As renewable energy rapidly expands, grid congestion has become a critical bottleneck. Cable pooling offers a practical solution by co-locating wind, solar photovoltaic (PV), and Battery Energy Storage Systems (BESS) behind a single shared grid connection. This thesis introduces a Mixed-Integer Linear Programming (MILP) framework to co-optimize both the hardware sizing, specifically the battery capacity and the physical cross-section of the shared underground cable, and the operational dispatch of a utility-scale hybrid plant. By integrating piecewise-linear thermal cable losses and employing K=24 stratified time-series clustering augmented with two extreme generation days, the model effectively captures high-frequency meteorological and market volatility. When applied to a comparative case study between Italy and the Netherlands, the results uncover a profound divergence in profitability between the two regulatory frameworks. In Italy's stable, high-price market, the forced physical curtailment associated with heavily congested pooling architectures severely penalizes profitability. Conversely, the extreme volatility and frequent negative prices of the Dutch market drive intentional economic curtailment. Here, the massive capital expenditure (CAPEX) savings gained from sharing infrastructure make pooling highly profitable. Ultimately, Partial Pooling, which utilizes a modestly expanded grid connection, emerges as the global economic optimum in both regions. Furthermore, the optimizer uniformly favors heavy-gauge (300 mm²) cables to heavily suppress thermal losses over the project's 30-year lifespan. Nevertheless, extensive sensitivity analyses confirm that the ultimate, decisive constraint for deploying hybrid plants is not project economics, but rather regulatory grid access.

Mentre l'energia rinnovabile si espande rapidamente, la congestione della rete è diventata un collo di bottiglia critico. Il cable pooling offre una soluzione pratica raggruppando impianti eolici, solari fotovoltaici (PV) e sistemi di accumulo a batteria (BESS) dietro un'unica connessione di rete condivisa. Questa tesi introduce un framework di Programmazione Lineare Intera Mista (MILP) per co-ottimizzare sia il dimensionamento hardware, nello specifico la capacità della batteria e la sezione trasversale del cavo sotterraneo condiviso, sia il dispacciamento operativo di un impianto ibrido su scala utility. Integrando le perdite termiche dei cavi attraverso una formulazione lineare a tratti e utilizzando un clustering di serie temporali stratificato (K=24) integrato con due giorni di generazione estrema, il modello cattura efficacemente l'alta volatilità meteorologica e di mercato. Applicati a un caso di studio comparativo tra Italia e Paesi Bassi, i risultati rivelano una profonda divergenza nella redditività tra i due quadri normativi. Nel mercato italiano, stabile e caratterizzato da prezzi elevati, il curtailment fisico forzato associato ad architetture di pooling fortemente congestionate penalizza severamente la redditività. Al contrario, l'estrema volatilità e i frequenti prezzi negativi del mercato olandese spingono verso un curtailment economico intenzionale. In questo contesto, i massicci risparmi in conto capitale (CAPEX) derivanti dalla condivisione dell'infrastruttura rendono il pooling altamente redditizio. In definitiva, il Partial Pooling, ovvero l'utilizzo di una connessione di rete modestamente ampliata, emerge come l'ottimo economico globale in entrambe le regioni. Inoltre, l'ottimizzatore favorisce uniformemente cavi di grossa sezione (300 mm²) per abbattere drasticamente le perdite termiche nell'arco dei 30 anni di vita del progetto. Ciononostante, approfondite analisi di sensibilità confermano che il vincolo finale e decisivo per l'implementazione di questi impianti ibridi non è la fattibilità economica, bensì l'accesso regolamentato alla rete.

