The purpose of this case study is to verify the building information model efficacy (together with not exclusively geometrical data, such as times and costs) in order to optimise the project visualization and procedure, also from a graphic point of view. Cap. 1 During the first step we develop the architectural project, starting from the CAD 2D Milan City Council project, to the three-dimensional model of the building, exclusively re-elaborated with Revit 2013 (software conceded to students by Autodesk), using all the potentialities offered by this BIM model, which is maybe the literal interpretation of building information model for the main database for the project. The strength of this study is the ability to coordinate each element of the building in a unique database (by giving the chance to see immediately the results of every single review given in the model and reflected in the project) and to detect possible coordination problems. Cap. 2 During the second stage the Revit model is employed in an inter-operable way with Microsoft Excel: through a data exchange is possible to extract the abacus quantity survey, given the volumetric information of the materials, already matched to code of the price list. In the list there are all the items proceeded from the catalog of the estimated works for the project: from these items it is possible to generate a list of unitary prices, in order to have an estimate of the work. Cap. 3 Once the bill of quantity is estimated, there is the third and final stage, where it is possible to create the time schedule, by using Microsoft Project. Through this step we can modify manually, when needed, work duration by interacting with the Gantt chart.

Obiettivo di questo caso studio è la verifica dell’efficacia del building information model in abbinamento a dati non puramente geometrici, come i tempi ed i costi, per l’ottimizzazione del processo progettuale e della visualizzazione da un punto di vista grafico. Cap. 1 In una prima fase il progetto architettonico viene sviluppato, a partire dagli elaborati CAD 2D del progetto del Comune di Milano, fino ad arrivare al modello tridimensionale dell’edificio esclusivamente rielaborato in Revit 2013 (software che l’Autodesk concede in licenza studentesca), utilizzando tutte le potenzialità offerte da questo modello BIM, che è forse l’interpretazione più letterale di building information model come database principale per il progetto. La forza di questo approccio è la sua capacità di coordinare ogni elemento dell’edificio in un unico database, fornendo così la possibilità di vedere immediatamente i risultati di ogni revisione fatta nel modello e automaticamente riflessa nelle viste associate (disegni) e per rilevare eventuali problemi di coordinamento. Cap. 2 In una seconda fase invece il modello di Revit viene utilizzato in maniera interoperabile con il software Microsoft Excel, che attraverso uno scambio di dati consente di estrarre dal BIM l’abaco delle quantità, con espresse le volumetrie dei materiali già associate al codice di listino che fa riferimento al prezziario. Nel listino sono elencati gli articoli ricavati dal prezziario di riferimento relativi alle opere previste dal progetto e da questi articoli è possibile generare un elenco dei prezzi unitari e di conseguenza ricavare un preventivo dell’intervento. Cap. 3 Una volta definito il computo metrico estimativo (CME), si avvia la terza ed ultima fase, durante la quale è possibile procedere alla creazione del cronoprogramma tramite il software Microsoft Project modificando manualmente se necessario la durata delle lavorazioni interagendo con il diagramma di Gantt.

Metodi e modelli per lo sviluppo della documentazione progettuale. Dal progetto alla prefigurazione del cantiere

