In recent years BIM (Building Information Modeling) is affirming as a new project method. In the UK the government requires to all engaged in the design construction and management of publicly funded buildings and infrastructure to take part in this process by 2016, the other countries are moving slowly in this direction but it seems even more inevitable a definitive transaction to this new technology. In this thesis are analyzed the advantages and the possible applications of BIM, taking into account the limitations, the problems found and the requirements that the project team and the software have to satisfy in order to make BIM design really effective and able to meet the three level of design requirements. Then the Guide proposed for the use of BIM in order to lead the project team to design BIM models have been analyzed investigating their strong points. At last some indication about the realization of BIM safety plans have been proposed and applied in the case of study of bridge launching. The BIM model obtained has been developed and analyzed in all its construction phases

In questi ultimi anni il BIM (Building Information Modeling) si sta affermando come un nuovo metodo per progettare. Nel Regno Unito, a partire dal 2016, richiederà a tutte le figure coinvolte nella progettazione e nell’amministrazione dell’edilizia pubblica di prendere parte a questo processo, gli altri paesi si stanno muovendo più lentamente ma sembra sempre più inevitabile una definitiva transizione verso questo nuova tecnologia. In questa tesi vengono analizzati i vantaggi e le possibili applicazioni del BIM, tenendo conto però anche delle limitazioni, dei problemi riscontrati e i requisiti che i team di progettazione e software impiegati devono soddisfare affinché la progettazione BIM sia realmente efficiente ed in grado di rispondere alle richieste normative. Vengono poi analizzate le guide proposte per l’uso del BIM, create per aiutare il project team nella progettazione BIM, indagando sui loro punti di forza. Infine sono state proposte alcune indicazioni per la realizzazione di un piano di sicurezza BIM per poi applicarle nel caso di studio del varo di un ponte. Il modello BIM così ottenuto è stato sviluppato ed analizzato in ogni fase realizzativa.

Bridge launching site safety design using BIM

PAGANI, MARCO
2012/2013

Abstract

In recent years BIM (Building Information Modeling) is affirming as a new project method. In the UK the government requires to all engaged in the design construction and management of publicly funded buildings and infrastructure to take part in this process by 2016, the other countries are moving slowly in this direction but it seems even more inevitable a definitive transaction to this new technology. In this thesis are analyzed the advantages and the possible applications of BIM, taking into account the limitations, the problems found and the requirements that the project team and the software have to satisfy in order to make BIM design really effective and able to meet the three level of design requirements. Then the Guide proposed for the use of BIM in order to lead the project team to design BIM models have been analyzed investigating their strong points. At last some indication about the realization of BIM safety plans have been proposed and applied in the case of study of bridge launching. The BIM model obtained has been developed and analyzed in all its construction phases
CASSANO, MANUELE
ING VI - Scuola di Ingegneria Edile-Architettura
22-lug-2013
2012/2013
In questi ultimi anni il BIM (Building Information Modeling) si sta affermando come un nuovo metodo per progettare. Nel Regno Unito, a partire dal 2016, richiederà a tutte le figure coinvolte nella progettazione e nell’amministrazione dell’edilizia pubblica di prendere parte a questo processo, gli altri paesi si stanno muovendo più lentamente ma sembra sempre più inevitabile una definitiva transizione verso questo nuova tecnologia. In questa tesi vengono analizzati i vantaggi e le possibili applicazioni del BIM, tenendo conto però anche delle limitazioni, dei problemi riscontrati e i requisiti che i team di progettazione e software impiegati devono soddisfare affinché la progettazione BIM sia realmente efficiente ed in grado di rispondere alle richieste normative. Vengono poi analizzate le guide proposte per l’uso del BIM, create per aiutare il project team nella progettazione BIM, indagando sui loro punti di forza. Infine sono state proposte alcune indicazioni per la realizzazione di un piano di sicurezza BIM per poi applicarle nel caso di studio del varo di un ponte. Il modello BIM così ottenuto è stato sviluppato ed analizzato in ogni fase realizzativa.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2013_07_Pagani_01.pdf

non accessibile

Descrizione: Testo della tesi
Dimensione 21.16 MB
Formato Adobe PDF
21.16 MB Adobe PDF   Visualizza/Apri
2013_07_Pagani_02.pdf

non accessibile

Descrizione: Tavola di progetto 1
Dimensione 2.48 MB
Formato Adobe PDF
2.48 MB Adobe PDF   Visualizza/Apri
2013_07_Pagani_03.pdf

non accessibile

Descrizione: Tavola di progetto 2
Dimensione 2.47 MB
Formato Adobe PDF
2.47 MB Adobe PDF   Visualizza/Apri
2013_07_Pagani_04.pdf

non accessibile

Descrizione: Tavola di progetto 3
Dimensione 2.17 MB
Formato Adobe PDF
2.17 MB Adobe PDF   Visualizza/Apri
2013_07_Pagani_05.pdf

non accessibile

Descrizione: Tavola di progetto 4
Dimensione 2.82 MB
Formato Adobe PDF
2.82 MB Adobe PDF   Visualizza/Apri
2013_07_Pagani_06.pdf

non accessibile

Descrizione: Tavola di progetto 5
Dimensione 2.35 MB
Formato Adobe PDF
2.35 MB Adobe PDF   Visualizza/Apri
2013_07_Pagani_07.pdf

non accessibile

Descrizione: Tavola di progetto 6
Dimensione 2.43 MB
Formato Adobe PDF
2.43 MB Adobe PDF   Visualizza/Apri
2013_07_Pagani_09.pdf

non accessibile

Descrizione: Tavola di progetto 8
Dimensione 2.94 MB
Formato Adobe PDF
2.94 MB Adobe PDF   Visualizza/Apri
2013_07_Pagani_08.pdf

non accessibile

Descrizione: Tavola di progetto 7
Dimensione 3.03 MB
Formato Adobe PDF
3.03 MB Adobe PDF   Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/81209