability. An empirical study is also carried out, based on the comparison between the measurements acquired by the CCI installed at the Politecnico di Milano and the official data provided by the Distribution System Operator, DSO. This is a single site case study whose results cannot be generalized to the entire fleet of installations, yet they remain indicative of measurement dynamics and of the critical issues that may arise in real systems. To analyse the differences between the two signals more rigorously, an optimization procedure was developed to minimize the mean absolute error by estimating the temporal misalignment between the series and assessing the impact of both sampling and instrumental errors. The application of this procedure shows that higher informational granularity significantly improves the coherence between the two systems and enables a correct interpretation of the observed discrepancies. Finally, the thesis explores future perspectives related to submetering and to the Low Voltage Plant Controller – Controllore di Impianto di Bassa Tensione, CIBT – outlining the potential contribution of distributed resources to flexibility services and grid security. Overall, the work provides a comprehensive and integrated view of the role of advanced metering and control systems in the modernization of the Italian electricity network.

La transizione energetica europea, accelerata dal Green Deal, dal pacchetto Fit for 55 e dal piano REPowerEU, sta trasformando profondamente il sistema elettrico, favorendo una crescente integrazione di fonti rinnovabili non programmabili e una vasta digitalizzazione delle reti di distribuzione. In questo contesto, i dispositivi avanzati di misura e controllo svolgono un ruolo centrale nel garantire osservabilità, flessibilità e sicurezza operativa. Questa tesi analizza l’evoluzione normativa e tecnologica dei sistemi di monitoraggio nella rete di distribuzione italiana, con particolare attenzione al Controllore Centrale di Impianto, CCI, introdotto dagli operatori di rete per supportare la procedura di Riduzione della Generazione Distribuita, RiGeDi, e per abilitare nuove funzionalità di misura e controllo. Il lavoro esamina l’intero processo di acquisizione del dato elettrico, dal fenomeno fisico alla digitalizzazione, nonché le tecnologie di comunicazione e sincronizzazione che garantiscono l’affidabilità del dato. Viene inoltre condotto uno studio empirico, basato sul confronto tra le misure acquisite dal CCI installato presso il Politecnico di Milano e i dati ufficiali forniti dal Distribution System Operator, DSO. Si tratta di un caso di studio su una singola utenza, i cui risultati non possono essere generalizzati per tutti gli impianti; essi rimangono tuttavia indicativi delle dinamiche di misura e delle criticità che possono emergere nei sistemi reali. Per analizzare in modo più rigoroso le differenze tra i due segnali, è stata sviluppata una procedura di ottimizzazione volta a minimizzare l’errore medio assoluto stimando il disallineamento temporale tra le serie e valutando l’impatto sia del campionamento sia degli errori strumentali. L’applicazione di tale procedura mostra che una maggiore granularità informativa migliora significativamente la coerenza tra i due sistemi e consente una corretta interpretazione delle discrepanze osservate. Infine, la tesi esplora le prospettive future legate al submetering e al Controllore di Impianto di Bassa Tensione, CIBT, delineando il potenziale contributo delle risorse distribuite ai servizi di flessibilità e alla sicurezza della rete. Complessivamente, il lavoro fornisce una visione completa e integrata del ruolo dei sistemi avanzati di misura e controllo nella modernizzazione della rete elettrica italiana.

Advanced metering and control devices in the Italian distribution grid : regulatory framework, data analysis and future applications