PINTI, LIDIA
2012/2013

Abstract

The purpose of this case study is to verify the building information model efficacy (together with not exclusively geometrical data, such as times and costs) in order to optimise the project visualization and procedure, also from a graphic point of view. Cap. 1 During the first step we develop the architectural project, starting from the CAD 2D Milan City Council project, to the three-dimensional model of the building, exclusively re-elaborated with Revit 2013 (software conceded to students by Autodesk), using all the potentialities offered by this BIM model, which is maybe the literal interpretation of building information model for the main database for the project. The strength of this study is the ability to coordinate each element of the building in a unique database (by giving the chance to see immediately the results of every single review given in the model and reflected in the project) and to detect possible coordination problems. Cap. 2 During the second stage the Revit model is employed in an inter-operable way with Microsoft Excel: through a data exchange is possible to extract the abacus quantity survey, given the volumetric information of the materials, already matched to code of the price list. In the list there are all the items proceeded from the catalog of the estimated works for the project: from these items it is possible to generate a list of unitary prices, in order to have an estimate of the work. Cap. 3 Once the bill of quantity is estimated, there is the third and final stage, where it is possible to create the time schedule, by using Microsoft Project. Through this step we can modify manually, when needed, work duration by interacting with the Gantt chart.
PAPETTI, MASSIMILIANO
ARC I - Scuola di Architettura e Società
23-apr-2013
2012/2013
Obiettivo di questo caso studio è la verifica dell’efficacia del building information model in abbinamento a dati non puramente geometrici, come i tempi ed i costi, per l’ottimizzazione del processo progettuale e della visualizzazione da un punto di vista grafico. Cap. 1 In una prima fase il progetto architettonico viene sviluppato, a partire dagli elaborati CAD 2D del progetto del Comune di Milano, fino ad arrivare al modello tridimensionale dell’edificio esclusivamente rielaborato in Revit 2013 (software che l’Autodesk concede in licenza studentesca), utilizzando tutte le potenzialità offerte da questo modello BIM, che è forse l’interpretazione più letterale di building information model come database principale per il progetto. La forza di questo approccio è la sua capacità di coordinare ogni elemento dell’edificio in un unico database, fornendo così la possibilità di vedere immediatamente i risultati di ogni revisione fatta nel modello e automaticamente riflessa nelle viste associate (disegni) e per rilevare eventuali problemi di coordinamento. Cap. 2 In una seconda fase invece il modello di Revit viene utilizzato in maniera interoperabile con il software Microsoft Excel, che attraverso uno scambio di dati consente di estrarre dal BIM l’abaco delle quantità, con espresse le volumetrie dei materiali già associate al codice di listino che fa riferimento al prezziario. Nel listino sono elencati gli articoli ricavati dal prezziario di riferimento relativi alle opere previste dal progetto e da questi articoli è possibile generare un elenco dei prezzi unitari e di conseguenza ricavare un preventivo dell’intervento. Cap. 3 Una volta definito il computo metrico estimativo (CME), si avvia la terza ed ultima fase, durante la quale è possibile procedere alla creazione del cronoprogramma tramite il software Microsoft Project modificando manualmente se necessario la durata delle lavorazioni interagendo con il diagramma di Gantt.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2013_04_Pinti_01.pdf

solo utenti autorizzati dal 09/04/2016

Descrizione: Testo della tesi
Dimensione 58.04 MB
Formato Adobe PDF
58.04 MB Adobe PDF   Visualizza/Apri
2013_04_Pinti_02.pdf

solo utenti autorizzati dal 09/04/2016

Descrizione: Allegato A
Dimensione 1.07 MB
Formato Adobe PDF
1.07 MB Adobe PDF   Visualizza/Apri
2013_04_Pinti_03.pdf

solo utenti autorizzati dal 09/04/2016

Descrizione: Allegato B
Dimensione 690.67 kB
Formato Adobe PDF
690.67 kB Adobe PDF   Visualizza/Apri
2013_04_Pinti_04.pdf

solo utenti autorizzati dal 09/04/2016

Descrizione: Allegato C
Dimensione 276.72 kB
Formato Adobe PDF
276.72 kB Adobe PDF   Visualizza/Apri
2013_04_Pinti_05.pdf

solo utenti autorizzati dal 09/04/2016

Descrizione: Allegato D
Dimensione 405.99 kB
Formato Adobe PDF
405.99 kB Adobe PDF   Visualizza/Apri
2013_04_Pinti_06.pdf

solo utenti autorizzati dal 09/04/2016

Descrizione: Allegato E
Dimensione 668.37 kB
Formato Adobe PDF
668.37 kB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/80373