The transmission network is fundamental for the correct operation of the electric system from energy generation to the final use. Recent studies have outlined that a vertical separation is a necessary, but not a sufficient condition for an optimal expansion of the transmission network. An appropriate incentive framework, both regulatory and institutional, is necessary in order for the network’s operator to achieve the desired result. Although both the vertical separation and an appropriate incentive system are applied in Italy, difficulties in siting procedures have to be pointed out. As a consequence, the delay between building a new power plant and adapting the network can be large. Previous work suggests that the network’s operator should adopt a proactive behavior, which means he could anticipate the siting procedures for the investment. In order to compare the efficiency of the proactive behavior two models have been realized in this thesis. The first model analyzes the connection of a new generation plant from a conventional source, the second one the connection of a new generation plant from a windpower source. Moreover, an application is carried out, with reference to two particularly interesting Italian cases: the realization of the Trino-Lacchiarella line and the Benevento II-Foggia line.

La rete di trasmissione è essenziale per il buon funzionamento del sistema elettrico, dalla generazione al consumo finale. Recenti studi hanno dimostrato che la separazione verticale è necessaria ma non sufficiente per indurre l’espansione ottimale della rete da parte dell’operatore della stessa. Risulta necessario, infatti, anche un opportuno schema di incentivi sia di tipo regolatorio sia di tipo istituzionale. In Italia è presente sia la separazione verticale sia un adeguato sistema incentivante ma, nonostante ciò, si riscontrano delle difficoltà nei processi di siting che dilatano la differenza temporale tra la costruzione di un nuovo impianto di generazione e l’adeguamento della rete. Allo scopo di risolvere tale problema, in letteratura, viene proposto un comportamento proattivo dell’operatore di rete, che implica l’anticipazione delle procedure di siting necessarie per la realizzazione degli investimenti. Con questo lavoro di tesi si realizzano due modelli per valutare l’efficienza del comportamento proattivo: il primo nel caso di nuova generazione da fonte convenzionale e il secondo nel caso di generazione da fonte eolica. Viene, quindi, proposta l’applicazione a due casi di particolare interesse estratti dal contesto italiano: la realizzazione della linea Trino-Lacchiarella e della linea Benevento II-Foggia.

Valutazione dell'efficienza del comportamento proattivo del TSO nell'adeguamento della rete di trasmissione elettrica a fronte di nuova potenza installata da fonte convenzionale ed eolica

PIAZZESE, CARMEN
2010/2011

Abstract

The transmission network is fundamental for the correct operation of the electric system from energy generation to the final use. Recent studies have outlined that a vertical separation is a necessary, but not a sufficient condition for an optimal expansion of the transmission network. An appropriate incentive framework, both regulatory and institutional, is necessary in order for the network’s operator to achieve the desired result. Although both the vertical separation and an appropriate incentive system are applied in Italy, difficulties in siting procedures have to be pointed out. As a consequence, the delay between building a new power plant and adapting the network can be large. Previous work suggests that the network’s operator should adopt a proactive behavior, which means he could anticipate the siting procedures for the investment. In order to compare the efficiency of the proactive behavior two models have been realized in this thesis. The first model analyzes the connection of a new generation plant from a conventional source, the second one the connection of a new generation plant from a windpower source. Moreover, an application is carried out, with reference to two particularly interesting Italian cases: the realization of the Trino-Lacchiarella line and the Benevento II-Foggia line.
GROPPI, ANGELAMARIA
ING IV - Scuola di Ingegneria Industriale
20-dic-2011
2010/2011
La rete di trasmissione è essenziale per il buon funzionamento del sistema elettrico, dalla generazione al consumo finale. Recenti studi hanno dimostrato che la separazione verticale è necessaria ma non sufficiente per indurre l’espansione ottimale della rete da parte dell’operatore della stessa. Risulta necessario, infatti, anche un opportuno schema di incentivi sia di tipo regolatorio sia di tipo istituzionale. In Italia è presente sia la separazione verticale sia un adeguato sistema incentivante ma, nonostante ciò, si riscontrano delle difficoltà nei processi di siting che dilatano la differenza temporale tra la costruzione di un nuovo impianto di generazione e l’adeguamento della rete. Allo scopo di risolvere tale problema, in letteratura, viene proposto un comportamento proattivo dell’operatore di rete, che implica l’anticipazione delle procedure di siting necessarie per la realizzazione degli investimenti. Con questo lavoro di tesi si realizzano due modelli per valutare l’efficienza del comportamento proattivo: il primo nel caso di nuova generazione da fonte convenzionale e il secondo nel caso di generazione da fonte eolica. Viene, quindi, proposta l’applicazione a due casi di particolare interesse estratti dal contesto italiano: la realizzazione della linea Trino-Lacchiarella e della linea Benevento II-Foggia.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2011_12_Piazzese.PDF.pdf

accessibile in internet per tutti

Descrizione: Testo della tesi
Dimensione 5.34 MB
Formato Adobe PDF
5.34 MB Adobe PDF Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/34501