Energy saving is currently one of the principal objectives of European policies. One of the predominant areas in which this policy is applied is, certainly, linked to the building efficiency. In the present work a study on the plant design of building E3 East is developed step by step. Such building is located in the center of Milan and it’s considered to be highly effcient. The following systems are considered in detail: hvac systems, plumbing and heating systems, antifire system and regulation system. The simulation results are interesting in terms of comparation between traditional thermal energy production systems and new systems of high efficiency integrated with PV’s systems.
Il risparmio energetico è, attualmente, uno degli obiettivi principe delle politiche europee, nonché mondiali. Uno degli ambiti preponderanti nei quali tale politica viene applicata è sicuramente quello legato all’efficienza dell’edificio. Nel presente elaborato si segue passo a passo la progettazione impiantistica dell’edificio E3 East, edificio considerato ad alta efficienza energetica. Si considerano gli impianti di condizionamento, quelli idrotermosanitari, per poi passare all’antincendio ed al sistema di regolazione. Interessanti risultano essere i risultati ottenuti attraverso la simulazione che consente il confronto tra sistemi di produzione di energia termica tradizionali con quelli ad alta efficienza, integrati dall’uso del sistema fotovoltaico.
Progettazione servizi tecnici e valutazione delle prestazioni energetiche dell'edificio E3 east Milano, Porta Nuova
FATTORE, MARTA
2013/2014
Abstract
Energy saving is currently one of the principal objectives of European policies. One of the predominant areas in which this policy is applied is, certainly, linked to the building efficiency. In the present work a study on the plant design of building E3 East is developed step by step. Such building is located in the center of Milan and it’s considered to be highly effcient. The following systems are considered in detail: hvac systems, plumbing and heating systems, antifire system and regulation system. The simulation results are interesting in terms of comparation between traditional thermal energy production systems and new systems of high efficiency integrated with PV’s systems.File | Dimensione | Formato | |
---|---|---|---|
2014_LUGLIO_FATTORE.pdf
accessibile in internet per tutti
Descrizione: TESTO DELLA TESI
Dimensione
66.78 MB
Formato
Adobe PDF
|
66.78 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/93828