Techno-economic optimization of cable pooling for co-located photovoltaic and wind power plants

AZIMI, NIMA
2025/2026

Abstract

As renewable energy rapidly expands, grid congestion has become a critical bottleneck. Cable pooling offers a practical solution by co-locating wind, solar photovoltaic (PV), and Battery Energy Storage Systems (BESS) behind a single shared grid connection. This thesis introduces a Mixed-Integer Linear Programming (MILP) framework to co-optimize both the hardware sizing, specifically the battery capacity and the physical cross-section of the shared underground cable, and the operational dispatch of a utility-scale hybrid plant. By integrating piecewise-linear thermal cable losses and employing K=24 stratified time-series clustering augmented with two extreme generation days, the model effectively captures high-frequency meteorological and market volatility. When applied to a comparative case study between Italy and the Netherlands, the results uncover a profound divergence in profitability between the two regulatory frameworks. In Italy's stable, high-price market, the forced physical curtailment associated with heavily congested pooling architectures severely penalizes profitability. Conversely, the extreme volatility and frequent negative prices of the Dutch market drive intentional economic curtailment. Here, the massive capital expenditure (CAPEX) savings gained from sharing infrastructure make pooling highly profitable. Ultimately, Partial Pooling, which utilizes a modestly expanded grid connection, emerges as the global economic optimum in both regions. Furthermore, the optimizer uniformly favors heavy-gauge (300 mm²) cables to heavily suppress thermal losses over the project's 30-year lifespan. Nevertheless, extensive sensitivity analyses confirm that the ultimate, decisive constraint for deploying hybrid plants is not project economics, but rather regulatory grid access.
ING - Scuola di Ingegneria Industriale e dell'Informazione
20-ott-2026
2025/2026
Mentre l'energia rinnovabile si espande rapidamente, la congestione della rete è diventata un collo di bottiglia critico. Il cable pooling offre una soluzione pratica raggruppando impianti eolici, solari fotovoltaici (PV) e sistemi di accumulo a batteria (BESS) dietro un'unica connessione di rete condivisa. Questa tesi introduce un framework di Programmazione Lineare Intera Mista (MILP) per co-ottimizzare sia il dimensionamento hardware, nello specifico la capacità della batteria e la sezione trasversale del cavo sotterraneo condiviso, sia il dispacciamento operativo di un impianto ibrido su scala utility. Integrando le perdite termiche dei cavi attraverso una formulazione lineare a tratti e utilizzando un clustering di serie temporali stratificato (K=24) integrato con due giorni di generazione estrema, il modello cattura efficacemente l'alta volatilità meteorologica e di mercato. Applicati a un caso di studio comparativo tra Italia e Paesi Bassi, i risultati rivelano una profonda divergenza nella redditività tra i due quadri normativi. Nel mercato italiano, stabile e caratterizzato da prezzi elevati, il curtailment fisico forzato associato ad architetture di pooling fortemente congestionate penalizza severamente la redditività. Al contrario, l'estrema volatilità e i frequenti prezzi negativi del mercato olandese spingono verso un curtailment economico intenzionale. In questo contesto, i massicci risparmi in conto capitale (CAPEX) derivanti dalla condivisione dell'infrastruttura rendono il pooling altamente redditizio. In definitiva, il Partial Pooling, ovvero l'utilizzo di una connessione di rete modestamente ampliata, emerge come l'ottimo economico globale in entrambe le regioni. Inoltre, l'ottimizzatore favorisce uniformemente cavi di grossa sezione (300 mm²) per abbattere drasticamente le perdite termiche nell'arco dei 30 anni di vita del progetto. Ciononostante, approfondite analisi di sensibilità confermano che il vincolo finale e decisivo per l'implementazione di questi impianti ibridi non è la fattibilità economica, bensì l'accesso regolamentato alla rete.
File allegati
File Dimensione Formato  
2026_10_Azimi_Executive Summary.pdf

non accessibile

Descrizione: Executive Summary
Dimensione 1.27 MB
Formato Adobe PDF
1.27 MB Adobe PDF   Visualizza/Apri
2026_10_Azimi_Thesis.pdf

non accessibile

Descrizione: Thesis
Dimensione 5.71 MB
Formato Adobe PDF
5.71 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/266031