It’s known that the process optimization for the design, execution and management of a building construction is increasingly important. So it’s more and more essential the development of an integrated design with a lot of professionals specialized in different sectors with the need to work together for the success of the building construction itself. It’s therefore necessary to have some instruments and management methodologies that allow a simpler and more profitable collaboration between the different figures involved. Among these methodologies, the Building Information Modelling turns out to be the most widespread because it allows to improve the efficiency of the entire building process by proposing a new design methodology. In this thesis, after evaluating some Italian and foreign experiences of application of BIM and having analyzed the BIM requirements, we will try to demonstrate how the use of this method, applied to a real case study, will lead to an improvement of the construction site management. After analyzing the processes encountered during our construction site experience, we propose the use of BIM for the improvement of some aspects such as preventive viewing of different processing, the management of safety in the workplace and economic management analyzed by the study of the Visual Related Progress Reports. The results obtained will then need to be transmitted to the workers who actually operate in the construction site. For this purpose, we pioneered the use of a tool that is increasingly asserting in other areas: the QR code. Furthermore, through the creation of a website, we have tried to improve the collaboration between the different figures involved in the construction process. With the use of this information technology we want to allow the creation of a continuous flow of information in such a way that we can achieve a true integrated design in all phases of the construction process.

Nella pratica edilizia risulta sempre più importante l’ottimizzazione dei processi per la progettazione, nell’esecuzione e nella gestione di un’opera. Fondamentale per questa ottimizzazione è senz’altro lo sviluppo di una progettazione integrata. Si avrà in questo caso un elevato numero di professionisti specializzati nei diversi settori aventi l’esigenza di collaborare al meglio per la buona riuscita dell’opera edilizia; è quindi sorta la necessità di avere strumenti ed metodologie di gestione che consentano una più semplice e proficua collaborazione tra i vari soggetti coinvolti. Tra questi il Building Information Modeling risulta essere quello che si sta maggiormente affermando in quanto permette di migliorare l’efficienza dell’intero processo edilizio proponendo una nuova metodologia di progettazione. In questo elaborato, dopo aver valutato alcune esperienze italiane ed estere di applicazione del BIM ed aver analizzato i BIM requirements, si cercherà di dimostrare come l’utilizzo di questo metodo, applicato ad un caso di studio reale, porti ad un miglioramento della gestione del cantiere. Dopo aver analizzato i processi riscontrati durante la nostra esperienza cantieristica, si propone l’utilizzo del BIM per il miglioramento di alcuni aspetti come la visualizzazione preventiva delle diverse lavorazioni, la gestione della sicurezza sul luogo di lavoro e la gestione economica dell’intervento analizzata mediante lo studio degli Stati di Avanzamento Lavori Visuali. I risultati ottenuti avranno poi la necessità di essere trasmessi alle maestranze che effettivamente opereranno in cantiere. A tal fine si sperimenterà quindi l’utilizzo di uno strumento che si sta sempre di più affermando in altri ambiti: i QR code. Inoltre attraverso la creazione di un sito web di cantiere si cercherà di migliorare la collaborazione tra i diversi soggetti impegnati nel processo edilizio. Con l’utilizzo di questi sistemi informatizzati si vuole quindi consentire la creazione di un flusso di informazioni continuo in modo tale da raggiungere una vera progettazione integrata in tutte le fasi del processo edilizio.

IT methods implementation for construction site. Information, design and control

TODARO, DAVIDE;SPALIVIERO, CHIARA
2012/2013

Abstract

It’s known that the process optimization for the design, execution and management of a building construction is increasingly important. So it’s more and more essential the development of an integrated design with a lot of professionals specialized in different sectors with the need to work together for the success of the building construction itself. It’s therefore necessary to have some instruments and management methodologies that allow a simpler and more profitable collaboration between the different figures involved. Among these methodologies, the Building Information Modelling turns out to be the most widespread because it allows to improve the efficiency of the entire building process by proposing a new design methodology. In this thesis, after evaluating some Italian and foreign experiences of application of BIM and having analyzed the BIM requirements, we will try to demonstrate how the use of this method, applied to a real case study, will lead to an improvement of the construction site management. After analyzing the processes encountered during our construction site experience, we propose the use of BIM for the improvement of some aspects such as preventive viewing of different processing, the management of safety in the workplace and economic management analyzed by the study of the Visual Related Progress Reports. The results obtained will then need to be transmitted to the workers who actually operate in the construction site. For this purpose, we pioneered the use of a tool that is increasingly asserting in other areas: the QR code. Furthermore, through the creation of a website, we have tried to improve the collaboration between the different figures involved in the construction process. With the use of this information technology we want to allow the creation of a continuous flow of information in such a way that we can achieve a true integrated design in all phases of the construction process.
ING VI - Scuola di Ingegneria Edile-Architettura
22-lug-2013
2012/2013
Nella pratica edilizia risulta sempre più importante l’ottimizzazione dei processi per la progettazione, nell’esecuzione e nella gestione di un’opera. Fondamentale per questa ottimizzazione è senz’altro lo sviluppo di una progettazione integrata. Si avrà in questo caso un elevato numero di professionisti specializzati nei diversi settori aventi l’esigenza di collaborare al meglio per la buona riuscita dell’opera edilizia; è quindi sorta la necessità di avere strumenti ed metodologie di gestione che consentano una più semplice e proficua collaborazione tra i vari soggetti coinvolti. Tra questi il Building Information Modeling risulta essere quello che si sta maggiormente affermando in quanto permette di migliorare l’efficienza dell’intero processo edilizio proponendo una nuova metodologia di progettazione. In questo elaborato, dopo aver valutato alcune esperienze italiane ed estere di applicazione del BIM ed aver analizzato i BIM requirements, si cercherà di dimostrare come l’utilizzo di questo metodo, applicato ad un caso di studio reale, porti ad un miglioramento della gestione del cantiere. Dopo aver analizzato i processi riscontrati durante la nostra esperienza cantieristica, si propone l’utilizzo del BIM per il miglioramento di alcuni aspetti come la visualizzazione preventiva delle diverse lavorazioni, la gestione della sicurezza sul luogo di lavoro e la gestione economica dell’intervento analizzata mediante lo studio degli Stati di Avanzamento Lavori Visuali. I risultati ottenuti avranno poi la necessità di essere trasmessi alle maestranze che effettivamente opereranno in cantiere. A tal fine si sperimenterà quindi l’utilizzo di uno strumento che si sta sempre di più affermando in altri ambiti: i QR code. Inoltre attraverso la creazione di un sito web di cantiere si cercherà di migliorare la collaborazione tra i diversi soggetti impegnati nel processo edilizio. Con l’utilizzo di questi sistemi informatizzati si vuole quindi consentire la creazione di un flusso di informazioni continuo in modo tale da raggiungere una vera progettazione integrata in tutte le fasi del processo edilizio.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2013_07_Spaliviero_Todaro.pdf

non accessibile

Descrizione: Testo della tesi
Dimensione 61.78 MB
Formato Adobe PDF
61.78 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/81069