The purpose of this paper is to conduct an analysis of the building process regarding the "Superbonus 110%", a measure aimed at energy efficiency and seismic retrofitting of the building stock. Initially, a brief description of the Superbonus, current regulations and its characteristics will be provided, and then the workflow necessary to successfully complete the process will be presented. In particular, it is intended to investigate the transmission of information during such a process, referring to the UNI 11337 and ISO 19650 standards and the principles introduced by them. The analysis will be divided into two different approaches: a traditional one, which has some critical issues in terms of information transmission, and one with BIM methodology, aimed at optimizing the transmission of data and information. Finally, an intermediate solution, closer to the needs of Superbonus 110% operators in the current context, will be proposed in order to facilitate the process.
ll presente elaborato ha l'obiettivo di effettuare un'analisi del processo edilizio riguardante il "Superbonus 110%", una misura finalizzata all'efficientamento energetico e all'adeguamento sismico del patrimonio edilizio. Inizialmente si fornirà una breve descrizione del Superbonus, le normative vigenti e le sue caratteristiche, per poi presentare il flusso di lavoro necessario per portare a termine il processo con successo. In particolare, si intende indagare sulla trasmissione delle informazioni durante un processo di questo genere, facendo riferimento alle normative UNI 11337 e ISO 19650 e ai principi da esse introdotti. L'analisi sarà suddivisa in due approcci differenti: uno tradizionale, che presenta alcune criticità in termini di trasmissione delle informazioni, e uno con metodologia BIM, volto a ottimizzare la trasmissione dei dati e delle informazioni. Infine, verrà proposta una soluzione intermedia, più vicina alle esigenze degli operatori del Superbonus 110% nel contesto attuale, allo scopo di agevolare il processo.
Analisi della gestione digitale del processo informativo edilizio Superbonus 110% : secondo le norme UNI 11337 e ISO 19650
Villalta Machaca, Edson Alejandro
2022/2023
Abstract
The purpose of this paper is to conduct an analysis of the building process regarding the "Superbonus 110%", a measure aimed at energy efficiency and seismic retrofitting of the building stock. Initially, a brief description of the Superbonus, current regulations and its characteristics will be provided, and then the workflow necessary to successfully complete the process will be presented. In particular, it is intended to investigate the transmission of information during such a process, referring to the UNI 11337 and ISO 19650 standards and the principles introduced by them. The analysis will be divided into two different approaches: a traditional one, which has some critical issues in terms of information transmission, and one with BIM methodology, aimed at optimizing the transmission of data and information. Finally, an intermediate solution, closer to the needs of Superbonus 110% operators in the current context, will be proposed in order to facilitate the process.File | Dimensione | Formato | |
---|---|---|---|
Tesi_EAVM_10429119.pdf
Open Access dal 18/04/2024
Descrizione: Gestione Digitale del processo edilizio Superbonus 110% con riferimento alle norme UNI 11337 e ISO 19650
Dimensione
13.59 MB
Formato
Adobe PDF
|
13.59 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/212415