The degree thesis developed concerns the study of the cave system located between Valeggio sul Mincio and Marengo, a territory split between two provinces, inserted as a foreign and degradation element in a consolidated agrarian context typical of the Mantuan and Verona plains. The area in question generates problems related to the effects of extraction activities on the landscape and the environmental recovery of abandoned sites. The aim of this work is to find design solutions to mitigate the impacts caused on the landscape by the installation of the quarries, while re-qualifying the territory in which they are inserted, in order to integrate the quarrying activity with the actions of renaturation and redevelopment of the sites decommissioned. The followed path provided for the analysis of the current legislation on mining at national and local level, followed by the observation of the scope of study conducted through the study of cartography and inspections; on this basis, criticalities and opportunities were identified relating to the various aspects of interaction between the territory and the quarries. These problems and opportunities, together with the research carried out on a series of related case studies, have been the starting point for the development of the extraction project; project that is based on four main themes linked by a key theme, pursuing the intent of mitigating the tangible impacts produced by mining and enhancing the landscape of the quarries linked to the memory of places, which does not erase the traces left by the human action on the territory but returns a new meaning and a new value where it had been subtracted.
La tesi di laurea sviluppata riguarda lo studio del sistema di cave situato tra Valeggio sul Mincio e Marengo, un territorio posto a cavallo di due provincie, inserito quale elemento estraneo e di degrado in un contesto agrario consolidato tipico della pianura mantovana e veronese. L’area in oggetto pone problematiche relative agli effetti delle attività estrattive sul paesaggio e al recupero ambientale dei siti dismessi. Obiettivo del presente lavoro è ricercare soluzioni progettuali atte a mitigare gli impatti provocati sul paesaggio dall’insediamento delle cave, riqualificando al contempo il territorio in cui si inseriscono, al fine di integrare l’attività di cava con le azioni di rinaturazione e riqualificazione dei siti dismessi. Il percorso seguito ha previsto l’analisi della normativa vigente in materia estrattiva a livello nazionale e locale, seguita dall’osservazione dell’ambito di studio condotta attraverso studio delle cartografie e sopralluoghi; su tale base sono state rilevate delle criticità ed opportunità relative ai diversi aspetti di interazione tra territorio e cave. Queste criticità ed opportunità, unitamente alla ricerca condotta su una serie di casi studio affini, hanno costituito il punto di partenza per lo sviluppo del progetto dell’ambito estrattivo; progetto che si articola su quattro temi progettuali collegati da un tema cardine, perseguendo l’intento della mitigazione degli impatti ormai tangibili prodotti dall’attività estrattiva e di una valorizzazione del paesaggio delle cave legata alla memoria dei luoghi, che non cancella le tracce lasciate dall’azione dell’uomo sul territorio ma restituisce un nuovo significato ed un nuovo valore ove esso era stato sottratto.
Paesaggi (ri)cavati
MARANGOTTO, RODOLFO
2016/2017
Abstract
The degree thesis developed concerns the study of the cave system located between Valeggio sul Mincio and Marengo, a territory split between two provinces, inserted as a foreign and degradation element in a consolidated agrarian context typical of the Mantuan and Verona plains. The area in question generates problems related to the effects of extraction activities on the landscape and the environmental recovery of abandoned sites. The aim of this work is to find design solutions to mitigate the impacts caused on the landscape by the installation of the quarries, while re-qualifying the territory in which they are inserted, in order to integrate the quarrying activity with the actions of renaturation and redevelopment of the sites decommissioned. The followed path provided for the analysis of the current legislation on mining at national and local level, followed by the observation of the scope of study conducted through the study of cartography and inspections; on this basis, criticalities and opportunities were identified relating to the various aspects of interaction between the territory and the quarries. These problems and opportunities, together with the research carried out on a series of related case studies, have been the starting point for the development of the extraction project; project that is based on four main themes linked by a key theme, pursuing the intent of mitigating the tangible impacts produced by mining and enhancing the landscape of the quarries linked to the memory of places, which does not erase the traces left by the human action on the territory but returns a new meaning and a new value where it had been subtracted.File | Dimensione | Formato | |
---|---|---|---|
2017_12_Marangotto_01.pdf
accessibile in internet per tutti
Descrizione: Testo della tesi
Dimensione
23.09 MB
Formato
Adobe PDF
|
23.09 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_02.pdf
accessibile in internet per tutti
Descrizione: Tavola 01
Dimensione
37.35 MB
Formato
Adobe PDF
|
37.35 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_03.pdf
accessibile in internet per tutti
Descrizione: Tavola 02.A
Dimensione
26.2 MB
Formato
Adobe PDF
|
26.2 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_04.pdf
accessibile in internet per tutti
Descrizione: Tavola 02.B
Dimensione
25.31 MB
Formato
Adobe PDF
|
25.31 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_05.pdf
accessibile in internet per tutti
Descrizione: Tavola 02.C
Dimensione
24.59 MB
Formato
Adobe PDF
|
24.59 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_06.pdf
accessibile in internet per tutti
Descrizione: Tavola 02.D
Dimensione
25.74 MB
Formato
Adobe PDF
|
25.74 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_07.pdf
accessibile in internet per tutti
Descrizione: Tavola 02.E
Dimensione
24.73 MB
Formato
Adobe PDF
|
24.73 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_08.pdf
accessibile in internet per tutti
Descrizione: Tavola 03
Dimensione
29.59 MB
Formato
Adobe PDF
|
29.59 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_09.pdf
accessibile in internet per tutti
Descrizione: Tavola 04.A
Dimensione
25.74 MB
Formato
Adobe PDF
|
25.74 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_10.pdf
accessibile in internet per tutti
Descrizione: Tavola 04.B
Dimensione
26.1 MB
Formato
Adobe PDF
|
26.1 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_11.pdf
accessibile in internet per tutti
Descrizione: Tavola 05.A
Dimensione
14.07 MB
Formato
Adobe PDF
|
14.07 MB | Adobe PDF | Visualizza/Apri |
2017_12_Marangotto_12.pdf
accessibile in internet per tutti
Descrizione: Tavola 05.B
Dimensione
21.26 MB
Formato
Adobe PDF
|
21.26 MB | Adobe PDF | Visualizza/Apri |
I documenti in POLITesi sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/10589/138242