The construction sector is today one of the main pollutants on the planet, both in terms of energy and resource consumption. The growth trend of the world population is still positive with an estimated increase in the urban population, which is where the greatest consumption and waste are concentrated. The situation is therefore not sustainable in the long term and thus the need arises for major redevelopment interventions of the building heritage, which at the European level, is highly dated and inefficient. The approaches to retrofit operations, however, often take place with traditional techniques that can lead to non-optimal management of resources, times and costs. Also, since these types of interventions are often fragmented and dispersive, these requalifications often fail to achieve the objectives set and frequently do not consider factors beyond the third dimension (3D), that is, of simple geometric modelling. A new type of approach is thus necessary, which draws from the Modern Method of Construction (MMC) that set of information and procedures necessary to revive a sector that very slowly incorporates technological progress and whose founding logics have remained substantially unchanged from the mid-twentieth century. The advantages brought about by the joint use of Design for Manufacturing and Assembly (DfMA) and Building Information Modeling (BIM) can in fact lead to significant improvements in terms of costs, time and energy consumption but at the same time increasing quality and security. We are therefore talking about a Decision Support System (DSS) able to guide all the figures involved in the early design stage, which considers the phases of: Geometric Modeling (3D), Time Planning (4D), Estimation and Cost Evaluation (5D), Performance Analysis (6D), Operational Management of Building (7D). The approach to these issues must take place with a holistic and multiparametric method, for an evaluation that truly takes into account all the variables involved and the reciprocal interactions between them.

Il settore delle costruzioni è oggi uno dei principali inquinanti del pianeta, sia in termini di consumo di energia che di risorse. Il trend di crescita della popolazione mondiale è tuttora positivo con un aumento stimato della popolazione urbana, dove si concentrano i maggiori consumi e sprechi. La situazione non è quindi sostenibile nel lungo periodo e si pone quindi la necessità di importanti interventi di riqualificazione del patrimonio edilizio, che a livello europeo, è molto datato e inefficiente. Gli approcci alle operazioni di retrofit, però, spesso avvengono con tecniche tradizionali che possono portare ad una gestione non ottimale di risorse, tempi e costi. Inoltre, poiché questi tipi di interventi sono spesso frammentati e dispersivi, queste riqualificazioni spesso non riescono a raggiungere gli obiettivi prefissati e spesso non considerano fattori oltre la terza dimensione (3D), cioè di semplice modellazione geometrica. È quindi necessario un nuovo tipo di approccio, che trae dai Modern Method of Construction (MMC) quell'insieme di informazioni e procedure necessarie a rilanciare un settore che ingloba molto lentamente il progresso tecnologico e le cui logiche fondanti sono rimaste sostanzialmente invariate dalla metà del XXesimo secolo. I vantaggi portati dall'utilizzo congiunto di Design for Manufacturing and Assembly (DfMA) e Building Information Modeling (BIM) possono infatti portare a significativi miglioramenti in termini di costi, tempi e consumi energetici ma allo stesso tempo aumentando qualità e sicurezza. Si tratta quindi di un Decision Support System (DSS) in grado di guidare tutte le figure coinvolte nella fase di early design, che considera le operazioni di: Geometric Modeling (3D), Time Planning (4D), Estimation and Cost Evaluation (5D), Analisi delle prestazioni (6D), Gestione operativa dell'edificio (7D). L'approccio a queste tematiche deve avvenire con un metodo olistico e multi-parametrico, per una valutazione che tenga veramente conto di tutte le variabili in gioco e delle reciproche interazioni tra loro.