Paleari, Sergio
2025/2026

Abstract

The European energy transition, accelerated by the Green Deal, the Fit for 55 package and the REPowerEU plan, is profoundly transforming the electricity system, driving an increasing integration of non-programmable renewable sources and an extensive digitalization of distribution networks. In this context, advanced metering and control devices play a central role in ensuring observability, flexibility and operational security. This thesis analyses the regulatory and technological evolution of monitoring systems in the Italian distribution grid, with particular focus on the Central Plant Controller – Controllore Centrale di Impianto, CCI – introduced by grid operators to support the Italian Reduction of Distributed Generation procedure – Riduzione della Generazione Distribuita, RiGeDi – and to enable new metering and control functionalities. The work examines the entire process of electrical data acquisition, from the physical phenomenon to digitalization, as well as the communication and synchronization technologies that ensure data reliability. An empirical study is also carried out, based on the comparison between the measurements acquired by the CCI installed at the Politecnico di Milano and the official data provided by the Distribution System Operator, DSO. This is a single site case study whose results cannot be generalized to the entire fleet of installations, yet they remain indicative of measurement dynamics and of the critical issues that may arise in real systems. To analyse the differences between the two signals more rigorously, an optimization procedure was developed to minimize the mean absolute error by estimating the temporal misalignment between the series and assessing the impact of both sampling and instrumental errors. The application of this procedure shows that higher informational granularity significantly improves the coherence between the two systems and enables a correct interpretation of the observed discrepancies. Finally, the thesis explores future perspectives related to submetering and to the Low Voltage Plant Controller – Controllore di Impianto di Bassa Tensione, CIBT – outlining the potential contribution of distributed resources to flexibility services and grid security. Overall, the work provides a comprehensive and integrated view of the role of advanced metering and control systems in the modernization of the Italian electricity network.
ING - Scuola di Ingegneria Industriale e dell'Informazione
22-lug-2026
2025/2026
La transizione energetica europea, accelerata dal Green Deal, dal pacchetto Fit for 55 e dal piano REPowerEU, sta trasformando profondamente il sistema elettrico, favorendo una crescente integrazione di fonti rinnovabili non programmabili e una vasta digitalizzazione delle reti di distribuzione. In questo contesto, i dispositivi avanzati di misura e controllo svolgono un ruolo centrale nel garantire osservabilità, flessibilità e sicurezza operativa. Questa tesi analizza l’evoluzione normativa e tecnologica dei sistemi di monitoraggio nella rete di distribuzione italiana, con particolare attenzione al Controllore Centrale di Impianto, CCI, introdotto dagli operatori di rete per supportare la procedura di Riduzione della Generazione Distribuita, RiGeDi, e per abilitare nuove funzionalità di misura e controllo. Il lavoro esamina l’intero processo di acquisizione del dato elettrico, dal fenomeno fisico alla digitalizzazione, nonché le tecnologie di comunicazione e sincronizzazione che garantiscono l’affidabilità del dato. Viene inoltre condotto uno studio empirico, basato sul confronto tra le misure acquisite dal CCI installato presso il Politecnico di Milano e i dati ufficiali forniti dal Distribution System Operator, DSO. Si tratta di un caso di studio su una singola utenza, i cui risultati non possono essere generalizzati per tutti gli impianti; essi rimangono tuttavia indicativi delle dinamiche di misura e delle criticità che possono emergere nei sistemi reali. Per analizzare in modo più rigoroso le differenze tra i due segnali, è stata sviluppata una procedura di ottimizzazione volta a minimizzare l’errore medio assoluto stimando il disallineamento temporale tra le serie e valutando l’impatto sia del campionamento sia degli errori strumentali. L’applicazione di tale procedura mostra che una maggiore granularità informativa migliora significativamente la coerenza tra i due sistemi e consente una corretta interpretazione delle discrepanze osservate. Infine, la tesi esplora le prospettive future legate al submetering e al Controllore di Impianto di Bassa Tensione, CIBT, delineando il potenziale contributo delle risorse distribuite ai servizi di flessibilità e alla sicurezza della rete. Complessivamente, il lavoro fornisce una visione completa e integrata del ruolo dei sistemi avanzati di misura e controllo nella modernizzazione della rete elettrica italiana.
File allegati
File Dimensione Formato  
Advanced Metering and Control Devices in the Italian Distribution Grid - Regulatory Framework, Data Analysis and Future Applications.pdf

accessibile in internet per tutti

Dimensione 6.48 MB
Formato Adobe PDF
6.48 MB Adobe PDF Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/260747