The purpose of this work is to evaluate the energy impact on the distribution network at the point of connection of an electric plant of a railway car park where some charging points for electric vehicles have been installed. The first part presents a summary of the current state of development of electric mobility, describing the various types of electric vehicles, the charging infrastructure and the possible applications in Smart Grids. In the second part, instead, a possible load curve of the car park in question is simulated and, based on the principle of Vehicle-to-Grid technology, an appropriate algorithm has been developed. Such algorithm, exploiting the possibility of a two-way energy flow between the connected vehicles and the electricity grid, perform a Peak Shaving of the load curve of the plant under examination in order to avoid absorption peaks normally difficult to manage by the DSO. The work also presents the coupling with a photovoltaic system designed specifically for the car park.

Scopo del presente lavoro è valutare l’impatto energetico apportato alla rete di distribuzione nel punto di allaccio dell’impiato elettrico di un parcheggio ferroviario nel quale sono stati predisposti alcuni punti di ricarica per veicoli elettrici. La prima parte presenta una summa circa l’attuale stato di sviluppo della mobilità elettrica, descrivendo le varie tipologie di veicoli elettrici, le infrastrutture di ricarica e le possibili applicazioni nelle Smart Grid. Nella seconda parte, invece, viene simulata una possibile curva di carico del parcheggio in esame e, sul principio della tecnologia Vehicle-to-Grid, è stato messo a punto un opportuno algoritmo che, sfruttando la possibilità di un flusso energetico bidirezionale tra i veicoli parcheggiati e la rete elettrica, va a ribilanciare la curva di carico dell’impianto sotto esame al fine di evitare pericolosi picchi di assorbimento, di norma difficilmente gestibili dal DSO. Il lavoro presenta anche l’accoppiamento con un impianto fotovoltaico progettato ad hoc per il parcheggio.

Connecting parks to the smart grid. A vehicle-to-grid feasibility study in the railway station car park of Ferrara

GARRUTO, RUBEN
2018/2019

Abstract

The purpose of this work is to evaluate the energy impact on the distribution network at the point of connection of an electric plant of a railway car park where some charging points for electric vehicles have been installed. The first part presents a summary of the current state of development of electric mobility, describing the various types of electric vehicles, the charging infrastructure and the possible applications in Smart Grids. In the second part, instead, a possible load curve of the car park in question is simulated and, based on the principle of Vehicle-to-Grid technology, an appropriate algorithm has been developed. Such algorithm, exploiting the possibility of a two-way energy flow between the connected vehicles and the electricity grid, perform a Peak Shaving of the load curve of the plant under examination in order to avoid absorption peaks normally difficult to manage by the DSO. The work also presents the coupling with a photovoltaic system designed specifically for the car park.
ING - Scuola di Ingegneria Industriale e dell'Informazione
25-lug-2019
2018/2019
Scopo del presente lavoro è valutare l’impatto energetico apportato alla rete di distribuzione nel punto di allaccio dell’impiato elettrico di un parcheggio ferroviario nel quale sono stati predisposti alcuni punti di ricarica per veicoli elettrici. La prima parte presenta una summa circa l’attuale stato di sviluppo della mobilità elettrica, descrivendo le varie tipologie di veicoli elettrici, le infrastrutture di ricarica e le possibili applicazioni nelle Smart Grid. Nella seconda parte, invece, viene simulata una possibile curva di carico del parcheggio in esame e, sul principio della tecnologia Vehicle-to-Grid, è stato messo a punto un opportuno algoritmo che, sfruttando la possibilità di un flusso energetico bidirezionale tra i veicoli parcheggiati e la rete elettrica, va a ribilanciare la curva di carico dell’impianto sotto esame al fine di evitare pericolosi picchi di assorbimento, di norma difficilmente gestibili dal DSO. Il lavoro presenta anche l’accoppiamento con un impianto fotovoltaico progettato ad hoc per il parcheggio.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2019_07_Garruto.pdf

Open Access dal 10/07/2020

Descrizione: Testo della tesi
Dimensione 5.19 MB
Formato Adobe PDF
5.19 MB Adobe PDF Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/148939