The present study deals with the hydraulic ,energy and economic analysis needed to assess the real not expressed hydropower potential regarding Chiese and Oglio river located in Lombardia (Italy). The discussion begins with a brief introduction to hydropower, then focuses on authorization rules related to the use of surface water by identifying a type of intervention that minimizes environmental impact and the necessary construction permits. A type of system that minimizes environmental impact and the necessary construction permits is identified in-river with the central placed in the body of the crossbar. The latter returns the waters swirled immediately at the foot of the cross itself ensuring the hydraulic continuity of the watercourse. The structure of this type of plants and the most suitable turbines are analyzed briefly with particular attention to Archimedes screws and Very Low Head Turbine (VLH) Following the thesis continues by proposing a methodology of analysis of the two river courses considered which are analyzed individually in the next two chapters. Some sites of interest are selected and for them is carried out a technical-economic feasibility study. The work ends with the more accurate feasibility study for mini hydropower plant "flowing water" on Sarnico dam outflow of Iseo Lake (Italy). The design study includes the analysis of two possible system configurations and two possible plant layouts.
Il presente elaborato si occupa delle analisi idrauliche, energetiche, ed economiche necessarie a valutare il potenziale idroelettrico residuo per quanto riguarda le aste fluviali del Chiese e dell’ Oglio sublacuali. La trattazione inizia con una breve introduzione all’ idroelettrico, si concentra poi sulle norme autorizzative legate all’utilizzo delle acque superficiali. Una tipologia d’impianto che minimizza l’impatto ambientale e le pratiche autorizzative necessarie è individuato negli impianti ad acqua fluente in derivazione puntuale, con centrale collocata nel corpo della traversa. Quest’ultima restituisce le acque turbinate immediatamente al piede della traversa medesima garantendo la continuità idraulica del corso fluviale. La struttura degli impianti in derivazione puntuale e le turbine più adatte per i bassi salti geodetici vengono analizzate con particolare attenzione alle innovative coclee idrauliche e alle Very Low Head turbines (VLH). In seguito la tesi prosegue proponendo una metodologia d’analisi delle due aste fluviali considerate le quali vengono studiate singolarmente nei due capitoli successivi. Le due aste fluviali vengono ricostruite geoferenziando centrali idroelettriche presenti e richieste di concessione in istruttoria sino a selezionare alcuni siti d’interesse idroelettrico, per i quali viene calcolata la curva di durata delle portate e svolta un’analisi tecnico economica. Il lavoro si conclude con lo studio di fattibilità di massima per un impianto mini idroelettrico “ad acqua fluente” in derivazione puntuale sulla diga di Sarnico al deflusso del Lago d’Iseo: quest’ultimo prevede l’analisi di due possibili configurazioni impiantistiche e due possibili layout d’impianto.
Il mini idroelettrico in Lombardia : studio del potenziale dei fiumi Oglio e Chiese e analisi di fattibilità di un impianto in derivazione puntuale
GIANNOTTA, FABIO
2013/2014
Abstract
The present study deals with the hydraulic ,energy and economic analysis needed to assess the real not expressed hydropower potential regarding Chiese and Oglio river located in Lombardia (Italy). The discussion begins with a brief introduction to hydropower, then focuses on authorization rules related to the use of surface water by identifying a type of intervention that minimizes environmental impact and the necessary construction permits. A type of system that minimizes environmental impact and the necessary construction permits is identified in-river with the central placed in the body of the crossbar. The latter returns the waters swirled immediately at the foot of the cross itself ensuring the hydraulic continuity of the watercourse. The structure of this type of plants and the most suitable turbines are analyzed briefly with particular attention to Archimedes screws and Very Low Head Turbine (VLH) Following the thesis continues by proposing a methodology of analysis of the two river courses considered which are analyzed individually in the next two chapters. Some sites of interest are selected and for them is carried out a technical-economic feasibility study. The work ends with the more accurate feasibility study for mini hydropower plant "flowing water" on Sarnico dam outflow of Iseo Lake (Italy). The design study includes the analysis of two possible system configurations and two possible plant layouts.File | Dimensione | Formato | |
---|---|---|---|
Tesi Giannotta_rev_finale2.pdf
non accessibile
Descrizione: Testo della tesi
Dimensione
5.36 MB
Formato
Adobe PDF
|
5.36 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/99821