In the development of a space program many are the documents that must be delivered for every mission review: starting from phase B, when the system requirements and the preliminary design are defined, until the launch campaign in phase E when the commissioning of the satellite is done. In this work two documents related to the B2 phase of the European Student Earth Orbiter (ESEO) project are presented. The Design and Development Plan (DDP) describes with reference to the phases B2, C, D and E1 of the project life cycle the approach, the processes, the methods and facilities chosen for the overall project execution. The Assembly Integration and Verification (AIV) Plan describes integration, assembly, test organization, test description and test control during the project. The aim is a logical integration and test flow where critical aspects are analyzed early in the scheme, whereas non-critical issues are checked at a higher level to increase efficiency and eliminate redundant operations in the process.
Durante lo sviluppo di un progetto spaziale è molteplice la documentazione prodotta al fine di tenere traccia di tutti i passaggi che vanno dall’analisi preliminare della missione fino alla messa in orbita del satellite. Vi sono più fasi nel corso del processo, ciascuna caratterizzata dal raggiungimento di determinati obiettivi e dal consolidamento di alcune parti del progetto. Questa tesi presenta una parte della documentazione sviluppata nel corso della fase B2 del progetto ESEO, the European Student Earth Orbiter. La parte del Design and Development Plan (DDP) descrive a livello di sistema e per tutti i sottoelementi l’approccio, i processi, i metodi e le infrastrutture selezionati per l’esecuzione del progetto. L’Assembly Integration and Verification (AIV) Plan contiene, invece, la selezione delle porcedure di verifica e test da eseguire a tutti i livelli. La descrizione e il controllo dei test, l’assemblaggio e l’integrazione vengono al suo interno specificati affinché il flusso di lavoro sia strutturato in maniera efficiente: aspetti critici nello schema di lavoro vanno analizzati presto nel procedimento, mentre funzioni meno critiche vengono verificate solo ad alto livello per evitare operazioni ridondanti.
The ESEO Assembly Integration and Verification (AIV) Plan
NEGRINI, FILIPPO
2008/2009
Abstract
In the development of a space program many are the documents that must be delivered for every mission review: starting from phase B, when the system requirements and the preliminary design are defined, until the launch campaign in phase E when the commissioning of the satellite is done. In this work two documents related to the B2 phase of the European Student Earth Orbiter (ESEO) project are presented. The Design and Development Plan (DDP) describes with reference to the phases B2, C, D and E1 of the project life cycle the approach, the processes, the methods and facilities chosen for the overall project execution. The Assembly Integration and Verification (AIV) Plan describes integration, assembly, test organization, test description and test control during the project. The aim is a logical integration and test flow where critical aspects are analyzed early in the scheme, whereas non-critical issues are checked at a higher level to increase efficiency and eliminate redundant operations in the process.File | Dimensione | Formato | |
---|---|---|---|
Tesi720696.pdf
accessibile in internet per tutti
Descrizione: Testo della tesi
Dimensione
3.58 MB
Formato
Adobe PDF
|
3.58 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/264