This thesis aims to investigate methods for the redevelopment of an office building. The building is representative of that portion of housing stock built in the 50s-70s for the service industry, covering 60% of the total Italian stock. These buildings do not meet the current standards in terms of reduction of energy consumption since they were built before 1976, the year in which the first Italian law on energy saving entered into force. The methods studied contemplate solutions about transparent façade and systems powered by renewable energies: starting from the analysis of the state of the art, the work has led to the definition of some project outlines applicable to the case study. These hypotheses have been developed from a technological, energetic and economic point of view, as well as from the one of architectural-plant integration, in order to identify the optimal solution to be applied to the case study. This has led to the design of a mullions and transoms curtain wall with a system of integrated photovoltaic glasses. Subsequently this project was developed at executive level, defining the construction details and dimensioning of all components and within the operational level, with the drafting of a bill of quantities, a Gantt chart, and the construction site tables. An energy analysis of the building was also carried out to highlight the performance before and after the intervention and its consequential benefits.
Il presente elaborato di tesi ha come scopo l’indagine di metodi per la riqualificazione di un edificio ad uso uffici. L’edificio è rappresentativo di quella porzione di patrimonio edilizio per il terziario costruito negli anni ’50-’70, porzione che copre il 60% del totale italiano, e non rispondente alle attuali normative in materia di contenimento dei consumi energetici poiché antecedente al 1976, anno dell’entrata in vigore della prima legge italiana sul risparmio energetico. I metodi studiati contemplano soluzioni di involucro trasparente e di sistemi impiantistici alimentati da fonti energetiche rinnovabili: partendo dall’analisi dello stato dell’arte si è arrivati alla definizione di alcune ipotesi progettuali applicabili al caso di studio. I metodi studiati contemplano soluzioni di involucro trasparente e di sistemi impiantistici alimentati da fonti energetiche rinnovabili: partendo dall’analisi dello stato dell’arte si è arrivati alla definizione di alcune ipotesi progettuali applicabili al caso di studio. Tutto ciò ha portato alla realizzazione di un progetto di facciata continua a montanti e traversi con un sistema di vetri fotovoltaici integrati. Tale progetto è stato poi sviluppato a livello esecutivo, con la definizione dei particolari costruttivi e con il dimensionamento di tutti i componenti, e a livello operativo, con la stesura di un computo metrico estimativo, di un diagramma di Gantt e con la redazione di tavole di cantiere. E’ stata anche eseguita un’analisi energetica comparativa dell’edificio per evidenziare le prestazioni prima e dopo l’intervento e i benefici da questo derivanti.
Tipologie di involucro vetrato con sistema fotovoltaico integrato per la riqualificazione architettonico-energetica di edifici per il terziario
GIANOTTI, MARTINA;BORGACCI, SARA
2011/2012
Abstract
This thesis aims to investigate methods for the redevelopment of an office building. The building is representative of that portion of housing stock built in the 50s-70s for the service industry, covering 60% of the total Italian stock. These buildings do not meet the current standards in terms of reduction of energy consumption since they were built before 1976, the year in which the first Italian law on energy saving entered into force. The methods studied contemplate solutions about transparent façade and systems powered by renewable energies: starting from the analysis of the state of the art, the work has led to the definition of some project outlines applicable to the case study. These hypotheses have been developed from a technological, energetic and economic point of view, as well as from the one of architectural-plant integration, in order to identify the optimal solution to be applied to the case study. This has led to the design of a mullions and transoms curtain wall with a system of integrated photovoltaic glasses. Subsequently this project was developed at executive level, defining the construction details and dimensioning of all components and within the operational level, with the drafting of a bill of quantities, a Gantt chart, and the construction site tables. An energy analysis of the building was also carried out to highlight the performance before and after the intervention and its consequential benefits.File | Dimensione | Formato | |
---|---|---|---|
2013_04_Borgacci_Gianotti_01.pdf
solo utenti autorizzati dal 05/04/2014
Descrizione: Testo della tesi
Dimensione
14.04 MB
Formato
Adobe PDF
|
14.04 MB | Adobe PDF | Visualizza/Apri |
2013_04_Borgacci_Gianotti_02.pdf
solo utenti autorizzati dal 05/04/2014
Descrizione: Allegati
Dimensione
7.47 MB
Formato
Adobe PDF
|
7.47 MB | Adobe PDF | Visualizza/Apri |
2013_04_Borgacci_Gianotti_03.pdf
solo utenti autorizzati dal 05/04/2014
Descrizione: Tavole
Dimensione
3.49 MB
Formato
Adobe PDF
|
3.49 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/80057