Panelization design tool-parametric-BIM based tool for the renovation of a multi storey residential building

ENNA, MARCO;LENCIONI, LORENZO
2019/2020

Abstract

The construction sector is today one of the main pollutants on the planet, both in terms of energy and resource consumption. The growth trend of the world population is still positive with an estimated increase in the urban population, which is where the greatest consumption and waste are concentrated. The situation is therefore not sustainable in the long term and thus the need arises for major redevelopment interventions of the building heritage, which at the European level, is highly dated and inefficient. The approaches to retrofit operations, however, often take place with traditional techniques that can lead to non-optimal management of resources, times and costs. Also, since these types of interventions are often fragmented and dispersive, these requalifications often fail to achieve the objectives set and frequently do not consider factors beyond the third dimension (3D), that is, of simple geometric modelling. A new type of approach is thus necessary, which draws from the Modern Method of Construction (MMC) that set of information and procedures necessary to revive a sector that very slowly incorporates technological progress and whose founding logics have remained substantially unchanged from the mid-twentieth century. The advantages brought about by the joint use of Design for Manufacturing and Assembly (DfMA) and Building Information Modeling (BIM) can in fact lead to significant improvements in terms of costs, time and energy consumption but at the same time increasing quality and security. We are therefore talking about a Decision Support System (DSS) able to guide all the figures involved in the early design stage, which considers the phases of: Geometric Modeling (3D), Time Planning (4D), Estimation and Cost Evaluation (5D), Performance Analysis (6D), Operational Management of Building (7D). The approach to these issues must take place with a holistic and multiparametric method, for an evaluation that truly takes into account all the variables involved and the reciprocal interactions between them.
CUCUZZA, MARCO
PAGNACCO, TOMMASO
MASERA, GABRIELE
ARC I - Scuola di Architettura Urbanistica Ingegneria delle Costruzioni
28-apr-2021
2019/2020
Il settore delle costruzioni è oggi uno dei principali inquinanti del pianeta, sia in termini di consumo di energia che di risorse. Il trend di crescita della popolazione mondiale è tuttora positivo con un aumento stimato della popolazione urbana, dove si concentrano i maggiori consumi e sprechi. La situazione non è quindi sostenibile nel lungo periodo e si pone quindi la necessità di importanti interventi di riqualificazione del patrimonio edilizio, che a livello europeo, è molto datato e inefficiente. Gli approcci alle operazioni di retrofit, però, spesso avvengono con tecniche tradizionali che possono portare ad una gestione non ottimale di risorse, tempi e costi. Inoltre, poiché questi tipi di interventi sono spesso frammentati e dispersivi, queste riqualificazioni spesso non riescono a raggiungere gli obiettivi prefissati e spesso non considerano fattori oltre la terza dimensione (3D), cioè di semplice modellazione geometrica. È quindi necessario un nuovo tipo di approccio, che trae dai Modern Method of Construction (MMC) quell'insieme di informazioni e procedure necessarie a rilanciare un settore che ingloba molto lentamente il progresso tecnologico e le cui logiche fondanti sono rimaste sostanzialmente invariate dalla metà del XXesimo secolo. I vantaggi portati dall'utilizzo congiunto di Design for Manufacturing and Assembly (DfMA) e Building Information Modeling (BIM) possono infatti portare a significativi miglioramenti in termini di costi, tempi e consumi energetici ma allo stesso tempo aumentando qualità e sicurezza. Si tratta quindi di un Decision Support System (DSS) in grado di guidare tutte le figure coinvolte nella fase di early design, che considera le operazioni di: Geometric Modeling (3D), Time Planning (4D), Estimation and Cost Evaluation (5D), Analisi delle prestazioni (6D), Gestione operativa dell'edificio (7D). L'approccio a queste tematiche deve avvenire con un metodo olistico e multi-parametrico, per una valutazione che tenga veramente conto di tutte le variabili in gioco e delle reciproche interazioni tra loro.
File allegati
File Dimensione Formato  
2021_04_Enna_Lencioni.pdf

accessibile in internet per tutti

Descrizione: Master's Degree Thesis_ Enna-Lencioni
Dimensione 30.55 MB
Formato Adobe PDF
30.55 MB Adobe PDF Visualizza/Apri

I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10589/173964