The reuse of existing buildings is important both in order not to disrupt the context of place and to maintain its integrity with that area rather than demolishing unused buildings and constructing another building. In case studies, when the internal spaces of the buildings were re-evaluated, it was seen that the current situation was evaluated, and prefabricated boxes were designed instead of the interior walls and partitions. This study aims to make unused buildings available for a long time with the prefabricated units after refurbishment, in order to bring them to new usage with little interventions for their future functions without any demolition. In addition, transformations also optimize energy performance as the building improves in many respects. While energy analysis was observed in the refurbishment samples, no information related to the physical conditions of the interiors evaluated with prefabricated units could be found. Based on this scope, the case study has been analysed to see how much these methods contribute to improving energy performance, and whether the prefabricated units can be used for office and housing to ensure comfort conditions. Finally, if the PV panel is designed to meet this energy requirement, the contribution of prefabricated units is examined. Considering that the use of prefabricated units and offices increases the equipment and service operation, in case of high energy requirement, PV panels are designed and discussed how much service and equipment can be supplied.

Il riutilizzo di edifici esistenti è importante sia per non interrompere il contesto del luogo sia per mantenere la sua integrità con quella zona piuttosto che demolire edifici inutilizzati e costruire un altro edificio. In casi di studio, quando gli spazi interni degli edifici sono stati rivalutati, è stato visto che la situazione attuale è stata valutata e sono state progettate scatole prefabbricate al posto delle pareti interne e delle partizioni. Questo studio mira a rendere disponibili a lungo gli edifici inutilizzati con le unità prefabbricate dopo i lavori di ristrutturazione, al fine di portarli a un nuovo utilizzo con piccoli interventi per le loro funzioni future senza alcuna demolizione. Inoltre, le trasformazioni ottimizzano anche le prestazioni energetiche in quanto l'edificio migliora sotto molti aspetti. Mentre l'analisi energetica è stata osservata nei campioni di ristrutturazione, non è stata trovata alcuna informazione relativa alle condizioni fisiche degli interni valutate con unità prefabbricate. Sulla base di questo ambito, il case study è stato analizzato per vedere in che misura questi metodi contribuiscono a migliorare le prestazioni energetiche e se le unità prefabbricate possono essere utilizzate per uffici e abitazioni per garantire condizioni di comfort. Infine, se il pannello fotovoltaico è progettato per soddisfare questo fabbisogno energetico, viene esaminato il contributo delle unità prefabbricate. Considerando che l'uso di unità e uffici prefabbricati aumenta il funzionamento delle attrezzature e dei servizi, in caso di elevato fabbisogno energetico, i pannelli fotovoltaici vengono progettati e discussi sulla quantità di servizi e attrezzature che possono essere forniti.

Building refurbishment and reuse of the old industrial building within the context of modularity. Case study : Bombelli, Milano

DEMIR, GOKAY;KATANA, BUSE
2018/2019

Abstract

The reuse of existing buildings is important both in order not to disrupt the context of place and to maintain its integrity with that area rather than demolishing unused buildings and constructing another building. In case studies, when the internal spaces of the buildings were re-evaluated, it was seen that the current situation was evaluated, and prefabricated boxes were designed instead of the interior walls and partitions. This study aims to make unused buildings available for a long time with the prefabricated units after refurbishment, in order to bring them to new usage with little interventions for their future functions without any demolition. In addition, transformations also optimize energy performance as the building improves in many respects. While energy analysis was observed in the refurbishment samples, no information related to the physical conditions of the interiors evaluated with prefabricated units could be found. Based on this scope, the case study has been analysed to see how much these methods contribute to improving energy performance, and whether the prefabricated units can be used for office and housing to ensure comfort conditions. Finally, if the PV panel is designed to meet this energy requirement, the contribution of prefabricated units is examined. Considering that the use of prefabricated units and offices increases the equipment and service operation, in case of high energy requirement, PV panels are designed and discussed how much service and equipment can be supplied.
MAININI, ANDREA GIOVANNI
MAZZUCCHELLI, ENRICO SERGIO
ARC I - Scuola di Architettura Urbanistica Ingegneria delle Costruzioni
18-dic-2019
2018/2019
Il riutilizzo di edifici esistenti è importante sia per non interrompere il contesto del luogo sia per mantenere la sua integrità con quella zona piuttosto che demolire edifici inutilizzati e costruire un altro edificio. In casi di studio, quando gli spazi interni degli edifici sono stati rivalutati, è stato visto che la situazione attuale è stata valutata e sono state progettate scatole prefabbricate al posto delle pareti interne e delle partizioni. Questo studio mira a rendere disponibili a lungo gli edifici inutilizzati con le unità prefabbricate dopo i lavori di ristrutturazione, al fine di portarli a un nuovo utilizzo con piccoli interventi per le loro funzioni future senza alcuna demolizione. Inoltre, le trasformazioni ottimizzano anche le prestazioni energetiche in quanto l'edificio migliora sotto molti aspetti. Mentre l'analisi energetica è stata osservata nei campioni di ristrutturazione, non è stata trovata alcuna informazione relativa alle condizioni fisiche degli interni valutate con unità prefabbricate. Sulla base di questo ambito, il case study è stato analizzato per vedere in che misura questi metodi contribuiscono a migliorare le prestazioni energetiche e se le unità prefabbricate possono essere utilizzate per uffici e abitazioni per garantire condizioni di comfort. Infine, se il pannello fotovoltaico è progettato per soddisfare questo fabbisogno energetico, viene esaminato il contributo delle unità prefabbricate. Considerando che l'uso di unità e uffici prefabbricati aumenta il funzionamento delle attrezzature e dei servizi, in caso di elevato fabbisogno energetico, i pannelli fotovoltaici vengono progettati e discussi sulla quantità di servizi e attrezzature che possono essere forniti.
Tesi di laurea Magistrale
File allegati
File Dimensione Formato  
2019_12_Katana_Demir.pdf

accessibile in internet per tutti

Descrizione: Thesis text
Dimensione 16.61 MB
Formato Adobe PDF
16.61 MB Adobe PDF Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/151158